MATERIALS MONITORING REPORT

DESCRIPTION
Concrete/Structural works
CHB #4
CHB #6
16mm RSB x 6m
12mm RSB x 6m
10mm RSB x 6m
G.I. Tie Wire #16
Formworks
3/4 "thk Marine Plywood
CWN No. 4
CWN No. 3
Plumbing and Sanitary Works
A. C.R and Kitchen Sink
Faucet
PVC Pipe, 100 x 3mts.
PVC Pipe, 50
PVC Elbow, 50
Tee, 100 x 100
Tee, 100 x 50
Cleanout 100
P-Trap 50
Neltex 400 cc
B. Waterline
uPVC Pipe, 20 mm
20 mm elbow
20 mm elbow w/ Thread
20 mm Tee elbow w/ thread
Electrical Works
20mm dia. Rigid PVC Pipe
2" x 4" Utility Box
4" Octagonal Junction Box
4 Branches Panel Box
TINSMITHRY WORKS
Metal Roofing, pre-painted long span Ga. 26 G.I. roofing
Center Capping
Ridge Roll
2 x 6 x 2mm cold formed light steel C-purlins
Welding Rod
PAINTING (including patching and sealing, etc.)
Concrete Surfaces (Exterior)
Red Oxide Primer
Paint Thinner
DOORS
Door Jamb 210 x 90
Door Jamb 210 x 70
WINDOWS
W/4, Louver Blocks including mortar

HOUSING

LAND DEV'T.

Total Qty.

16 pcs.

16 pcs.

4 pcs.

4 pcs.

8 pcs.
8 pcs.
26 pcs.
10 pcs.
10 pcs.

8 pcs.
8 pcs.
26 pcs.
10 pcs.
10 pcs.

1 Can

1 Can

20 pcs.
42 pcs.

20 pcs.
42 pcs.

12 pcs.

12 pcs.

32 pcs.
12 pcs.

32 pcs.
12 pcs.

32 pcs.
1 Box

32 pcs.
1 Box

112 pcs.

112 pcs.

Prepared by:

Attested by:

Norwin L. Garcia

Raymond De Vero / Arthur Bihasa

Documentation/ Timekeeper

Leadman/Checker

Checked by:

Noted by:

Teofi James Valdez

Fortunato Jesus G. Daigan

Site Engineer

Construction Manager