liquid
1m/ s
vapour
u=0,0305
845,7 kg /m3
1 m/s
3
3,85 kg/m
u=0, 4510 m/ s
Perhitungan BMrata-rata
BM rata rata ( X CO xBM CO ) ( X CH 3OH xBM CH 3OH ) ( X CH 3CO OC H xBM CH 3COOCH )
BM rata rata (0,907 x 28) (0,0713x32) (0,087 x60)
BM rata rata 31,74kg / kmol
Perhitungan Ac
Ac=
V .(BM ratarata )
u .3600 . v
Perhitungan Diameter
D
4 Ac
4 x 0,787 m3
3,14
= 1,0012 m
= 39,37 in
: 0,125 mm/tahun
Umur pakai
: 10 tahun
mm
10 tahun=1,250 mm=0,0492
tahun
Pdesain
: 52,905 psia
Diameter
: 1,0013 m = 39,37 in
Jari-jari
: 19,685 in
: 6.500
: 0,85
Cc
: 0,0492 in
PR
+Cc
SE0,6 P
52,905 19,685
+0,0492
0,85 65000,6 52,905
0,2388
6,606 mm
: Torispherical Head
Pdesain
: 52,905 psia
Diameter
: 39,37 in
Cc
: 0,0492 in
0,885 PD
+Cc
SE0,1 P
(Jawad,1984)
0,3 832
9,733 mm
v CO
v CH 3OH
v CH 3OK
m CO
CO
m CH 3OH
CH 3OH
m CH 3OK
CH 3OK
1400 kg/jam
1120 m 3 /jam
3
1,250 kg/m
4800 kg/jam
6,068 m 3 /jam
791 kg/m 3
363,65
0,213 m 3 /jam
3
1700 kg/m
v 0 v CO v CH 3OH v CH 3OK
1120 6,608 0,231
1126,281m 3 /jam
FCO
FCO 1400
kg/jam
50 kmol/jam 50000 mol/jam
28 kg/kmol
Konsentrasi awal CO
C CO,0
C CO
FCO
50000 mol/jam
44,398 mol/m 3
v0
1126,281 m 3 /jam
14,95kJ / mol
Konsentrasi CO
C CO
C CO C CO,0 1 x
CCO =1400 x (10,3)
CCO =4732,287 mol/m3
rCO k.CCO
Laju reaksi
Volume CSTR
VCSTR FC O ,0
x CO
- rCO
CCO,0 v 0
v0
x CO
k CCO,0 1 x
x CO
k 1 x
1126,281 m 3 /jam
0,3
35,1jam 1 0,3
1
13,751 m 3
5
Volume desain
Faktor keamanan = 20%
V 1,2 Vcalculated
V 1,2 13,751
V 16,501 m 3
1
D 2 H
4
16,501
1
D 2 (1,5D)
4
16,501 1,1771D 3
D3
16,501
1,177
D 3 14,019
D
14,019
campuran=621,024 kg /m3
Phidrostatik =
g
kg
h=621,024 9.8 3,616=22007,103
2
gc
m. s
( )
0,220 atm
Poperasi=Preaksi + P hidrostatik
Poperasi=3+ 0,220
Poperasi=3,220 atm
Faktor keamanan untuk perancangan tekanan desain adalah 30% dari
tekanan operasi, sehingga tekanan desain:
Pdesain=1,3 3,220 atm
Pdesain=4,186 atm=61,536 psi
e. Penentuan Faktor Korosi
Bahan yang digunakan pada perancangan ini adalah High Alloy Steel,
laju korosi yang dipakai yaitu 0,125 mm/tahun dan peramalan pemakaian
desain adalah 10 tahun. Maka faktor korosi (CC):
C c =0,125
mm
10 tahun=1,250 mm=0,0041 ft=0,0492
tahun
Pdesain=61,536 psia
Pdesain=P=61,536
lb
=61,536 psia
2
1
1
Jari jari ( R ) = D= 94,921=47,460
2
2
Allowable Stresses ( S )=13750 psia
PR
+C c
SE0,6 P
(Brownell
&
Young,
275)
Tebal dinding ( t ) =
61,536 43,7480
+ 0,0492
( 13750 0,85 )(0,6 61,536)
Faktor korosi
= 0,0492 in
Pdesain=61,536 psia
Pdesain=P=61,536
lb
=61,536 psia
2
Diameter ( D )=94,921
Allowable Stresses ( S )=13750 psia
Effisiensi Sambungan ( E )=0,85
Maka,
Tebal tutup ( t )=
PD
+C c
2 SE0,2 P
Tebal tutup ( t )=
61,536 87,4961
+0,0492
( 2 13750 0,85 )(0,2 61,536)
Menghitung Debit
Debit =
(SUMBER)
10579,2
ft 3
ft 3
214,024
0,0594
49,43
h
s
(SUMBER)
ID optimum =1,898 in
Berdasarkan data pada Tabel A.5 (Geankoplis) diperoleh data ukuran pipa
sstandar dengan diameter dalam yang mendekati hasil perhitungan adalah :
Diameter nominal
= 2 in
Schedule Number
= 80
9
Inside diameter, ID
= 0,0205 ft2
Laju alir, V
NRE =
Q
A
0,0594
ft
m
2,9 0,883
0,0205
s
s
0,000396
hc 0,55 x 1
A1 2
0,883 2
J
0,214
2
kg
hex 1 x 1
A1 2
1 x 1 - 0
0,883 2
J
0,391
2
kg
Hex =
c. Head loss pipa lurus
Digunakan pipa jenis commercial steel dengan harga = 4,6x10-5
Kekasaran pipa =
0,000046
0,000934
D
0,0492
10
V2
0,883 2
J
1 x 0,17
0,665
2
2
kg
e. Headloss belokan
Tee (1 buah)
hf n kf
V2
0,883 2
J
1 x 1
0,391
2
2
kg
f. Headloss total
Total Headloss
= 4,88
J
kg
P
Ws
P1 P2
Ws
P P2 101.325 4.559.625
J
- Ws 1
5629,17
792
kg
pompa sentrifugal pada 0,1139 m3/menit adalah 45% (Turton, hal 369)
Hp =
- Ws m
- ( -5629,17 ) 150
=
= 15,68 kW
0,45
C4.Cooler (E-103)
Kondisi operasi
Fluida panas
Tin
= 199,8C = 391,64F
Tout
= 45C = 113F
= 30C = 86F
Tout
= 40C = 104F
45oC
40oC
30oC
T LMTD
Perhitungan nilai
Fluida panas
(F)
391,64
113
T1
T2
TLMTD
t1
t2
Fluida dingin
(F)
86
104
T
(F)
279
27
(2 T1 )
ln
T LMTD =
T2
T1
(279 27 )
279
ln
27
T LMTD = 107,8
UD = 26 Btu/ jam ft F
Q = 63,22 kJ/s = 215714,746 Btu/h
A
Q
U D x TLMTD
13
215714,746 Btu/h
= 76,956 ft 2
2
26 Btu/ ft F 107,8
= 16
ID (Inside Diameter)
= 0,620 in
= 0,1963 ft
A
L ao
L (ft)
13
14
15
16
Required
No.Tubes
30,0564
28,0024
26,1356
24,5021
Dipilih shell and tube dengan panjang 13 ft dan memiki 30 tube dengan
diameter shell sebesar 8 in (triangular)
(Kern, hal.
150, 1965)
= 30 0,1963 13
= 76,557 f t 2
U D koreksi
Q
A x LMTD
215714,746 Btu/jam
76,557 f t 2 107,8
14
at
(30 x 0,302)
(144 x 2)
= 0,0303 ft
laju alir
at
1200,78 lb/jam
= 38202,278 lb/ ft2 jam
2
0,0303 ft
Perhitungan bilangan Reynold
T = 99,5C
= 0,2975 lb/ft. jam
Dt = 0,62 in = 0,0517 ft
Nre
Dt x Gt
k = 0,363 Btu/h.ft.F
15
k cp
h i jH
ID k
= 45
0,363
0,62
)(
1/3
1088,06 x 0,2976
0,0135
1/3
OD
h io h i
= 295,8
(0,62
0,75 )
2
= 244,541 Btu/jam ft
Fluida panas pada shell
= 8 in
Pitch
= 1 in
OD
= 0,75 in
= PT OD
= 0,25 in
as
as
8 in x 0,25 x 8
0,0889ft 2
144 x 1
laju alir
as
3086,42 lb/jam
2
=27777,7 lb/ ft jam
2
0,0889 ft
16
= 0,0532 lb/ft.jam
Pitch
= 1 in = 0,0833 ft
OD
= 0,75 in = 0,0625 ft
( (
4 PT 2 3,14
OD2
4
))
Ds =
(4 0,0833 2 ft - 3,14
=
0,06252 ft
4
( 3,14 0,062532 ft )
Nre =
)) = 1,264 ft
Ds Gs
= 500
k
Ds
cp
k
1/3
( )( )
0,0135
1,264
)(
0,25 0,532
0,0135
1/3
= 60,781 Btu/jam ft
h io x h o
h io h o
17
( 244,541 60,781 )
( 244,541+ 60,781 )
48,681 Btu/jam ft 2
Uc Ud
Uc x U d
=
48,681 - 26,135
48,681 x 26,135
2
s=1
Pt
f x Gt 2 x L x passes
5,22 x 1010 x Dt x s x1
=
(0,00009 38202,2782 13 2)
( 5,22 1010 ) 0,0516 1 1
= 0,0052 psi
V2
= 0,001
2g
18
42
0,001
1
= 0,08 psi
P total = P t1 + Pt2
P total = 0,0052 psi + 0,08 psi
P total = 0,0813 psi
P pada tube< 10 psi makamemenuhi syarat
s = 1,29
n 1 12 x
L
Baffle space
(Kern, hal 151, 1965)
=12
13 ft
= 234
0,67 ft
2
Pshell =
(f Gs ID shell (n+1))
( 5,221010 ) Ds s 1
19
Heater (E-101)
Kondisi operasi
Fluida panas
Tin
= 100C = 212F
Tout
= 100C = 212F
= 33,6C = 92,48F
Tout
= 80C = 176F
100oC
20
100oC
80oC
33,6oC
T LMTD
Perhitungan nilai
Fluida panas
(F)
212
212
T1
T2
TLMTD
t1
t2
Fluida dingin
(F)
92
176
T
(F)
120
36
(2 T1 )
ln
T LMTD =
T2
T1
(120 36 )
120
ln
36
T LMTD = 69,6
Q
U D x TLMTD
585383,71 Btu/h
2
= 42,052 ft
2
200 Btu/ ft F 69,9
Dari (kern, 1965) Tabel 10, halaman 843, diperoleh spesifikasi tube sebagai
berikut :
OD (Outside Diameter) = 1 in
BWG
= 14
ID (Inside Diameter)
= 0,8340 in
N t=
= 0,2618 ft
A
L ao
L (ft)
10
11
12
13
Required
No.Tubes
16,0627
14,6025
13,3856
12,3560
Dipilih shell and tube dengan panjang 10 ft dan memiki 16 tube dengan
diameter shell sebesar 8 in (triangular)
A = N t ao L
(Kern, hal.
150, 1965)
= 16 0,2618 10
= 41,88 f t
U D koreksi
Q
A x LMTD
585383,71 Btu/jam
41,88 f t 2 69,6
N' t x a' t
144 x passes
at
(16 x 0,546)
(144 x 2)
= 0,0303 ft 2
laju alir
at
10582,18 lb/jam
= 181318,68 lb/ ft2 jam
2
0,0303 ft
Perhitungan bilangan Reynold
= 0,1447 lb/ft. jam
Dt = 0,8340 in = 0,0695 ft
Nre
Dt x Gt
k = 0,124 Btu/h.ft.F
k cp
h i jH
ID k
0,124
= 250
0,069
)(
1/3
30,753 x 0,1447
0,124
OD
h io h i
= 1471,193
(0,069
0,083 )
2
= 14723,7 Btu/jam ft
Fluida panas pada shell
= 8 in
Pitch
= 1,25 in
OD
= 1 in
= PT OD
= 0,25 in
as
as
8 in x 0,25 x 8
0,0889ft 2
144 x 1
laju alir
as
915,265 lb/jam
2
=10296,73 lb/ ft jam
2
0,0889 ft
= 0,0508 lb/ft.jam
Pitch
= 1,25 in = 0,1042 ft
OD
= 1 in = 0,083 ft
( (
4 PT 2 3,14
OD2
4
))
Ds =
24
(4 0,1042 2 ft - 3,14
=
)) = 0,99 ft
0,0832 ft
4
( 3,14 0,0832 ft )
Nre =
Ds Gs
= 520
k
Ds
cp
k
1/3
( )( )
0,0145
0,99
)(
639,58 0,508
0,0145
1/3
= 99,618 Btu/jam ft
h io x h o
h io h o
( 14723,7 99,618 )
( 14723,7+ 99,618 )
98,95 Btu/jam ft 2
Uc Ud
Uc x U d
=
98,95 - 200,78
98,95 x 200,78
2
f = 0,00015
s = 0,79
Pt
f x Gt 2 x L x passes
5,22 x 1010 x Dt x s x1
(0,00015 181318,72 10 2)
( 5,22 1010 ) 0,0695 0,79 1
= 0,0344 psi
V2
= 0,42
2g
4 x passes V 2
x
s
2g
(Kern, hal 151, 1965)
42
0,42
0,79
= 4,253 psi
P total = P t1 + Pt2
P total = 0,034 psi + 4,253 psi
P total = 4,2876 psi
P pada tube< 10 psi makamemenuhi syarat
s=1
n 1 12 x
L
Baffle space
(Kern, hal 151, 1965)
=12
10 ft
= 180
0,67 ft
26
Pshell =
27