PIPING CONSTRUCTION AND MECHANICAL

EQUIPMENT INSTALLATION WORK FOR


COOLING WATER SYSTEM OF PH-6 PROJECT

INSPECTION REPORT
FORM NO:: EQP-001
Equipment Item No.
Equipment Name
Date

: ..
: ..
: ..

Job No
Client

: .
: .

1. Type of Inspection Item


Inspection/Test/Examination/Check

2. Inspection Item

3. Inspection Result

4. Remark

Prepare by :
HAP

( ______________________ )

Inspected by :
SUAR ALAM ENGINEERING

( _________________________ )

Witnessed/Approved by :
ASC

( __________________ )

Date :

Date :

Date :

PIPING CONSTRUCTION AND


MECHANICAL EQUIPMENT INSTALLATION
WORK FOR COOLING WATER SYSTEM OF
PH-6 PROJECT

PADDING REPORT
Equipment Tag No.
Eq. Description
Date

: ..
: ..
: ..
FORM NO: EQP-002

Sketch of padd positions :

ELEVATION
Measuring Location
1
2
3
4
5
6

Actual (mm)

Design (mm)

7
8
9
10
Remarks : 1. Elevation shall be within 3 mm from design.
2. Pad position under jack bolt or as per design.

Prepare by :
HAP

( ______________________ )
Date :

Inspected by :
SUAR ALAM ENGINEERING

( _________________________ )
Date :

Witnessed/Approved by :
ASC

( _______________________ )
Date :

PIPING CONSTRUCTION AND MECHANICAL


EQUIPMENT INSTALLATION WORK FOR
COOLING WATER SYSTEM OF PH-6 PROJECT

ELEVATION / LEVELING RECORD


(HORIZONTAL VESSEL AND HEAT EXCHANGER)
FORM NO:
Equipment Item No.

:.

Date

:.

Equipment Name

:.

Job. No.

:.

Design Elevation

:.

Client

:.

Sketch

Elevation
A
B
C
D

Prepared by ;

Elevation

Design

Actual

Inspected by :

Deviation

Remarks

Witnessed/reviewed by :

(________________)
HAP

(____________________)
SUAR ALAM ENGINEERING

(____________________)
ASC

Date : ...........................

Date : ...........................

Date : ...........................

FORM NO:

C
D

Remarks

/reviewed by :

STC-001

____________)

PIPING CONSTRUCTION AND


MECHANICAL EQUIPMENT
INSTALLATION WORK FOR
COOLING WATER SYSTEM OF PH-6
PROJECT

FINAL CLOSING AUTHORIZATION


( For Static Equipment )

FORM NO:

Item No.

:..

Equipment Name

:..

Location

:..

Client

:..

STC-011

The above equipment has been erected in accordance with the


applicable drawing , specification and manufacturer's standards, and
is hereby certfied to be mechanically acceptable.
Vessel has been inspected for cleanlines and free of all debris.
Authorization is hereby granted to effect final closing or sealing of this
equipment.

Prepared by :

Inspected by :

(__________________)
(_________________)
HAP
SUAR ALAM ENGINEERING
Date :..
Date :

Witnessed/Reviewed by:

(____________________)
ASC
Date :.