You are on page 1of 3
‘SLHARBOR BULK TERMINAL CORPORATION VIP Bulging, Roxas Boulevard comer Senora de Guia Ermita, Manila, Philppines PURCHASE REQUISITION FORM ross Lot 10-11, Block 4, Mania Harn Contre, Tone, Mania.) © conrrouno. fi PRNO: LEU pare: #PML 1G , 2016 [Depariment/ Vessel SIMBIC - TAGOLOAN Date Needed: in-charge: ne DelverTo: SUBIC - TAGOLOAN ayy. Remarks CONSTRUCTION oF PER MENA pence (see attached Supe ) — Goh Recommended by mai 3 ny = tha ee Precessea By Noted by (SLHBTC) cara Pesuang Wer Prone “power ser ron roar om Sie. Mata PROJECT —:_—=— TAGOLOAN TERMINAL LOCATION: —_—_‘Tagoloan, Misamis Oriental ‘SCOPE + PERIMETER FENCE Perimeter Fence and Entrance / Exit Gates Prepai eee | Anerbuetby: Kennan tik dra Danis c. Bukédo Design of perimeter fence ‘= Front and Right Side : 440 meters long, 6” CHB zocalo 3 layers below the ground and 3 layers ‘above the ground, 2 meters high cyclone wire with 3 layers of barbed wire on top # Left Side : 2.5 mhigh GI Pipe (2°dia,) spaced every 3 meters and bolted on top of seawall {use baseplate and chemical bolt), 2 meters high cyclone wire with 3 layers of barbed wire con top ‘+ Back : 60 meters long, 6” CHB fence 3 layers below the ground and 2 meters above the ground ‘+ Ferrochrome Side : 125 meters long, 2.50m high concrete post spaced every 2.Smeters, 2meters eyelone wite with 3 layers of barbed wire on top Design of entrance / exit gates Entrance Gate : 12 meters wide # Pedestrian Gate :1.5 meters wide Exit Gate 1:10 meters wide = Residence Gate : 4 meters wide + Exit Gate 2:6 meters wide ‘supply of labor, tools, materials and consumables for the construction of perimeter fence and entrance / exit gates, Survey works (establish layout and elevation) Earthworks ( excavation and backfil) Painting works (one coat primer and one coat QDE paint) Commissioning Projet Site Sipervsor SLHBT Manager et BFO BFO BFO % D-41.5 D-41.5 D-45.8 , TAGOLOAN TERMINAL LAYOUT

You might also like