PERIODIC MAINTENANCE OF APPROXIMATELY 340KM OF THE GREAT NORTH ROAD (T2) FROM LUKULU BRIDGE TO

CHINSALI IN NORTHERN PROVINCE

CONCRETE MIX DESIGN

DATE
STRUCTURAL ELEMENT:
WEATHER
OPERATOR(S):
CUBE No

MAS
S

SPECSLUMP:

VOLUM
E

DATE OF CAST:
HUMIDITY:

DENSI
TY

DATE
GRUSH
ED

7 DAYS
STRENG
TH
(mpa)

SPEC STRENGTH(mpa):

28 DAYS
STRENG
TH
(mpa)

AVERA
GE

REMAR
KS

TEST COMPACTION METHOD:

CLASS:
C:WATER
RATIO:
WATER:
STONE:
C/SAND:
CEMENT:
SLUMP:
CONSULTANT SINGNATURE
CONTRACTOR SINGNATURE

READI
NG
(K/N)

DATE
DATE