Keeiatan
Pekeri
Lokasi
‘Tahun
Pembaney
ANALISA HARGA SATUAN RENCANA ANG
nan Gedung Hotel Dewi Wonosobo
Perencanaan Struktur Gedung Hotel Dewi Wonosobo
2016
koet.
+ Jalan Jenderal Ahmad Yani 90 Wonosobo
Uraian Pekerjaan Harga Satuan
Upth Pekerja
Harga Bahan
Suatah
oe T | mt [Pembersihan Lahap
682 frenage
ot | on JPekeria Rp 65,000] Rp 6.500
005 | On |Mandor Rp 85,000] Rp
Bp 10.750) Rp 10750)
2 | «2 T | am |Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
624 Baha
Bre fkavu Dolken diam Rp 24000, Rp 30,000
Ke JPoraind semen [Rp 1.300 Rp 3250
Lbe [Sene Gelombane 3] Rp 75,000 Rp 90,000
m3 fkayus74m — | Rp 1,250,000 Rp 90,008
Jpakw piasa2”-s° | Rp 17,000 Rp 1020
622 frenage
02] on frukang kayw — | Rp 85,000] Rp 17,000
oa] on Jpokeria Rp Rp 26,000
002} On JkepaisTukang ] Rp 95,000] Rp 1,900
0.02} On |Mandor Rp 85000] Rp 1,700
Bp 16.500 | Rp 214.270 | Rp 260.870
3 T |Pengukuran dan Pemasangan Bouwplank
bakan
0.012] ms |kayu si7x4mKayul Rp 5,900,000 Rp 70,808
02} Ke JPaku Biasa2"-s° | Rp 17,000 Rp 340
642 frenaga
or] on frukangkayu — | Rp 85,000] Rp 8,500
001} oF Jkepaia Tukang | Rp Rp 950
0.005} on |Mandor Rp 85,000] Rp 425
Ro 9.875 |Rp 71,140] Rp 81,015
7 ‘a2 [Pembuatan Gudan
bakan
La] Big [Kavu Dolken diamd Rp 24000, Rp 40,800
021] ms fkayu Rp 2,000,000 Rp 420,000
03) Ke JPaku Biasa2"-s" | Rp 17,000 Rp 5100
103] Ke Jportand Semen | Rp 1,300 Rp 13.650,
0.03] m3 Pasir Beton Rp 425,000, Rp 12.750
0.03] m3 [Koral Beton Rp 260,000 Rp 13.000
15] Lbr [Sene Gelombane B Rp $5,000, Rp 82508)
662 Tenaga
2] on frokang Kay — | Rp 85.000] Rp 170,000
1] ont Jpokeria Rp 65,000] Rp 65,000
02) OH |Kepala Tukang | Rp Rp 19,000
0.03] OH [Mandor Rp 85000] Rp 425
Rp 258250 [Rp 587.800 }Rp 846,050PEKERJAAN TANAH
[Gatian Tanah Pondasi
Rp 65,000
Rp 85,000
so.s7s
[Urugan Pasir Bawah Pondast
aban
PasicUrug Rp 250000 300,000
Rp 65,000 19,500
Rp 85,000 850
20350 300,000.
per 20 em)
Rp 65,000
Rp 85,000
[Pasang Pondasi Batu Kosong
lishan
pau Belah 15/20 | Rp 350,000 420,000
PasicUrug Rp 250,000 108,000
078 e Rp 65,000 50.300
039 . Rp 85,000 33150
0.039 ci 2 [Rp 95,000 3.705
0039 a Rp 85,000 33315
0370 28.000
Batu Kali 1Pe
Batu Betah 15°20 | Rp 380,000 420,000
Rp 1300 176,800
Rp 350,000 190.400
65,000 97.500
Rp 85,000 63.750
KepalaTukane [Rp 95,000 71128
IMandor Rp 85,000 6375
174.750 73720
65,000 32,500
000
Rp 160,000 192,000
Pekeria Rp 65,000
002s IMandor Rp 85,000TEKPRIAAN BETON
628 JPondasi Beton Berfulang (150 kg Besi +Bekisting)
628.1 [Bahan
HKavu Kias 1 (Tere] Rp 1,250,000 250.000
aku Biasa2"-s" [Rp 17,000 25,500
IMinyak Bekisting | Rp 10,000 4.000
JBesiBeton utr Rp 12,500 1,968,750
Kawat Beton — [Rp 14,500 S
Postland Rp 1300 436,800
Jpasie Beton Rp 425,000 9,500
kiki! Beton Rp 380,000 307,800
6282 lrenaga
JPekeria Rp 65,000
Tukang Batu | Rp——_—85,000
Tukang Kayu | Rp——_85,000
Tukang Besi Rp 85,000
Kepala Tukang | Rp 95,000
IMandor Rp 85,000
629 [Stoof Beton bertulang (162 kg Besi
629.1 [Bahan
Kavu Kias 11 (Tere 250,000 337,500
Paku Bisa 2 17,000 34,000
IMinyak Bekistin 10,000 6.000
esi Boton Polos, 9,500
Kawat 14,500
Portland Semes 1300 436.800
Jpasir Beton 425,000 229,500
kiki! Beton 380,000 307,800
6292 [Tenaga
Pekerja 65,000
Trukang Bate 85,000
Tukang Kayw 85,000
Tukang Besi 85,000
Kepala Tukang 95,000
[Mandor 85,000
630 ‘m3 |Kolom Beton Bertulang (300 kg Besj+ Bekisting)
6.301 [Bahan
04] m3 Jkavu Klas 11 Tere] Rp 1,250,000 Rp
4] Kg JPaku Biasa2”-s" |Rp 17,000 Rp
2] ur fMinyak Bekisting | Rp 10,000 Rp
316] Kg JBesiBetonulir [Rp 12,500 Rp
45] Ke |Kawat Beton [Rp 14500 Rp 65,250
336] Ke [PonlandSemen [Rp 1.300 Rp 436,800,
054] m3 JPasie Beton Rp 425,000 Rp 229,500
Osi] m3 |krikil Beton Rp 380,000 Rp 307,800
os] m3 fay Kias 11 Balok] Rp 5,900,000 Rp 885,000
35] Ur [Piywood 9mm — | Rp 125,000 Rp 437,500
20] Big kava Dotken diamd Rp 24,000 Rp 480,000,
6.302 [Tenaga
7.05] OH |Pekeria Rp 65,000] Rp 458250
0275] OH frukangBaw — | Rp ——85,.000[ Rp 23,375
165] OH frukang Kyu — | Rp 85,000] Rp 140.250
21] O# [Tukang Besi Rp 85,000] Rp 178,500
0403] OH fkepalaTukang Rp 95,000] Rp 38,288
0353] OH fMandor Rp 85,000] Rp 30,005
Rp 665 |p 7.370.850 [Rp 8248515634 [Fangga Beton Bertulang (360 kg Besi + Bekisting)
634.1 Bah:
023] m3 fkavu Klas IN (Tere] Rp 1,250,000 Rp 312,500
3] Kg Jeaku Bisa 2"-s" [Rp 17,000 Rp 51,000
12] Lr [Minyak Bekisting | Rp 10,000 Rp 12,000
210] Kg JBesiBeton Polos |Rp 9,500 Rp 1,995,000
3] Kg [Kawat Beton Rp 14,500 Rp 43,500
330[ Kg Portland Semen [Rp 1,300 Rp 429,000
054] m3 Jpasie Beton Rp 425,000 Rp 229,500
ost] m3 fkrikt Beton Rp 380,000 Rp 307,800
0.105] m3. |Kayu Klas 1 Balok] Rp 5,900,000 Rp 619,500
25] Lor [Plywood 9mm — | Rp 125,000 Rp 312,500
11] Big fKayu Dotken diame| Rp 24,000 Rp 264,000
6342 [Tenaga
556] OH JPekeria Rp 65.000] Rp 361,400
0275] OH fTukang Batw Rp 85.000] Rp 23375
sof OH frukangKayy — Rp 85,000] Rp 132.600
1a] On frukang Besi Rp 85,000] Rp 119,000
0323] OH JKepala Tukang [Rp 95,000] Rp——_-30.685
0283] OH |Mandor Rp 85,000] Rp 24.055
Ro 6911s |p 4.576300 | Rp 5.267.415
631 Pat antai Beton Bertulang (400 kg + Bekisting)
6311 Bahan
032] m3 |kavu Klas 11 (Tere] Rp 1,250,000 Rp 400,000
32] Kg Jpaku Bisa 2"-s" [Rp 17,000 Rp 54400
Lo] Lr [Minyak Bekisting | Rp Rp 16,000
Kg JBesiBeton Polos | Rp Rp 4,845,000
Kg. Rawat Beton Rp Rp 43,500
Kg JPomtand Semen | Rp Rp 436,800
054] m3 JPasie Beton Rp Rp 229,500
ost] m3 fkriki Beton Rp Rp 307,800
0.4] m3 fKayu Klas 1 Balok] Rp Rp 826,000
28] Lr [Plywood 9mm — | Rp Rp 350,000
16] Big fKayu Dotken diame Rp 24,000 Rp 384,000
6312 [Tenaga
OH JPekeria Rp 65,000 | Rp
0275] OH [Tukang Batu Rp 85,000 | Rp
165] OH Jrukang Kays — | Rp 85,000 | Rp.
14] On frukang Besi Rp 85,000 | Rp
0333] OH [Kepala Tukang [Rp 95,000 | Rp
0318] OH |Mandor Rp 88,000 | Rp
Ro 2,993,000 |p 8.647.0406 | 632 ‘m3 [Balok Beton Bertujang Q85 kg Bes] + Bekisting)
6321 Babs
m3 [Kavu Klas 11(Tere] Rp 1.250.000 Rp 400,000
Ke [Paku Biasa2"-s" | Rp 17,000 Rp 54.400
Lir |Minyak Bekisting | Rp 10.000 Rp 16,000
210] Ke JBesiBeton ulir | Rp Rp
3} Kg_ |kawat Beton Rp Rp 43,500
336] Kg Portland Semen | Rp Rp 436,800
Osi] m3 fkriki Beton Rp 380,000 Rp 307,800
04] m3 fKayu Klas I Balok] Rp 5,900,000 Rp 826,000
28] Lor [Plywood 8mm — | Rp 125,000 Rp 350,000
Jol Bie_[kavu Dotken disme| Rp 24.000 Rp 384,000
6322 [Frenaga
635] OH Jpekeria Rp 65.00] Rp 412,750
0275] OH fTukang Batw Rp 88,000] Rp 23,375
165] OH frukang Kayy — Rp 85,000] Rp 140.250
14] OH frukang Besi Rp 85,00] Rp 119.000
0333] OH Kepala Tukang [Rp 95.000] Rp 31,635
0318] OH |Mandor Rp 85,000] Rp 27.030
Ro 754.010 ep 5.143.500 | Rp 6.197.540
636 1] m3 [Membuat Ring Balok Beton Bertulang (15 x25) em
6236.1 Bahan
0.003] m3 fkavu Klas INCTere] Rp 1.250.000 Rp 3.750
002) Ke Paku Biasa2"-s" | Rp 17,000 Rp 340
36] Lar [BesiBeton Polos | Rp 0 Rp 34200
0.05] Ke |Kawat Beton Rp 14,500 Rp ns
55] Ke JPortand Semen | Rp 300 Rp 7.150
0.009) m3 }Pasir Beton Rp 425,000 Rp 3,825
0015] m3 [Kerik Beton Rp 380,000 Rp 5,700
6362 [Tenaga
0297] on JPekeria Rp 65.000] Rp 19,308
0.033] OH [Tukang batu Rp 88.000] Rp 2.805
0.033] On frukang Kayw | Rp 88.000] Rp 2.805
0.033] OH [Tukang Besi Rp 85.000] Rp 2,805
Ooi] OH fKepala Tukang | Rp 95,000 | Rp 950
0.015] OH |Mandor Rp 85,000 | Rp Lars
Ro 20045 bp 55.000 Lap 85.63REKAPITULASI AKHIR
Kegiatan : Pembangunan Gedung Hotel Dewi Wonosobo
Pekerjaan : Perencanaan Struktur Gedung Hotel Dewi Wonosobo
Lokasi = Jalan Jenderal Ahmad Yani 90 Wonosobo
Tahun: 2016
Lo | URAIAN PEKERJAAN HARGA SATUAN
PEKERJAAN PERSIAPAN 104,864,933.00
PEKERIAAN TANAH 61,689,170.00
PEKERIAAN BETON 1,849,675,128.93
PEKERJAAN STRUKTUR AJ] 167,721,184.92
PEKERIAAN LAIN-LAIN 4,000,000.00,
Jumlah (A) 2,187,950,416.85
Jasa Pemborong 10% (A) 218,795,041.69,
TOTAL(B)
PPN 10% (B)
TOTAL 3
Dibulatkan, 2,647.420,004.00
[Dua Milyar Enam Ratus Empat Pulub Tujuh Juta Empat Ratus Dua Puluh Ribu
Semarang, Mei 2016
Dibuat oleh