You are on page 1of 7
PRODUCTION PLANNING & CONTROL, 1997, VOL. 8, NO. 4, 406~412. Implementation of just-in-time in a small company: a case study A. GUNASEKARAN and J. LYU Keywords JIT implementation, SMEs, case study, future research Abstract. This paper deals with the implementation of JIT in a small company in Taiwan that produces different kinds of automobile lamps such as rear combination lamps and front turn signal lamps. JIT systems have tremendous effects on all ‘operations of a firm, including design, accounting, finance, marketing, distribution, ete, amd thus are of interest to all levels of a firm's management. Realizing the success of JIT, large-scale manufacturing companies all over the world have implemented JIT in their production systems with the objec- tive of improving their competitiveness. Nevertheless, small and medium enterprises (SMEs) play a major role in the national economy. Hovever, JIT has not recived serious attention from SMEs. Realising the importance of improving. the performance of SMEs, a case study is presented to ‘motivate practitioners to implement JIT in their SMEs, In addition, furure research directions in the areas of imple- ‘menting JIT in SMEs are presented. ‘Authors: A. Gunasekaran, Department of Manufacturing and Engineering Systems, Brunel University, Uxbridge, Middlesex UB8 SPH, United Kingdom: J. Lyu, Department of Industrial Management Science, National Cheng Kung University, Tainan, Taiwan, R.O.C. ony ‘A. CUNASEKARAN isa senior lecturer of production operations management ‘ment of Manufacturing & Engineering Systems at Brunel University, UK. He was awarded a PhD. in industrial engineering and operations research from Indian Institute of Technology, Bombay (india). Dr Gunasekaran has been a research fellow in the faculty of management at the University of Toronto, a postdoctoral fellow at Laval University and Concordia University (Canada), and an assistant professor at the University of Madras (India) and University of Vaasa (Finland). He has published over 50 articles in journals such as Intemational Journal of Production Research, Intemational Journal of Stems Science, Intemational Journal Operations and Production Management, Production Planning & Control, Computers in Industral Engineering: An International fournal, European Journal of Operational Research, Journal of Operational Research Society, International Journal of Production Economic. Computers in. Industry: in the Depart ‘An Incerational Journal, International Journal of Quality & Reliability Management, and Intemational Journal of Compuler- Integrated Manufacturing He has presented over 30 papers in conferences and given a number of invited talks in Finland, Sweden, Denmark, UK, India, Brazil, Austria, Canada, Japan, Thailand, Singapore, US, France, Australia, New Zealand and Taiwan. He is on the editorial board of a ‘number of journals which includes the Intemational journal of Stems Science, International fournal of Quality & Reliability Management, and International Journal of Production Planning and Control He Ihas edited special istues for a number of international journals. His research interests include ‘manufacturing strategy, computer‘integrated manufacturing, agile manufacturing and business process reengineering. Kung Universi J. LW is an associate professor in the Department of Industrial Management Science at National Cheng Kung University, Taiwan. His qualifications include a bachelor’s degree in engineering science and amaster’s degree in industrial management, both from National Cheng ,, and a PhD degree in industrial and management engincering from the University of Iowa, USA. He has participated in many projects supported by the National Science Council, China Shipbuilding Co., Taivan Power Co., and private companies. He has also published several papers in international journals and written a book entitled Management Information Syste. is research interests arc in the areas of global quality management, business internet applications, and intelligent production planning and control systems. 01587287/07 $1200, © 1007 afore Francis Lt Implementation of IT in a small company 407 1. Introduction Justindime (JI) stimulates new directions of planning and performing activities in manufacturing stems: its effects are significant in improving the overall performance of the whole organization. Conceptually, JIT is an approach that combines apparently conflicting objec- tives of low cost, high quality, manufacturing flexibility and delivery dependability. In short, JIT isa system that produces the required item at the time and in the ‘quantities needed. ‘Since the excellent work by Schonberger (1982) on Japanese manufacturing techniques and Monden (1983) on the Toyota production system, tremendous progress has been made on the methods and techniques, related to the applications of the JIT philosophy. A ‘number of articles have been published on the practice, JIT, however, most of them deal with largescale indus- twies. However, SMEs play a significant role ina national economy. Therefore, there is a need to help these companies to improve their competitiveness and hence to improve the national economy. Realizing the importance of SMEs and their performance, various productivity and quality improvement programmes have been implemented in the past. However, JIT has not received much attention from SMEs who fear that JIT requires new investments of capital in labour, materials, and equipments to implement JIT. However, experience shows that JIT requires change in the management of various production operations, but not necessarily investment of capital resources such as, automation, new equipment and workforce. In order to ‘motivate other SMEs, a case study conducted in a small company in Taiwan is presented. Some of the observa- tions from the case study may be useful to practitioners, for motivating their efforts in implementing JIT in SMEs. ‘The organization of this paper isas follows: Section 2 deals with the background to the research. The details, of the case study conducted at a small company in ‘Taiwan are presented in Section 3. Future research directions in the areas of implementing JIT in SMEs are discussed in Section 4. Seetion 5 concludes the paper. 2. Background to the research ‘There is no standard to implement JIT other than continuous progress towards the ultimate objective of delivery as wanted, with a smoothly synchronized con- tinuous flow (purchasing and production) keyed to final ‘demand, with perfect quality of incoming materials, goods- inprocess, and finished products, JIT is a concept that, for the most part, is not culturally based. The most notable aspect of the suggestions is that itis clearly possible to implement JIT in an automated facility that utilizes a relatively small amount of direct labour in its processing operation. Gupta (1987) conducted a feasibility study of ‘JIFpurchasing system implementation in a manufactur- ing facility. This helps the JIT implementation process considering the flexible production systems. Richmond and Blackstone (1988) reviewed the applicability of JIT concepts in the plastics industry, focusing on three aspect areas: quality management; technological requirements; and raw material purchasing practices. Crawford et al. (1988) presented JIT implementation and operating problems through a survey of industries in US. Because of the limited amount of research that hhas been conducted in the area of JIT operations, they were not able to provide closed-ended questions about implementation and operating problems. Nevertheless, JIT manufacturing demands better forecasting, much tighter control of workin-process and near perfect quality. Barker (1998) presented a case study and results are an implementation in a JIT environment in the elec- trical switchgear industry. The competitive pressures being placed on Western manufacturing organizations require new restructuring models, which take account of value-adding capability investment. Time-based man- uofacturing strategies offer a framework to develop the total input/output chain in solution of selling price. This method can be used successfully in bate ‘manufacturing companies to reduce the throughput time and conversion cost ~ the method is non-capital- intensive and involves the total company and people’s ‘commitment, Clarke and Mia (1993) investigated the adoption of JIT manufacturing and the design of appropriate ‘accounting information systems. Several factors that appear to be important in the successful tion of IT management systems in Australia include the lose geographic proximity of suppliers and customers, the existence of a highly competitive market, a broad product range, small to medium firm size, the existence of flexible manufacturing technology, large inventory holdings as a part of total assets, the use of JIT by dominant industry members, and a low degree of ver- tical integration in the firm, Industry type is also an important factor. The ideal goal of a JIT system is to have the entire production-ofbusiness cycle operate without interrup- tion and without non-valueadded time costs. JIT is much more than just another system of methods of improvement. It is a philosophy that can apply to any company, regardless of whether the company is a manufacturer, distributor, or virtually any types of 408 A. Gunaseharan and J. Lyw business, including a service enterprise. One secret to a successful JIT operation is in ensuring that everyoni involved. jIT should be viewed broadly as a procedure for helping companies to manage and reduce total processing times. There are five steps or phases involved in the implementation of JIT into a company’s oper tions: (3) cleaning up the operations; (ji) effecting a company-wide culture change; (iii) preparing logistics for JIT; (iv) implementing the programme; and (¥) reviewing and monitoring the stem after implementation (Tucker and Davies 1993). ‘The major benefits of implementing JIT manufac- turing to the small manufacturing firm include smaller inventories, improved quality, and shorter lead times. Directly related are potential improvements in both future competitiveness and current cash flow. Once the decision to adopt IT is made (the optimal starting point is internal production factors’ especially layout revision) schedule stability and the development of relationships are a result of factory reform, not an implementation technique. The small firm literature agrees with this view. The implementation of the JIT philosophy assumes the willingness and ability ofa firm to address each relevant element (Brown and Inman 1993). According to Bondi (1994), the implementation of JIT practices may potentially bring to the surface such critical issues in employee relations as number of job classifications, width of job description, and the employee training and development. A broad range of firms that have implemented JIT was examined 10 identify managerial perceptions of how JIT implemen- tation had affected human resource management. A sound strategy for implementation includes a commit. ment on behalf of the organization to the education and involvement of al levels of employees. The training and development, both technical and behavioural, of man- agers and production workers are critical to the success of a JIT programme. Most of the cooperation and commitment are through training and development programmes. “Materials constitute much of the cost of construction. Akintoye (1995) presented a survey of JIT production systems and application and implementation issues for the control of material inventory in building construc- tion, Implementation of JIT building material manage- nent in construction has the potential to realize the same far-reaching benefits experienced in manufactur- ing. The key elements for successful implementation of JIT strategies have been addressed, with particular emphasis on the importance of top management commitment and employee involvement in this process (Bandyopadhyay and Jayaram 1995), ‘The majority of the articles on implementation of JIT in manufacturing are conceptual and related to largescale industries. Hence there is a need to identify the critical variables associated with each basic JIT philosophy in SMEs. These studies typically used a small sample size, are industry specific or collected data from the effectiveness of the JIT implementation, However, there is a need to investigate the major factors involved in the implementation of JIT in SMEs. Also, there are not many reports that deal with the imple- mentation of JIT in SMEs. To provide insights into the implementation and benefits of JIT in SMEs, a case study conducted in a small company in Taiwan is presented in the following section. 3. Acase study The company (Daioku Company) considered for case study is located in Tainan, Taiwan. The major products of the company include different kinds of automobile lamps. Since the world market of lamps is ‘moving towards high variety and low quantity, and both the life cycle of the lamps and the lead time available from customers’ orders to the delivery of lamps are getting shorter, top managers of Daioku Co. have been under great pressure to improve the overall competitive position of the firm by improving quality and produc- tivity. In 1990, the executive manager at Daioku started promoting JIT system, with the hope that the inventory level can be reduced and productivity can be improved. This will help Daioku to become more competitive in offering internationally acceptable quality lamps at competitive prices. 3.1, The process of implementation One of the major objectives in implementing a JIT system is to achieve a common goal of the whole company. The main thing to start with in implementing JIT in any company is to improve the level of education and training, and to encourage suitable incentive ‘schemes and promotions. In Daioku Co. three middle~ level managers were selected to participate in a Total Productivity System seminar organized by K-Company. With this background, the managers taught the whole ‘company what they have learnt from K-Company. A committee consisting of the manager of each depart ‘ment was also established to plan and implement the JIT. system so that they could discuss and learn from what ‘vas going on and could plan for the funure programme. ‘The basis of JIT is 5S: (i) Sein: classify materials on the shop floor based on its usefulness; (ii) Secton: place the valueadded materials in handy positions, (il) Seize Implementation of JIT in a small company 409 lean up the non-value-added materials; (iv) Seiketsu: maintain the factory in good looking shape; and (v) Shitsuke: let the employees have good habits and follow the rules. Thus is the most important task to start with although it has been ignored by most academic researchers. With 5S activities, the working environ- ‘ment in Daioku was cleaned up to improve the safety, quality and productivity. Since beginning to implement the JIT system, Daioku continuously improved the qual- ity of education and training, and activities based on 5S. activities. In 1991, a ‘red card war’ was proposed. The managers of each department form an improvement committee to look after the implementation of JIT in ifferent areas of the company, especially the shop floor. All unnecessary materials are posted with ‘red card” and deposited for further rework. Thus, all materials have been identified in terms of their names, places, quantities, ete. The concept of visual management, that, is management simply by eye sight has been strongly motivated and encouraged. Activities related to 5S have become routine to everyone in the company in Daioku. With this, the Daioku company has laid down a solid foundation for the JIT system so that the production system can be operated smoothly to improve safety, quality and productivity over the years. ‘The emphasis on TQM activities has also played an important role in implementing the JIT system. With quality cost control activities, teamwork spirit and tech- niques to learn quality control are highlighted. The encouragement of employee suggestion schemes has also been established to help people on the shop floor to solve their problems by themselves and giving them the motivation to continuously improve their working environments. Other activities related to the JIT system included are as follows. Standardization Men, machines and materials are integrated efficiently using standardization of various processes and material flow path so that the results of the implementation of JIT and maintenance of any improvement project can be realized without wasting any resources in the whole process. otal preventative maintenance activites From the cleaning up of the simplest equipments, every warker learns to inspect, lumping and other related activities so that equipments on the shop floor can totally be under a self'maintained situation. The breakdown rate of equipments has therefore been greatly reduced and they are made available all the time. This i certainly helpful to implement an effective HFsystem, Since July 1990, the top managers of Daioku have started implementing the Kanban production system — moving from the traditional push-type production ‘management to pulltype production management. Tis much more complicated than they expected and some of the major problems include: () Combining the information and material flows instead of separating them. (ii) Post the products, its store and manufacturing process instead ofa flow without any post. (ii) Changing the Lshape assembly line into Ushape assembly line. A number of new techniques and new equipments, although not necessarily the newest are required tobe developed or purchased. (iv) All other departments, such as R&D and trans- portation are required to participate in the JIT project. Every department has been instructed to investigate how to make the shop floor oper- ate in a simpler and more efficient way. Since beginning the implementation of JIT, many diff culties have occurred. For example, although suppliers (subcontractors) have been trying to co-operate with, Daioku, there exist many problems in practice. For example, every supplier is required to collect the ‘Kanban’ back from the orderpost and ship their materials based on the information in the Kanban, ‘This is certainly different from the traditional ways of shipping materials based on the pre-determined plan, In 1992, numerous discussions and meetings took place. Also, Daioku sent experts in helping suppliers to solve their problems gradually. The inventory of parts in Daioku was therefore reduced dramatically in this year. 3.2, The implementation methodology adopted at the Daioku plant Since 1990, intensive education, training and pro- ‘motions have been organized to lay the foundation for JIT implementation. This training was further extended \o every small plant within the company in 1991, The JIT implementation committee selected assembly ‘works in rear lamps plant to start with. The have (i) used standardization to eliminate overproduction and Waiting time of materials; (ii) provided a rational level of, parts to eliminate unnecessary spare parts and allow the packaging and moving of materials smoothly; i) implemented a single-person and multi-machine scheme on some cells and reviewed the fast-change- 10 A. Gunasekaran and J. Ly moulding activities together with some training. A small batch production procedure has been implemented and the efficiency of the plant is much improved. (Other plants therefore followed the footsteps of the rear lamps plant to implement the JIT system. The ‘committee also extended the scope of the JIT system from each cell to each bulfer and store so that every area has been carefully planned and the location of every part of productis clearly identified. The 5S activities that were introduced in the previous year have come to be very useful in this stage. In the long run, each cell is, operated as a small module of a large system and the whole JIT system is therefore accomplished. To prevent the production of unnecessary products (including parts, products and documents), many ‘idle facilities’ are created. Every check point in the company is created with this kind of facility so that workers would not carry out unnecessary tasks accidental. ‘The current layout ofthe plant in Daioku company is shown in Figure 1. The production system is established as an endless loop ~ from the transfer of Kanban of suppliers, product manufacturing Kanban, part manu- facturing Kanban, and part purchasing Kanban. The system is working smoothly and synchronized very well ‘The idea of a JIT production system is that it produces the necessary items of products at the necessary time with necessary quantities—this has finally been achieved in Daioku Gompany. 3.8 Discussion on the results of the implementation ‘Tremendous resistance from suppliers and workers was faced during the early stage of developing the JIT. system. High level commitments of top manager, deter- mination of pushing JIT system and suppliers’ involve ment have helped to achieve JIT material flow. A major success in the implementation of the JIT system is the reduction in the amount of inventory and workers. The workin-process inventory level has reduced from a market value of 30 million NT to 5 million NT, parts inventory has reduced from 130 million NT to 60 million NT, and the number of workers has reduced from 580 to 520 during the past three years — where the growth rate of the company is 5-10% per year. Besides the physical outeomes from operating a JIT system, a major advantage is allowing every worker to have improvement motivation and ability. From this, quality and productivity problems “under the water’ have shown up and are solved. This kind of cycle can strengthen the organization and spirit of the Daioku Company so that it can be more competitive in the long 4. Future research directions on the implementation issues of JIT in SMEs \wure research directions to ple- The following are some ‘motivate the researchers and practitioners in th mentation issues of JIT in SMEs. (i) A systematic methodology to evaluate the per formance of the JIT implementation process over time would certainly add the advantage of knowing if there is any bottle-neck in the imple- mentation process of JIT in SMEs. There is an obvious need to measure the level of JIT success with reduction in inventory cost, and productiv- ity and quality improvements. (ii) A systemic framework should be provided for determining the level and type of training required for implementing JIT in SMEs. Also, suitable incentive schemes should be estab- lished to promote teamwork for an effective implementation of JIT in SMEs. ‘The factors critical to the successful supplier customer relationship development should be identified in SMEs. 5. Concluding remarks In this paper, a case study is presented with the objective of discussing the implementation issues of JIT in SMEs. In addition, an overview of the JIT imple- ‘mentation issues and future research directions con- cerning SMEs are presented. Continuous improvement is a key goal for a healthy company. JIT is a holistic approach that needs the involvement of all people in the company. Improvement activities are required to be carried out to survive in a highly competitive interna- tional market. Emphasis should be placed on reduc- tions in throughput time and elimination of unessential activities and simplification of essential activities while implementing a JIT system. Most of the companies in Taiwan are currently facing the impact of entering GATT and other international competition and so they are under great pressure to improve their competi- tiveness. Daioku proves that with the JIT system and other improvement projects, the company can survive with lower manufacturing costs and higher quality. Multimedia can be used in educating the workers about JIT concepts and their implementation issues. The following are the lessons learned from the ease study: (The implementation of JIT in SMEs should start with layout revision, schedule stability, and the development of long-term supplier-customer relationships, an Implementation of JIT in a small. company ‘nyoreC. Noy LoRINposd uequUEY “T AmB SS mae |S gene | sumoesnueyy sri8d | 7 Soca) RE TS enna] wonwor z — ‘SUB BAO T er) (= 412 A Gunasckaran and J. Lyu (i) A new purchasing philosophy supporting fre- ‘quent purchases of small lot sizes may help SMEs in implementing a JIT system, (ii) Education and taining of workers in SMEs about JIT concepts and their high leverage opportunities would tremendously support the implementation of JIT in SMEs. In order to implement JIT in SMEs, workers must be cross- trained, highly skilled and very disciplined. (iv) Identifying the value-added and nonvalue- added items in shop floor activities are important. to implement JIT in SMEs, (v) Top management commitment is necessary to ensure the effectiveness and success of imple- menting JIT in SMEs, Acknowledgements ‘The authors would like to thank Mr Charles C. Lin, the President of Daioku and Mr ¥. Chang, Production, Manager at Daioku for their co-operation research project References AwINTOWE, A., 1995, Justin-ime application and implementa- tion for building material management, Construction Man: ‘agement & Economics, 18, 105-113. Baxovorapiny,J.K.,and JAVARAM, M.., 1995, Implementing jjustin-time production and procurement strategies. [ner ‘national journal of Management, 12, 83-90. ‘BARKER, B, 1998, Valueadding performance measurement: time-based approach. Inernational Journal of Operations & Production Management, 13, 38-10. BONDI, P.J}, 1904, How do JIT systems affect human resource ‘management? Production & Inventory Management journal, 35(1), 14 BROWN, K. Land INMAN, R.A. 1998, Small business andJIT:A, managerial overview. International Journal of Operations @ Production Management, 18(3), 57-66. (CLARKE, B., and Mia, L., 1998, JIT manufacturing systems: use ‘and application in Australia. International Journal of Opera tions € Production Management, 13(7), 69-82. CaaWFORD, Ko M,, BLACKSTONE, J. Hl, J, and ©OX, J 1988, 4’ study” of JIT implementation and operating problems. Iuersational Journal of Production Research, 26, 1551-1568. GuPta, YP, 1987, A feasibility study of JMTpurchasing ‘system's implementation in a manufacturing. facility, Tniemational Journal of Operations and Production Management, 10, 3141 MONDEN, Y, 1988, Tipota Production Siem (Institute of Industral Engineers, Adanta, GA.) RicuMoND, LE. and BLACKSTONE, J. H., Jr, 1988, Justin-ime im the piastics processing industry, Intemational Journal of Production Research, 26, 27-34 SCHONBERGER, R. G., 1982, Some observations on the advantages “and implementation issues of justin-time production ems. ura of Options Managemen, 8, Tucker, M. W., and Davis, D. A., 1993, Key ingredients for suecessful implementation of justin-ime: A system for all business sizes, Business Horizons 36(3), 59-65,

You might also like