Professional Documents
Culture Documents
AuroraForte
A powerful tool for testing the Physical,
ATM and IP layer operation of ATM
byte UNI Format NNI Format circuits. Provides IMA, E1, E3, DS1, DS3,
ATM25, STM1/OC3 and STM4/OC12
1 GFC VPI VPI interfaces for unparalleled multi-circuit
testing ATM, xDSL and 3G networks.
2 VPI VPI Physical and ATM BER testing is provided.
3 VCI VCI Advanced features, AAL5, OAM, QoS,
SVC support and IP Ping over ATM,
4 PTI CLP PTI CLP protocol decoding and remote testing,
analysis of IP traffic composition.
5 HEC HEC
6 VictoriaSDH/ATM/IP
This family of testers combines full SDH/
· SONET features up to 2.5 Gbit/s and ATM
Payload Payload capabilities up to 155Mbit/s. Transmission
·
functions include TCM, APS, M/N alarms
· G.783 sequences, frequency deviation
and nx64 and Nx56kbit/s tests at E1 and
53 DS1 levels. ATM features include
generation and analysis of ATM
flows,QoS, OAM flows, generating and
Figure 1 ATM Cell format analysing AAL1, AAL2, AAL5, and also
provides analysis of IP traffic composition.
B d
d B
B Out Out d
In In e
C e
d C Out Out C f
f
In In g
a H D g
b H Out Out
c E h
h
VPI/VCI=A/a VP
Switch In VPI/VCI Out VPI/VCI
2 D/b 3 E/c
B/b
CI =
TE V PI/V
VC VPI/VCI=C/b TE
Switch
VC
Switch
In VPI/VCI Out VPI/VCI
/b
1 A/a 2 B/b
I=D
I/ VC VPI/VCI=E/c
VP
VP
Switch
In VPI/VCI Out VPI/VCI
2 C/- 3 D/-
TE TE
TE Terminal equipment
Management Management
Plane Plane
User User
Plane Plane Control
Management Plane
Control Plane Plane
Plane
Control Control
Plane Plane
User
Plane User
Higher Signaling
Signaling Plane Signaling
Higher Signaling
Layers (Q.2931) Layers (Q.2931)
AAL SAAL SAAL SAAL AAL SAAL
Layer Layer Layer Layer Layer Layer
ATM Layer ATM Layer ATM Layer ATM Layer
Physical Layer Physical Layer Physical Layer Physical Layer
TE VC Switch VC Switch TE
AAL ATM Adaptation Layer SAAL Signal ATM Adaptation Layer???
Figure 6 Layers and planes implemented in terminal equipment (TE) and switches
ATM test ATM testing ATM installation ATM maintenance ATM pocket guide ATM reference ATM solutions
3G test, 3G testing, 3G installation, 3G maintenance, 3G commissioning, 3G Set up
Sources AAL Layer ATM Layer Physical Layer
Voice, Slots Payload Header Slots Fiber
AAL 1 Video + Coaxial
AAL 2 Low-rate
channels
+ ATM cells
STP
+
AAL 3/4 Data 53 bytes Frames UTP
+
Low Wireless
AAL 5 Overhead +
48-byte
48 5
STP Shielded Twisted Pair
Figure 7 ATM process for transmission UTP Unshielded Twisted Pair
Packets Continuous
User Data Stream
Upper Layers n bytes
AAL-SAP AAL-SAP
Convergence
sublayer
CS-PDU
48 bytes
AAL SAR-PDU
Segmentation
& reassembly
48 bytes
SAR-PDU
SAR-PDU
SAR-PDU
ATM-SAP ATM-SAP
STP
SLAATM-PDU ATM-PDU
53 bytes
ATM-PDU
ATM
ATM-PDU ATM-PDU
ATM-PDU ATM-PDU
53 bytes
PL-SAP
Physical Layer
AAL-SAP AAL-SAP
CS
SSCS
SSCS
CID = z CPCS
CID = y
CID = x
CPS CPS SAR
SAR
ATM-SAP ATM-SAP
Figure 9 a) Multiplexing many channels (CIDs) in one ATM connection (AAL2 only)
b) Multiplexing structure for AAL3/4 and AAL5
ATM test ATM testing ATM installation ATM maintenance ATM pocket guide ATM reference ATM solutions
3G test, 3G testing, 3G installation, 3G maintenance, 3G commissioning, 3G Set up
bytes 48 bytes
bits 1 3 3 1
48 Padding
53 Header Payload
Header Payload
CPS STF Header Payload
SLA
bytes 1 1 2 n bytes 1 1 2
CS-PDU: CPI BT BA user data P AL ET LEN
SAR-PDU:
2
head SDU
44
trail
2
AL Alignment COM Continuation of Message LEN Length SDU Service Data Unit
BA Buffer Allocation Size CPI Common Part Indicator LI Length Indicator SN Sequence Number
BOM Beginning of Message EOM End of Message MID Multiplex Identifier ST Segment Type
BT Burst Tolerance ET End Tag P Padding
header 5 48
SAR-PDU: PT payload PT payload ... PT payload
a0 a1 a2 a3 c1 c0 c2
ttx
t
c0 c1 c2
c0 c1 c2 c3 trx
End-to-end gener.
Segmented gener.
VP switch Processing
VCI=4
VP layer
VP layer VCI=3
VP layer
User Data
VCs
VCI=3
SLA
VCI=4 VCI=4
F4 flow VPI=X VPI=Z
PTI=100
TrendCommunications
PTI=101
Other VPs
VPI=X VPI=W VPI=Z
PTI=100
PTI=101
Figure 16 End-to-end and segmented F5 flows transmitted across the monitored VCC
ATM test ATM testing ATM installation ATM maintenance ATM pocket guide ATM reference ATM solutions
3G test, 3G testing, 3G installation, 3G maintenance, 3G commissioning, 3G Set up
End Device VP/VC Switch VP Switch VP/VC Switch End Device
VC-RDI
VC-AIS
VP-RDI
Event detection
VP-RDI VP-RDI
OAM generation
VP-AIS
Payload
Performance
MSCN TUC1 BIP16 TUC0 TST 6Ah TRC0 BLER TRC1
management
1 2 2 2 4 29 2 1 2
Payload
Payload
Header
Header Pseudo-Random
Pseudo-Random Bit Sequence
Bit Sequence
(PRBS)(PRBS)
Header
Header Fixed
Fixed word
worddefined
defined
by the
byuser
the user
bytes 5 48
DSLAM (xTU-C)
a A
xTU-R
b B
xDSL
A a
Network Local Loop B b
PHY
ATM
Termination c
C d
c ATM link
C
xTU-R d
xDSL
ATM ATM
SONET/SDH WLL
Air interface
Base Station
UTRAN GSM
Uu ISDN PSTN
UE
Uu nxE1
NodeB ATM STM-n QoS enabled
Uu
RNC MSC
MSC
MGW IP backbone
NodeB
nxE1 PRC
ATM VLR
VLR
2 Mbit/s
NodeB STM-1
Uu
TrendCommunications
TrendCommunications
Americas: +1 256 461 0790
Deutschland: 089 32 3009-0
España: 93 300 33 13
France: 01 69 35 54 70
India: 22 8597 463/4
More information in: UK: 01628 524977
Installation and Maintenance of SDH/SONET,
ATM, XDSL, and Synchronization Networks.
web: www.trendcomms.com
2003 (c) Artech House, ISBN:1580535259 mail: infoline@trendcomms.com