Design Rough Estimate Cost
Design Rough Estimate Cost
S# Name Package # Name of Date of IFB Closing Date Rough Estimated Cost (Rs) Date of Contract
of AWB Distributary/ Award
As per design report
Minors
23,872,285/-
N
4 Package#1 (A) Darello Distry 14-08-2010 27-09-2010 9287053/- 20 -11- 2010
A Mithrao
5 Kunri Distry (Revised 28-8-2010) Revised 19-10-2010 27,103,373/-
R
36,390,426/-
A
C
6 A Package#4(A) RD-196 L/S Minor 14-08-2010 27-09-2010 19,354,784/- 20 -11- 2010
N -Upper Nara
7 Canal RD- 205 R/S Minor (Revised 28-8-2010) Revised 19-10-2010 8,482,191/-
A
8 L Parhyaro Minor 7,735,797/-
A 35,572,772/-
W
B
9 Package#4-Upper RD-214 L/S Minor 14-08-2010 27-09-2010 9,237,587/- 20 -11- 2010
Nara Canal
10 RD-203 L/S Minor (Revised 28-8-2010) Revised 19-10-2010 10,278,218/-
31,532,811/-