You are on page 1of 3
HYUNDAI ENGINEERING CO.,LTD. A OWNER. : PETROVIETNAM POLYESTER AND FIBER JSC. Co. ‘Subcontractor Name: PVC-ME PROJECT DINHVU POLYESTER PLANT PROJECT "WELDING PROCEDURE SPECIFICATION (WPS) ‘Weld Code: AWS D 1.1 2004 WPS No.: PYC-WPS-001 Revisions — ‘Welding Process(es): SMAW- Type(s): Manual Procedure Qualification Record No.(s: PVC-POR- Date: 02 Feb. 2010 JOINTS Joint design: CPJ Single Vee Groove Backing: Yes: X No Backing, Material (Type): Weld Other aterial PROJ. NO. 2009035 QUALITY CONTROL FORM: QCF311 ‘Vols (Range) GAS ‘Shielding Gastes) BASE METALS ‘Material Specification $S400__ to SS400 or Equivalent GraieNo: 1_____ 10 Grade No ‘Thickness Range: For Groove 3mm + For Fillet Pipe Diameter Range: For Groove 600mm an FILLER METALS ENo, sees seteies ANo. 1 a SFANo. za sant AWS Class E7016. eee Elect Filler Dia 02.6,32,40 0m _ y lect Filler Trade Name lectrade-Fiux (Class) Flux Trade Name ‘Non-Consumable Elect ‘Kobelea LB-52 NA Non-Consumable Elect Dia NA Gas Backing ‘Trailing Shielding Gas Composition TECHNIQUE String or Weave Bead Orifice or Gas Cup Size Interpass Cleaning (Brushing, Grinding, etc) Brushing and Grinding Method of Back Gouging Oscillation (Contact Tube 10 Work Distance Muhtiple or Single Pass (per Side) Multiple or Single Electrodes ‘Travel Speed (Range) ‘3 times of electrode dia. NA i Multiple Pass Single See Table below POSITION Position of Groove Position of Fillet ‘Welding Progression: Other PREHEAT Preheat Temperature: 3 t020,0mm inch: min. 0°C, 20 10:38 Incl smin 10°C: 38 to 65 Inch: min 65°C Interpass Temperature: Max 200°C Z Preheat Maintenance: Gas Burner Method of Checking Tempilstic Other NAL JOINT SKETCH = Root pap :3 2d5mm = Root Face :2 4 0.5mm = An re: 60" 5° ‘Anele Groove —=a was |, lec Layers(s) AWS Class. Ts SMAW. ETOIG. ana | MAW Sidand oer | ~SMAW | E7016 Cap | SMaW_ | E7016 cae eve Chaska PVC ]Roprovel py HEC [Name A MTeon [Nanvo: £ E01 ~ signe: Yu inne ae: 02/02/2010 pac 021 OL [2410 [rue oer Aol o RECORD (WPQR) 1. ‘OWNER : PETROVIETNAM POLYESTER AND FIBER JSC. CO. PROJECT: DINK VU POLYESTER PLANT PROJECT WELDING PROCEDURE QUALIFICATION PROJ.NO : 2009035 QUALITY CONTROL FORM: acrs12 ‘Types (Manual, Automatic, Semi-automatic) ‘Marval Welding Procedure Specification No. "PVC=- WPS -00) -20S____ Welders Name DANG VAN SON. ____. Stamp No. 182247990 a Procedure Quaifeation TONTS Recoed (PQR) Ne. _ PYC-POR-OOI-2GCS Date _25 Jan 2010 7 Welding Process(es) SMAW. oe __ |+ Root gap :3 sasmm — |$— — |= Root Face : 2 0.5mm - nate Groove : 60" 5° “1 ‘BASE METALS FOSTWELD HEAT TREATMENT Material Specification _ $8400 Temperatwe CNA “Type or Gade Glw Gi Tm “NA Ge Ne NA wGrP No. Wa Otter NA Thickooss tm See wa ELECTRICAL CHARACTERISTICN Other NA eae i Current Polariny Deer FILLER METALS -Amperes (Range) See table below Voks (Range) Se table teow Fo - ANo. : GAS SFANe. sMAW. - ‘AWS Class Shielding Gases) Na [REVIEWED EleevFler Dia Percent Composition NA Ele Filer Trade Name (eats) Loyd lecwode Fux (Cass) : Flow Rate 4 sete aux Trade Name as Ga Backing ‘Non-Consmable Elst z rang Shielding ‘Now-Consumable Elect Dia Gas Composition ‘Weld metal deposit ~ TECHNIQUE POSITION Sing oe Weave Bead 2 Poston Groove 36 Orie or Gas Cp Sze Weld Froaession Interpass Clearing - (Uphil, Bows) Uphill (Grahng, Grncing, 2.) Otter NA PE Method of Back Gouging rcillation Contact Tube PREHEAT 10 Work Distance SNA Prebeat Temperature Amie Temperature Mati or Sige : Ierass Temperature Pas (pe Se) Mabie Ober Malipe o Single 7 PROJECT = DINH VU POLYESTER PLANT PROJECT WELDING PROCEDURE QUALIFICATION PROJ.NO 2009035 RECORD (WPOR) 22 QUALITY CONTROL FORM: Ubimate Unit ‘Specimen No, Widen) ral ~ Specification | 400Nimas? Min RS 001.3688-01 16 435.6 RS 001268802 18.8 roar 36.7 '$0-001-2688 01 |SB-001-2086-02 | 'SB-001-268S.03, 'SB-001-2G3S.04 SpecimenNo. | Notch Location | Noth | Test Tyne Temperature Values. NA ‘Salisfaciory Ey Uesatisfactory Metal NA Type and Character of Faire OTHER TesTs Yes )_No CO] Result Accept” BRReect "Ta satiny unsatisfactory ‘Typeof Test oO Report No PVC-PQR-VS.001 Ye RN (___Renert No_APAVEPQRIDOL Depot Anais oe Other eee NA a CERTIFICATE OF COMPLIANCE “Test Conducted by MSC. Hi Trong Cuong. Laboratory Tet No. BsT-LASOL ‘We cenfy th: the statements made inthis record are comet ad that preparation, welding an testing of the test welds conform to the requirements of the project specifiation pac $.4707/2010 aug ELORRENCNCr f, Wins ‘(Weil of record of tests are Wiastrative only ar may be modified wo conform to the type andl amnberof tests reared bythe Project specification) —_

You might also like