HYUNDAI
ENGINEERING CO.,LTD.
A
OWNER. : PETROVIETNAM POLYESTER AND FIBER JSC. Co.
‘Subcontractor Name: PVC-ME
PROJECT DINHVU POLYESTER PLANT PROJECT
"WELDING PROCEDURE SPECIFICATION (WPS)
‘Weld Code: AWS D 1.1 2004
WPS No.: PYC-WPS-001
Revisions —
‘Welding Process(es): SMAW-
Type(s): Manual
Procedure Qualification
Record No.(s: PVC-POR-
Date: 02 Feb. 2010
JOINTS
Joint design: CPJ Single Vee Groove
Backing: Yes: X No
Backing, Material (Type): Weld
Other
aterial
PROJ. NO. 2009035
QUALITY CONTROL FORM: QCF311
‘Vols (Range)
GAS
‘Shielding Gastes)
BASE METALS
‘Material Specification $S400__ to SS400 or Equivalent
GraieNo: 1_____ 10 Grade No
‘Thickness Range: For Groove 3mm
+ For Fillet
Pipe Diameter Range: For Groove 600mm an
FILLER METALS
ENo, sees seteies
ANo. 1 a
SFANo. za sant
AWS Class E7016. eee
Elect Filler Dia 02.6,32,40 0m _ y
lect Filler Trade Name
lectrade-Fiux (Class)
Flux Trade Name
‘Non-Consumable Elect
‘Kobelea LB-52
NA
Non-Consumable Elect Dia NA
Gas Backing
‘Trailing Shielding
Gas Composition
TECHNIQUE
String or Weave Bead
Orifice or Gas Cup Size
Interpass Cleaning
(Brushing, Grinding, etc) Brushing and Grinding
Method of Back Gouging
Oscillation
(Contact Tube
10 Work Distance
Muhtiple or Single
Pass (per Side)
Multiple or Single
Electrodes
‘Travel Speed (Range)
‘3 times of electrode dia.
NA i
Multiple Pass
Single
See Table below
POSITION
Position of Groove
Position of Fillet
‘Welding Progression:
Other
PREHEAT
Preheat Temperature: 3 t020,0mm inch: min. 0°C, 20 10:38 Incl
smin 10°C: 38 to 65 Inch: min 65°C
Interpass Temperature: Max 200°C Z
Preheat Maintenance: Gas Burner
Method of Checking Tempilstic
Other NAL
JOINT SKETCH
= Root pap :3 2d5mm
= Root Face :2 4 0.5mm
= An re: 60" 5°
‘Anele Groove —=a
was |, lec
Layers(s) AWS Class.
Ts SMAW. ETOIG.
ana | MAW
Sidand oer | ~SMAW | E7016
Cap | SMaW_ | E7016
cae eve Chaska PVC ]Roprovel py HEC
[Name A MTeon [Nanvo: £ E01 ~
signe: Yu inne
ae: 02/02/2010 pac 021 OL [2410 [rue oer Aol oRECORD (WPQR) 1.
‘OWNER : PETROVIETNAM POLYESTER AND FIBER JSC. CO.
PROJECT: DINK VU POLYESTER PLANT PROJECT
WELDING PROCEDURE QUALIFICATION PROJ.NO : 2009035
QUALITY CONTROL FORM: acrs12
‘Types (Manual, Automatic, Semi-automatic)
‘Marval
Welding Procedure Specification No.
"PVC=- WPS -00) -20S____
Welders Name DANG VAN SON. ____. Stamp No. 182247990 a
Procedure Quaifeation TONTS
Recoed (PQR) Ne. _ PYC-POR-OOI-2GCS Date _25 Jan 2010 7
Welding Process(es) SMAW. oe __ |+ Root gap :3 sasmm — |$— —
|= Root Face : 2 0.5mm
- nate Groove : 60" 5° “1
‘BASE METALS FOSTWELD HEAT TREATMENT
Material Specification _ $8400 Temperatwe CNA
“Type or Gade Glw Gi Tm “NA
Ge Ne NA wGrP No. Wa Otter NA
Thickooss tm
See wa ELECTRICAL CHARACTERISTICN
Other NA eae i
Current Polariny Deer
FILLER METALS -Amperes (Range) See table below
Voks (Range) Se table teow
Fo -
ANo. : GAS
SFANe. sMAW. -
‘AWS Class Shielding Gases) Na [REVIEWED
EleevFler Dia Percent Composition NA
Ele Filer Trade Name (eats) Loyd
lecwode Fux (Cass) : Flow Rate 4 sete
aux Trade Name as Ga Backing
‘Non-Consmable Elst z rang Shielding
‘Now-Consumable Elect Dia Gas Composition
‘Weld metal deposit ~
TECHNIQUE
POSITION
Sing oe Weave Bead 2
Poston Groove 36 Orie or Gas Cp Sze
Weld Froaession Interpass Clearing -
(Uphil, Bows) Uphill (Grahng, Grncing, 2.)
Otter NA PE Method of Back Gouging
rcillation
Contact Tube
PREHEAT 10 Work Distance SNA
Prebeat Temperature Amie Temperature Mati or Sige :
Ierass Temperature Pas (pe Se) Mabie
Ober Malipe o Single 7PROJECT = DINH VU POLYESTER PLANT PROJECT
WELDING PROCEDURE QUALIFICATION PROJ.NO 2009035
RECORD (WPOR) 22 QUALITY CONTROL FORM:
Ubimate Unit
‘Specimen No, Widen) ral
~ Specification | 400Nimas? Min
RS 001.3688-01 16 435.6
RS 001268802 18.8 roar 36.7
'$0-001-2688 01
|SB-001-2086-02 |
'SB-001-268S.03,
'SB-001-2G3S.04
SpecimenNo. | Notch Location | Noth | Test
Tyne Temperature Values.
NA
‘Salisfaciory
Ey Uesatisfactory Metal
NA
Type and Character of Faire
OTHER TesTs
Yes )_No CO] Result Accept” BRReect
"Ta satiny
unsatisfactory
‘Typeof Test oO Report No PVC-PQR-VS.001
Ye RN (___Renert No_APAVEPQRIDOL
Depot Anais oe
Other eee NA a
CERTIFICATE OF COMPLIANCE
“Test Conducted by MSC. Hi Trong Cuong. Laboratory Tet No. BsT-LASOL
‘We cenfy th: the statements made inthis record are comet ad that preparation, welding an testing of
the test welds conform to the requirements of the project specifiation
pac $.4707/2010 aug ELORRENCNCr f, Wins
‘(Weil of record of tests are Wiastrative only ar may be modified wo conform to the type andl amnberof tests reared bythe
Project specification) —_