Green PlC @ 100 PSF 185,700.0 PLC First Floor @ 4% of BSP 163,416.0 Open Car Parking 75,000.0 Power Backup 2KVA @ 25000 / KVA 50,000.0 Club Membership 50,000.0 EDC & IDC @ 150 psf 278,550.0 IFMS @ 50 psf 92,850.0 EEC & FFC @ 40 psf 74,280.0 Net Cost 5,055,196.0 Less : Discount from Desires 204,270.0 Less : Cash Down 9% of 95% 331,836.6 Discount Total 536,106.6 Net Cost after Discount 4,519,089.4