The document appears to be a log of distances traveled between different points labeled 1 through 28N. It includes the starting and ending km for each segment, the time of departure and arrival, and total time. The segments ranged in distance from around 50 km to over 100 km and took between 6 to 12 hours to complete.
The document appears to be a log of distances traveled between different points labeled 1 through 28N. It includes the starting and ending km for each segment, the time of departure and arrival, and total time. The segments ranged in distance from around 50 km to over 100 km and took between 6 to 12 hours to complete.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
The document appears to be a log of distances traveled between different points labeled 1 through 28N. It includes the starting and ending km for each segment, the time of departure and arrival, and total time. The segments ranged in distance from around 50 km to over 100 km and took between 6 to 12 hours to complete.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Predict The Value of Production Rate For The Given 'B' Values 2. Plot Q Vs T and N Vs Q For The Computed Values 3. Predict The Production Rate After 15 Years