PROJECT RISK DOCUMENTATION : STEP - 1 (for each of 10 risks min.
1. TITLE OF RISK: basic information and kind of risk, brief history
2. RISK IDENTIFICATION: positive / negative and …
a] CAUSE OR SOURCE: Physical, contractual & legal, construction-related, performance factor, economic factor, political, public factor or any other with detail information b] PROJECT STAGE: occurrence at what phase with influence Pre-execution, during execution, post execution Feasibility stage, design stage, construction stage, management stage c] PREDICTABILITY: foresight, predictable / non-predictable Precautionary measures planned / unplanned with details
3. ALLOCATION OF RISK: responsibility in benefit / profit or loss / damage
Developer / builder / owner, designer, executor / contractor, or external agents viz. govt. bodies, public factor, sub-contractors or other With brief account of allocation details (percentage allocation), disputes
4. IMPACT / EFFECT: influence on time, cost, quality, environment, safety
Quantification details of impact on each factor Information about change in plan of action
5. INTENSITY OF IMPACT / EFFECT: percentage share in profit / loss
ignorable, minor, moderate, considerable, major, critical bearable / non-bearable with information to explain the intensity of impact
reasons for repetition, source of risk, cumulative effect
7. ACTIONS / MITIGATION MEASURES:
plan of action against the loss / damage change management, rescheduling, rebudgeting, loss / damaged accepted / ignored factors as drive for effective and successful completion
ar. prachi muley, counselor – RM, semester-11, m.arch. – cm.