Professional Documents
Culture Documents
Chap 008
Chap 008
ABC is a
ABC is designed to
good supplement
provide managers with to our traditional
cost information for cost system
strategic and other I agree!
decisions that potentially
affect capacity and
therefore affect “fixed”
as well as variable costs.
McGraw-Hill/Irwin Slide 2
Learning Objective 1
Understand activity-
based costing and how
it differs from a
traditional costing
system.
McGraw-Hill/Irwin Slide 3
How Costs are Treated Under
Activity–Based Costing
ABC
ABC differs
differs from
from traditional
traditional cost
cost accounting
accounting in
in three
three ways.
ways.
Manufacturing Nonmanufacturing
costs costs
Traditional ABC
product costing product costing
McGraw-Hill/Irwin Slide 4
How Costs are Treated Under
Activity–Based Costing
ABC
ABC differs
differs from
from traditional
traditional cost
cost accounting
accounting in
in three
three ways.
ways.
Manufacturing Nonmanufacturing
costs costs
Mo
Some
st,
All
not but
all
Traditional ABC
product costing product costing
McGraw-Hill/Irwin Slide 5
How Costs are Treated Under
Activity–Based Costing
ABC
ABC differs
differs from
from traditional
traditional cost
cost accounting
accounting in
in three
three ways.
ways.
Level of complexity
Activity–Based
Activity–Based
Costing
Costing
Departmental
Departmental
Overhead
Overhead
Rates
Rates
Plantwide
Plantwide
Overhead
Overhead
Rate
Rate
Each
Each ABC
ABC cost pool has
has its
own
own unique
unique measure of
of activity.
activity.
Traditional
Traditional cost
cost systems
systems usually
usually rely
rely
on
on volume
volume measures
measures such
such asas direct
direct labor
labor
hours
hours and/or
and/or machine
machine hours
hours toto allocate
allocate
all
all overhead
overhead costs
costs to
to products.
products.
ABC uses more cost pools.
McGraw-Hill/Irwin Slide 7
How Costs are Treated Under
Activity–Based Costing
An event that causes the
Activity consumption of overhead
resources.
McGraw-Hill/Irwin Slide 8
How Costs are Treated Under
Activity–Based Costing
An allocation base
in an activity-based
costing system.
McGraw-Hill/Irwin Slide 9
How Costs are Treated Under
Activity–Based Costing
Transaction Duration
driver driver
McGraw-Hill/Irwin Slide 10
How Costs are Treated Under
Activity–Based Costing
ABC defines
five levels of activity
that largely do not relate
to the volume of units
produced.
Traditional
Traditional cost
cost systems
systems usually
usually rely
rely on
on volume
volume
measures
measures such
such asas direct
direct labor
labor hours
hours and/or
and/or machine
machine
hours
hours to
to allocate
allocate all
all overhead
overhead costs
costs to
to products.
products.
McGraw-Hill/Irwin Slide 11
How Costs are Treated Under
Activity–Based Costing
Unit-Level Batch-Level
Activity Activity
Manufacturing
companies typically combine
their activities into five
classifications.
Product-Level Customer-Level
Activity Organization- Activity
sustaining
Activity
McGraw-Hill/Irwin Slide 12
Characteristics of Successful ABC
Implementations
Strong
Strong top
top
management support
Link to evaluations
and
and rewards
Cross-functional
involvement
involvement
McGraw-Hill/Irwin Slide 13
Baxter Battery – An ABC Example
Baxter Battery Company
Income Statement
Year Ended December 31, 2009
Sales $ 50,000,000
Cost of goods sold
Direct materials $ 15,000,000
Direct labor 12,000,000
Manufacturing overhead 14,000,000 41,000,000
Gross margin 9,000,000
Selling and administrative expenses
Shipping expenses 3,000,000
Marketing expenses 2,000,000
General administrative expenses 6,000,000 11,000,000
Net operating income
loss $ (2,000,000)
Manufacturing
Manufacturing overhead
overhead is
is allocated
allocated to
to products
products using
using
aa single
single plantwide
plantwide overhead
overhead rate
rate based
based on
on machine
machine hours.
hours.
McGraw-Hill/Irwin Slide 14
Define Activities, Activity Cost Pools,
and Activity Measures
At Baxter Battery,
Battery, the ABC team, selected
selected the following
activity cost pools
pools and
and activity measures:
Activity Cost Pools at Baxter Battery
Activity Cost Pool Activity Measure
Customer orders Number of customer orders
Design changes Number of design changes
Order size Machine-hours
Customer relations Number of active customers
Other Not applicable
McGraw-Hill/Irwin Slide 15
Define Activities, Activity Cost Pools,
and Activity Measures
Customer
Customer Orders
Orders -- assigned
assigned allall costs
costs of
of resources
resources
that
that are
are consumed
consumed by by taking
taking and
and processing
processing
customer
customer orders.
orders.
Design
Design Changes
Changes -- assigned
assigned allall costs
costs of
of resources
resources
consumed
consumed by by customer
customer requested
requested design
design changes.
changes.
Order
Order Size
Size -- assigned
assigned all
all costs
costs of
of resources
resources
consumed
consumed as as aa consequence
consequence of of the
the number
number ofof units
units
produced.
produced.
Customer
Customer Relations
Relations –– assigned
assigned allall costs
costs associated
associated
with
with maintaining
maintaining relations
relations with
with customers.
customers.
Other
Other –– assigned
assigned all
all organization-sustaining
organization-sustaining costs
costs and
and
unused
unused capacity
capacity costs
costs
McGraw-Hill/Irwin Slide 16
Learning Objective 2
McGraw-Hill/Irwin Slide 17
Assign Overhead Costs to Activity Cost
Pools
Overhead Costs at Baxter Battery
(Manufacturing and Nonmanufacturing)
Production Department
Indirect factory wages $ 6,000,000
Factory equipment depreciation 3,500,000
Factory utilities 2,500,000
Factory building lease 2,000,000 $ 14,000,000
General Administrative Department
Administrative wages and salaries 4,000,000
Office equipment depreciation 900,000
Administrative building lease 1,100,000 6,000,000
Marketing Department
Marketing wages and salaries 1,500,000
Selling expenses 500,000 2,000,000
Total overhead costs $ 22,000,000
McGraw-Hill/Irwin Slide 18
Assign Overhead Costs to Activity Cost
Pools
Overhead Costs at Baxter Battery
(Manufacturing and Nonmanufacturing)
Production Department
Indirect factory wages $ 6,000,000
Factory equipment depreciation 3,500,000
Factory utilities 2,500,000
Factory building lease 2,000,000 $ 14,000,000
General Administrative Department
Administrative wages and salaries 4,000,000
Office equipment depreciation 900,000
Administrative building lease 1,100,000 6,000,000
Marketing Department
Marketing wages and salaries 1,500,000
Selling expenses 500,000 2,000,000
Total overhead costs $ 22,000,000
Direct materials, direct labor, and shipping are excluded
because Baxter Battery’s existing cost system can directly
trace these costs to products or customer orders.
McGraw-Hill/Irwin Slide 19
Assign Overhead Costs to Activity Cost
Pools
At Baxter Battery the following distribution of resource
consumption across activity cost pools is determined.
Activity Cost Pools
McGraw-Hill/Irwin Slide 20
Assign Overhead Costs to Activity Cost
Pools
Overhead Costs at Baxter Battery
(Manufacturing and Nonmanufacturing)
Production Department
Indirect factory wages $ 6,000,000
Factory equipment depreciation 3,500,000
Activity Cost Pools Factory utilities 2,500,000
Customer Design Customer
Factory building lease 2,000,000 $ 14,000,000
Orders changes Order Size
General Relations
Administrative Other
Department Total
Production Department Administrative wages and salaries 4,000,000
Indirect factory wages $ 1,800,000 Office equipment depreciation 900,000
Factory equipment depreciation Administrative building lease 1,100,000 6,000,000
Factory utilities Marketing Department
Factory building lease Marketing wages and salaries 1,500,000
General Administrative Department Selling expenses 500,000 2,000,000
Administrative wages and salaries Total overhead costs $ 22,000,000
Office equipment depreciation
Administrative building lease
Marketing Department
Marketing wages and salaries
Selling expenses
Total
Indirect
Indirect factory
factory wages
wages $6,000,000
$6,000,000
Percent
Percent consumed
consumed by
by customer
customer orders
orders 30%
30%
$1,800,000
$1,800,000
McGraw-Hill/Irwin Slide 21
Assign Overhead Costs to Activity Cost
Pools
Overhead Costs at Baxter Battery
(Manufacturing and Nonmanufacturing)
Production Department
Indirect factory wages $ 6,000,000
Factory equipment depreciation 3,500,000
Activity Cost Pools Factory utilities 2,500,000
Customer Design Customer
Factory building lease 2,000,000 $ 14,000,000
Orders changes Order Size
General Relations
Administrative Other
Department Total
Production Department Administrative wages and salaries 4,000,000
Indirect factory wages $ 1,800,000 Office equipment depreciation 900,000
Factory equipment depreciation 700,000 Administrative building lease 1,100,000 6,000,000
Factory utilities Marketing Department
Factory building lease Marketing wages and salaries 1,500,000
General Administrative Department Selling expenses 500,000 2,000,000
Administrative wages and salaries Total overhead costs $ 22,000,000
Office equipment depreciation
Administrative building lease
Marketing Department
Marketing wages and salaries
Selling expenses
Total
Factory
Factory equipment
equipment depreciation
depreciation $3,500,000
$3,500,000
Percent
Percent consumed
consumed by
by customer
customer orders
orders 20%
20%
$$ 700,000
700,000
McGraw-Hill/Irwin Slide 22
Assign Overhead Costs to Activity Cost
Pools
McGraw-Hill/Irwin Slide 23
Learning Objective 3
Compute activity
rates for cost pools.
McGraw-Hill/Irwin Slide 24
Calculate Activity Rates
Now
Now the
the team
team can
can compute
compute the the individual
individual
activity
activity rates
rates by
by dividing
dividing the
the total
total cost
cost for
for
each
each activity
activity by
by the
the total
total activity
activity levels.
levels.
McGraw-Hill/Irwin Slide 25
Calculate Activity Rates
Computation of Activity Rates
(a) (b) (a) ÷ (b)
Activity Cost Pools Total Cost Total Activity Activity Rate
Customer orders $ 4,520,000 10,000 orders $452 per order
Design changes 3,040,000 4,000 changes $760 per change
Order size 5,200,000 800,000 MHs $6.50 per MH
Customer relations 3,080,000 2,000 customers $1,540 per customer
Other 6,160,000 Not applicable Not applicable
Total $ 22,000,000
McGraw-Hill/Irwin Slide 26
Activity–Based Costing at Baxter Battery
Direct Direct Shipping
Overhead Costs
Materials Labor Costs
Cost Objects:
Products, Customer Orders, Customers
McGraw-Hill/Irwin Slide 27
Activity–Based Costing at Baxter Battery
Direct Direct Shipping
Overhead Costs
Materials Labor Costs
First-Stage Allocation
Cost Objects:
Products, Customer Orders, Customers
McGraw-Hill/Irwin Slide 28
Activity–Based Costing at Baxter Battery
Direct Direct Shipping
Overhead Costs
Materials Labor Costs
First-Stage Allocation
Second-Stage Allocations
Cost Objects:
Unallocated
Products, Customer Orders, Customers
McGraw-Hill/Irwin Slide 29
Learning Objective 4
McGraw-Hill/Irwin Slide 30
Assigning Overhead to Products
Baxter Battery Information
SureStart
SureStart
1.
1. Requires
Requires no no new
new design
design resources.
resources.
2.
2. 800,000
800,000 batteries
batteries ordered
ordered with
with 4,000
4,000 separate
separate orders.
orders.
3.
3. Each
Each SureStart
SureStart requires
requires 36
36 minutes
minutes ofof machine
machine
time
time for
for aa total
total of
of 480,000
480,000 machine-hours.
machine-hours.
LongLife
LongLife
1.
1. Requires
Requires new new design
design resources.
resources.
2.
2. 400,000
400,000 batteries
batteries ordered
ordered with
with 6,000
6,000 separate
separate orders.
orders.
3.
3. 4,000
4,000 custom
custom designs
designs prepared.
prepared.
4.
4. Each
Each LongLife
LongLife requires
requires 48
48 minutes
minutes of
of machine
machine
time
time for
for aa total
total of
of 320,000
320,000 machine-hours.
machine-hours.
McGraw-Hill/Irwin Slide 31
Assigning Overhead to Products
Overhead Cost for the SureStart
(a) (b) (a) × (b)
Activity Cost Pools Activity Rate Activity ABC Cost
Customer orders $ 452.00 4,000 $ 1,808,000
Design changes 760.00 - -
Order size 6.50 480,000 3,120,000
Total $ 4,928,000
McGraw-Hill/Irwin Slide 32
Assigning Overhead to Customers
Let’s take a look at how Baxter Battery’s system works for just
one of the 2,000 customers – Acme Auto Parts who placed a
total of twelve orders. Note that the four orders for LongLifes
required a design change.
Orders
Orders
1.
1. Eight
Eight orders
orders for
for 60
60 SureStarts
SureStarts per
per order.
order.
2.
2. Four
Four orders
orders for
for 50
50 LongLifes
LongLifes per
per order.
order.
Machine-hours
Machine-hours
1.
1. The
The 480
480 SureStarts
SureStarts required
required 288
288 machine-hours.
machine-hours.
2.
2. The
The 200
200 LongLifes
LongLifes required
required 160
160 machine
machine hours.
hours.
McGraw-Hill/Irwin Slide 33
Assigning Overhead to Customers
McGraw-Hill/Irwin Slide 34
Learning Objective 5
Use activity-based
costing to compute
product and customer
margins.
McGraw-Hill/Irwin Slide 35
Prepare Management Reports
Product Margin Calculations
The first step in computing product margins is to
gather each product’s sales and direct cost data.
SureStarts LongLifes Total
Sales $ 31,300,000 $ 18,700,000 $ 50,000,000
Direct costs
Direct material 9,000,000 6,000,000 15,000,000
Direct labor 7,000,000 5,000,000 12,000,000
Shipping 2,000,000 1,000,000 3,000,000
McGraw-Hill/Irwin Slide 36
Prepare Management Reports
Product Margin Calculations
The second step in computing product margins is to
incorporate the previously computed activity-based
cost assignments pertaining to each product.
McGraw-Hill/Irwin Slide 37
Prepare Management Reports
Product Margin Calculations
The third step in computing product
margins is to deduct each product’s
direct and indirect costs from sales.
SureStarts LongLifes
Sales $ 31,300,000 $ 18,700,000
Costs
Direct material $ 9,000,000 $ 6,000,000
Direct labor 7,000,000 5,000,000
Shipping 2,000,000 1,000,000
Customer orders 1,808,000 2,712,000
Design changes 3,040,000
Order size 3,120,000 2,080,000
Total cost 22,928,000 19,832,000
Product margin $ 8,372,000 $ (1,132,000)
McGraw-Hill/Irwin Slide 38
Prepare Management Reports
Product Margin Calculations
The product margins can be reconciled with
the company’s net operating income as follows:
SureStarts LongLifes Total
Sales $ 31,300,000 $ 18,700,000 $ 50,000,000
Total costs 22,928,000 19,832,000 42,760,000
Product margins $ 8,372,000 $ (1,132,000) $ 7,240,000
McGraw-Hill/Irwin Slide 39
Prepare Management Reports
Customer Margin Analysis
The first step in computing Acme Auto Parts’ customer
margin is to gather its sales and direct cost data.
Acme Auto
Parts
Sales $ 29,200
Direct costs
Direct material 7,500
Direct labor 6,700
Shipping 1,700
McGraw-Hill/Irwin Slide 40
Prepare Management Reports
Customer Margin Analysis
The second step is to incorporate Acme Auto Parts’
previously computed activity-based cost assignments.
Acme Auto
Parts
Sales $ 29,200
Direct costs
Direct material 7,500
Direct labor 6,700
Shipping 1,700
ABC cost assignments
Customer orders 5,424
Product design 3,040
Order size 2,912
Customer relations 1,540
McGraw-Hill/Irwin Slide 41
Prepare Management Reports
Customer Margin Analysis
The third step is to compute Acme Auto Parts’ customer margin of
$384 by deducting all its direct and indirect costs from its sales.
Acme Auto Parts
Sales $ 29,200
Direct costs
Direct material $ 7,500
Direct labor 6,700
Shipping 1,700
Customer orders 5,424
Product design 3,040
Order size 2,912
Customer relations 1,540 28,816
Customer margin $ 384
McGraw-Hill/Irwin Slide 42
Product Margins Computed Using the
Traditional Cost System
The first step in computing product margins is to
gather each product’s sales and direct cost data.
McGraw-Hill/Irwin Slide 43
Product Margins Computed Using the
Traditional Cost System
The second step in computing product margins
is to compute the plantwide overhead rate.
Manufacturing Overhead Costs at Baxter Battery
Production Department
Indirect factory wages $ 6,000,000
Factory equipment depreciation 3,500,000
Factory utilities 2,500,000
Factory building lease 2,000,000
Total manufacturing overhead $ 14,000,000
Machine-hours
SureStarts (800,000 @ 0.60 hours) 480,000
LongLifes (400,000 @ 0.80 hours) 320,000
Total machine-hours 800,000
McGraw-Hill/Irwin Slide 44
Product Margins Computed Using the
Traditional Cost System
The third step in computing product margins is
allocate manufacturing overhead to each product.
Machine Overhead Overhead
Hours Rate Allocated
SureStarts 480,000 $ 17.50 $ 8,400,000
LongLifes 320,000 17.50 5,600,000
Total overhead allocated to products $ 14,000,000
McGraw-Hill/Irwin Slide 45
Product Margins Computed Using the
Traditional Cost System
The fourth step is to actually
compute the product margins.
McGraw-Hill/Irwin Slide 46
Differences Between ABC and Traditional
Product Costs
SureStarts LongLifes
Product margins – traditional $ 6,900,000 $ 2,100,000
Product margins – ABC 8,372,000 (1,132,000)
Change in reported margins $ 1,472,000 $ (3,232,000)
McGraw-Hill/Irwin Slide 47
Differences Between ABC and Traditional
Product Costs
There are three reasons why the
reported product margins for the two
costing systems differ from one another.
McGraw-Hill/Irwin Slide 48
Differences Between ABC and Traditional
Product Costs
There are three reasons why the
reported product margins for the two
costing systems differ from one another.
McGraw-Hill/Irwin Slide 49
Differences Between ABC and Traditional
Product Costs
There are three reasons why the
reported product margins for the two
costing systems differ from one another.
McGraw-Hill/Irwin Slide 50
Targeting Process Improvement
Activity-based management is
used in conjunction with ABC to
identify areas that would benefit
from process improvements.
Benchmarking
Benchmarking can
can be
be used
used to
to compare
compare activity
activity cost
cost
information
information with
with world-class
world-class standards
standards of
of performance
performance
achieved
achieved by
by other
other organizations.
organizations.
McGraw-Hill/Irwin Slide 51
Activity-Based Costing and External Reporting
McGraw-Hill/Irwin Slide 52
ABC Limitations
McGraw-Hill/Irwin Slide 53
ABC Action Analysis
Appendix 8A
(Appendix 8A)
Prepare an action
analysis report using
activity-based costing
data and interpret the
report.
McGraw-Hill/Irwin Slide 55
Appendix 8A: ABC Action Analysis
McGraw-Hill/Irwin Slide 56
Appendix 8A: ABC Action Analysis
Constructing an action analysis report begins
with the first-stage allocation process. In
addition to computing an overall activity rate
for each activity cost pool, an activity rate is
computed for each type of overhead cost that
is consumed supporting a given activity.
Let’s revisit the stage-one allocations
from the Baxter Battery Company example
that we discussed earlier.
McGraw-Hill/Irwin Slide 57
Activity Cost Pools
Customer Design Customer
Orders Changes Order Size Relations Other
Total Activity 10,000 4,000 800,000 2,000 N/A
McGraw-Hill/Irwin Slide 61
Appendix 8A: ABC Action Analysis
Action Analysis of LongLife Batteries
Sales $ 18,700,000
Green costs
Direct materials $ 6,000,000
Shipping costs 1,000,000 7,000,000
Green margin $ 11,700,000
Yellow costs
Direct labor 5,000,000
Indirect factory wages 3,360,000
Factory utilities 850,000
Administrative wages and salaries 1,280,000
Office equipment depreciation 252,000
Marketing wages and salaries 420,000
Selling expenses 60,000 11,222,000
Yellow margin $ 478,000
Red costs
Factory equipment depreciation 1,610,000
Factory building lease -
Administrative building lease - 1,610,000
Red margin $ (1,132,000)
McGraw-Hill/Irwin Slide 62
Using a Modified Form of Activity-Based
Costing to Determine Product Costs for
External Reports
Appendix 8B
(Appendix 8B)
Use activity-based
costing techniques to
compute unit product
costs for external
reports.
McGraw-Hill/Irwin Slide 64
Appendix 8B
A
A modified
modified form
form of
of activity-based
activity-based
costing can
can bebe used
used to develop
develop product
product
costs for
for external financial
financial reports.
reports.
ABC
ABC product
product costs:
costs:
•• Include
Include organization-sustaining
organization-sustaining costs
costs
and
and unused
unused capacity
capacity costs.
costs.
•• Exclude
Exclude nonmanufacturing
nonmanufacturing costs
costs even
even
ifif they
they are
are caused
caused by
by the
the products.
products.
McGraw-Hill/Irwin Slide 65
Appendix 8B
Deluxe Standard
Direct materials cost per unit $ 38.00 $ 28.00
Direct labor cost per unit $ 24.00 $ 12.00
Direct labor hours per unit 2.0 1.0
Units produced 100,000 200,000
McGraw-Hill/Irwin Slide 66
Appendix 8B
Predetermined $1,800,000
= = $4.50 per DLH
overhead rate 400,000 DLHs
McGraw-Hill/Irwin Slide 67
Appendix 8B
Deluxe Standard
Direct materials cost per unit $ 38.00 $ 28.00
Direct labor cost per unit 24.00 12.00
Manufacturing overhead per unit 9.00 4.50
Unit product cost $ 71.00 $ 44.50
McGraw-Hill/Irwin Slide 68
Appendix 8B
McGraw-Hill/Irwin Slide 69
Appendix 8B
Estimated Total
Overhead Expected
Activity and Activity Measures Cost Activity Activity Rate
Direct labor support (DLHs) $ 900,000 ÷ 400,000 = $ 2.25 per DLH
Machine setups (setups) 600,000 ÷ 500 = $ 1,200 per setup
Parts administration (part types) 300,000 ÷ 300 = $ 1,000 per part type
Total manufacturing overhead $ 1,800,000
McGraw-Hill/Irwin Slide 70
Appendix 8B
Deluxe Product
Expected Activity
Activity and Activity Measures Activity Rate Amount
Direct labor support (DLHs) 200,000 × $ 2.25 = $ 450,000
Machine setups (setups) 400 × $ 1,200 = 480,000
Parts administration (part types) 200 × $ 1,000 = 200,000
Total overhead cost assigned $ 1,130,000
Standard Product
Expected Activity
Activity and Activity Measures Activity Rate Amount
Direct labor support (DLHs) 200,000 × $ 2.25 = $ 450,000
Machine setups (setups) 100 × $ 1,200 = 120,000
Parts administration (part types) 100 × $ 1,000 = 100,000
Total overhead cost assigned $ 670,000
McGraw-Hill/Irwin Slide 71
Appendix 8B
Activity-based
Activity-based unit
unit product
product costs
costs for
for both
both product
product lines
lines
Premium Standard
Direct materials cost per unit $ 38.00 $ 28.00
Direct labor cost per unit 24.00 12.00
Manufacturing overhead per unit 11.30 3.35
Unit product cost $ 73.30 $ 43.35
McGraw-Hill/Irwin Slide 72
Appendix 8B
Activity-based
Activity-based unit
unit product
product costs
costs for
for both
both product
product lines
lines
Premium Standard
Direct materials cost per unit $ 38.00 $ 28.00
Direct labor cost per unit 24.00 12.00
Manufacturing overhead per unit 11.30 3.35
Unit product cost $ 73.30 $ 43.35
McGraw-Hill/Irwin Slide 73
Appendix 8B
Comparing the two approaches
Activity-B ased C osting Traditional C osting
D eluxe S tandard D eluxe S tandard
D irect material $ 38.00 $ 28.00 $ 38.00 $ 28.00
D irect labor 24.00 12.00 24.00 12.00
Manufacturing overhead 11.30 3.35 9.00 4.50
U nit product cost $ 73.30 $ 43.35 $ 71.00 $ 44.50
McGraw-Hill/Irwin Slide 74
End of Chapter 8
McGraw-Hill/Irwin Slide 75