You are on page 1of 2

List of Hydro projects under execution

(Excluding projects under Ministry of New & Renewable Energy)


*****
As on 30.09.2010
Sl. Name of Project Unit State/ Capacity Likely
No. No. Implem. Agency (MW) Commissioning
A. Projects as per 11th Plan Programme
Central Sector
1 Parbati St. II U-1 to Himachal Pradesh/ 800 12th Plan
4x200= 800 MW U-4 NHPC
2 Chamera-III U-1 to Himachal Pradesh/ 231 2010-12
3x77= 231 MW U-3 NHPC
3 Parabati-III U-1 to Himachal Pradesh/ 520 2011-12
4x130= 520 MW U-4 NHPC
4 Kol Dam U-1 to Himachal Pradesh/ 800 2011-12
4x200= 800 MW U-4 NTPC
5 Rampur U-1 to Himachal Pradesh/ 412 12th Plan
6x68.67= 412 MW U-6 SJVNL

6 Uri-II U-1 to Jammu & Kashmir/ 240 2010-12


4x60= 240 MW U-4 NHPC
7 Chutak U-1 to Jammu & Kashmir/ 44 2011-12
4x11=44 MW U-4 NHPC
8 Nimoo Bazgo U-1 to Jammu & Kashmir/ 45 2011-12
3x15=45 MW U-3 NHPC
9 Koteshwar U-1 to Uttaranchal/ 400 2010-12
4x100= 400 MW U-4 THDC
10 Loharinagpala U-1 to Uttaranchal/ 600 12th Plan
4x150=600 MW U-4 NTPC
11 Tapovan Vishnugad U-1 to Uttaranchal/ 520 12th Plan
4x130=520 MW U-4 NTPC
12 Teesta Low Dam-III U-1 to West Bengal/ 132 2010-11
4x33= 132 MW U-4 NHPC
13 Teesta Low Dam-IV U-1 to West Bengal/ 160 2011-12
4x40= 160 MW U-4 NHPC
14 Subansiri Lower U-1 to Arunachal Pradesh/ 2000 12th Plan
8x250= 2000 MW U-8 NHPC
15 Kameng U-1 to Arunachal Pradesh/ 600 12th Plan
4x150= 600 MW U-4 NEEPCO
Sub- total (Central): 7504
State Sector
16 Uhl-III U-1 to Himachal Pradesh/ 100 12th Plan
3x33.33= 100 MW U-3 Beas Valley Power Corp.
Ltd. (BVPC)
17 Swara Kuddu U-1 to Himachal Pradesh/ 110 12th Plan
3x36.6= 110 MW U-3 Pabbar Valley Corp.
(PVC)
18 Priyadarshni Jurala U-4 to Andhra Pradesh/ 78 2010-11
6x39= 234 MW U-6 APGENCO
19 Nagarujana Sagar TR U-1 & Andhra Pradesh/ 50 2010-12
2x25= 50 MW U-2 APGENCO
20 Lower Jurala U-1 to Andhra Pradesh/ 240 12th Plan
6x40= 240 MW U-6 APGENCO
21 Pulichintala U-1 to Andhra Pradesh/ 120 2010-12
4x30= 120 MW U-4 APGENCO
22 Pallivasal U-1 to Kerala/ 60 12th Plan
2x30= 60 MW U-2 KSEB
23 Bhawani Barrage II U-1 & Tamil Nadu/ 30 2011-12
2x15= 30 MW U-2 TNEB
24 Bhawani Barrage III U-1 & Tamil Nadu/ 30 2011-12
2x15= 30 MW U-2 TNEB
25 Myntdu U-1& Meghalaya/ 84 2010-11
2x42= 84 MW U-2 MeSEB
26 New Umtru U-1& Meghalaya/ 40 2011-12
2x20= 40 MW U-2 MeSEB
Sub- total (State): 942
Sl. Name of Project Unit State/ Capacity Likely
No. No. Implem. Agency (MW) Commissioning
Private Sector
27 Karcham Wangtoo U-1 to Himachal Pradesh/ 1000 2011-12
4x250= 1000 MW U-4 JPKPL
28 Budhil U-1 & Himachal Pradesh/ 70 2010-11
2x35= 70 MW U-2 LANCO
29 Malana-II U-1 & Himachal Pradesh/ 100 2010-11
2x50= 100 MW U-2 Everest PC
30 Sorang U-1 & Himachal Pradesh/ 100 2011-12
2x50= 100 MW U-2 Himachal Sorang Power
Corporation Ltd.
31 Shrinagar U-1 to Uttarakhand/ 330 2011-12
4x82.5= 330 MW U- 4 M/s GVK Industries
32 Maheshwar U-1 to Madhya Pradesh/ 400 2011-12
10x40= 400 MW U-10 SMHPCL
33 Chujachen U-1& Sikkim/ 99 2010-11
2x49.5= 99 MW U-2 Gati
34 Teesta- III U-1 to Sikkim/ 1200 2011-12
6x200= 1200 MW U-6 Teesta Urja Ltd.
Sub- total (Private): 3299
Total ‘A’ (11th Plan): 11745
A-1 Additional Unit likely to commission in 11th Plan
25a Myntdu U-1 Meghalaya/ 42 2011-12
1x42= 42 MW MeSEB
B. Projects likely to give benefits beyond 11th Plan
Central Sector
35 Kishanganga U-1 to Jammu & Kashmir/ 330 12th Plan
3x110= 330 MW U-3 NHPC
36 Pare U-1 to Arunachal Pradesh/ 110 12th Plan
2x55= 110 MW U-2 NEEPCO
State Sector
37 Baglihar-II* U-1 to J&K/ 450 12th Plan
3x150= 450 MW U-3 JKPDC
38 Kashang-I Himachal Pradesh/ 65 12th Plan
65 MW HPPCL
39 Thottiyar Kerala/ 40 12th Plan
40 MW KSEB
Private Sector
40 Tidong-I U-1 to Himachal Pradesh/ 100 12th Plan
2x50= 100 MW U-2 M/s Nuziveedu Seeds
41 Phata Byung Uttarakhand/ 76 12th Plan
76 MW M/s Lanco
42 Singoli Bhatwari U-1 to Uttarakhand/ 99 12th Plan
3x33= 99 MW U-3 L&T Uttaranchal Hydro
power Limited
43 Teesta- VI U-1 to Sikkim/ 500 12th Plan
4x125= 500 MW U-4 LANCO
44 Rangit-IV U-1 to Sikkim/ 120 12th Plan
3x40= 120 MW U-3 Jal Power corp. Ltd.
45 Jorethang Loop Sikkim/ 96 12th Plan
2x48= 96 MW M/s DANS Energy
46 Bhasmey U-1 to Sikkim/ 51 12th Plan
3x17= 51 MW U-3 Gati Infrastructure
Total ‘B’ (Beyond 11th Plan): 2037
Total- Under Execution: 13824

** Works allotted with Baglihar - I