(Excluding projects under Ministry of New & Renewable Energy)
***** As on 30.09.2010 Sl. Name of Project Unit State/ Capacity Likely No. No. Implem. Agency (MW) Commissioning A. Projects as per 11th Plan Programme Central Sector 1 Parbati St. II U-1 to Himachal Pradesh/ 800 12th Plan 4x200= 800 MW U-4 NHPC 2 Chamera-III U-1 to Himachal Pradesh/ 231 2010-12 3x77= 231 MW U-3 NHPC 3 Parabati-III U-1 to Himachal Pradesh/ 520 2011-12 4x130= 520 MW U-4 NHPC 4 Kol Dam U-1 to Himachal Pradesh/ 800 2011-12 4x200= 800 MW U-4 NTPC 5 Rampur U-1 to Himachal Pradesh/ 412 12th Plan 6x68.67= 412 MW U-6 SJVNL
6 Uri-II U-1 to Jammu & Kashmir/ 240 2010-12
4x60= 240 MW U-4 NHPC 7 Chutak U-1 to Jammu & Kashmir/ 44 2011-12 4x11=44 MW U-4 NHPC 8 Nimoo Bazgo U-1 to Jammu & Kashmir/ 45 2011-12 3x15=45 MW U-3 NHPC 9 Koteshwar U-1 to Uttaranchal/ 400 2010-12 4x100= 400 MW U-4 THDC 10 Loharinagpala U-1 to Uttaranchal/ 600 12th Plan 4x150=600 MW U-4 NTPC 11 Tapovan Vishnugad U-1 to Uttaranchal/ 520 12th Plan 4x130=520 MW U-4 NTPC 12 Teesta Low Dam-III U-1 to West Bengal/ 132 2010-11 4x33= 132 MW U-4 NHPC 13 Teesta Low Dam-IV U-1 to West Bengal/ 160 2011-12 4x40= 160 MW U-4 NHPC 14 Subansiri Lower U-1 to Arunachal Pradesh/ 2000 12th Plan 8x250= 2000 MW U-8 NHPC 15 Kameng U-1 to Arunachal Pradesh/ 600 12th Plan 4x150= 600 MW U-4 NEEPCO Sub- total (Central): 7504 State Sector 16 Uhl-III U-1 to Himachal Pradesh/ 100 12th Plan 3x33.33= 100 MW U-3 Beas Valley Power Corp. Ltd. (BVPC) 17 Swara Kuddu U-1 to Himachal Pradesh/ 110 12th Plan 3x36.6= 110 MW U-3 Pabbar Valley Corp. (PVC) 18 Priyadarshni Jurala U-4 to Andhra Pradesh/ 78 2010-11 6x39= 234 MW U-6 APGENCO 19 Nagarujana Sagar TR U-1 & Andhra Pradesh/ 50 2010-12 2x25= 50 MW U-2 APGENCO 20 Lower Jurala U-1 to Andhra Pradesh/ 240 12th Plan 6x40= 240 MW U-6 APGENCO 21 Pulichintala U-1 to Andhra Pradesh/ 120 2010-12 4x30= 120 MW U-4 APGENCO 22 Pallivasal U-1 to Kerala/ 60 12th Plan 2x30= 60 MW U-2 KSEB 23 Bhawani Barrage II U-1 & Tamil Nadu/ 30 2011-12 2x15= 30 MW U-2 TNEB 24 Bhawani Barrage III U-1 & Tamil Nadu/ 30 2011-12 2x15= 30 MW U-2 TNEB 25 Myntdu U-1& Meghalaya/ 84 2010-11 2x42= 84 MW U-2 MeSEB 26 New Umtru U-1& Meghalaya/ 40 2011-12 2x20= 40 MW U-2 MeSEB Sub- total (State): 942 Sl. Name of Project Unit State/ Capacity Likely No. No. Implem. Agency (MW) Commissioning Private Sector 27 Karcham Wangtoo U-1 to Himachal Pradesh/ 1000 2011-12 4x250= 1000 MW U-4 JPKPL 28 Budhil U-1 & Himachal Pradesh/ 70 2010-11 2x35= 70 MW U-2 LANCO 29 Malana-II U-1 & Himachal Pradesh/ 100 2010-11 2x50= 100 MW U-2 Everest PC 30 Sorang U-1 & Himachal Pradesh/ 100 2011-12 2x50= 100 MW U-2 Himachal Sorang Power Corporation Ltd. 31 Shrinagar U-1 to Uttarakhand/ 330 2011-12 4x82.5= 330 MW U- 4 M/s GVK Industries 32 Maheshwar U-1 to Madhya Pradesh/ 400 2011-12 10x40= 400 MW U-10 SMHPCL 33 Chujachen U-1& Sikkim/ 99 2010-11 2x49.5= 99 MW U-2 Gati 34 Teesta- III U-1 to Sikkim/ 1200 2011-12 6x200= 1200 MW U-6 Teesta Urja Ltd. Sub- total (Private): 3299 Total ‘A’ (11th Plan): 11745 A-1 Additional Unit likely to commission in 11th Plan 25a Myntdu U-1 Meghalaya/ 42 2011-12 1x42= 42 MW MeSEB B. Projects likely to give benefits beyond 11th Plan Central Sector 35 Kishanganga U-1 to Jammu & Kashmir/ 330 12th Plan 3x110= 330 MW U-3 NHPC 36 Pare U-1 to Arunachal Pradesh/ 110 12th Plan 2x55= 110 MW U-2 NEEPCO State Sector 37 Baglihar-II* U-1 to J&K/ 450 12th Plan 3x150= 450 MW U-3 JKPDC 38 Kashang-I Himachal Pradesh/ 65 12th Plan 65 MW HPPCL 39 Thottiyar Kerala/ 40 12th Plan 40 MW KSEB Private Sector 40 Tidong-I U-1 to Himachal Pradesh/ 100 12th Plan 2x50= 100 MW U-2 M/s Nuziveedu Seeds 41 Phata Byung Uttarakhand/ 76 12th Plan 76 MW M/s Lanco 42 Singoli Bhatwari U-1 to Uttarakhand/ 99 12th Plan 3x33= 99 MW U-3 L&T Uttaranchal Hydro power Limited 43 Teesta- VI U-1 to Sikkim/ 500 12th Plan 4x125= 500 MW U-4 LANCO 44 Rangit-IV U-1 to Sikkim/ 120 12th Plan 3x40= 120 MW U-3 Jal Power corp. Ltd. 45 Jorethang Loop Sikkim/ 96 12th Plan 2x48= 96 MW M/s DANS Energy 46 Bhasmey U-1 to Sikkim/ 51 12th Plan 3x17= 51 MW U-3 Gati Infrastructure Total ‘B’ (Beyond 11th Plan): 2037 Total- Under Execution: 13824