G
lobal telecom equipment sites will save operators over USD120 1,600W in 2007, and the total power
suppliers are rolling out their million in Europe. Due to small dimensions consumption of the site was around
own green BTSs. However, and light weight, more than 70% civil 3,000W. If power consumption of both
each might have a different works can be reduced at the same time. BTS and auxiliary equipment can be
understanding on the definition of a green With increasing price of fuel, more cost on optimized, a site with less than 450W
BTS since currently there is no defined OPEX could be further saved. power consumption will lead to 85%
standard in the industry. In the industry, promoting integration, decrease in total power consumption,
If we analyze the one-time capital adding external combiner, or shortening the which is about 22,000 kilowatt hours per
expenditure (CAPEX) before launch time backup time by reducing battery facilities is site every year. That means 70 million
and the operational expenditure (OPEX) commonly used to make the site acquisition liters of fuel, accounting for USD400
afterwards, it is apparent that a real green easier. Due to low BTS integration and site million, and would be saved for an African
BTS should incorporate environmental limitation brought by tower, space, cost etc., GSM operator with 10,000 outdoor sites
protection into product design and produce the number of feeders and antennas will in 5 years.
to significantly lower the total cost of be consequently restricted. To realize that To achieve this target, Huawei green
ownership (TCO) while saving energy. multiple carriers share the same feeder and BTS adopts enhanced Doherty technology,
The green BTS benefits mobile antenna, an expensive external combiner the latest power amplifier chipset, and
operators mainly in these three important has to be added. brand new hardware design to realize
areas: auxiliary equipment, network The green BTS will be able to provide energy conservation and environmental
deployment, and environmental protection 4 to 6 carriers by one common port. For a protection by a three-tier approach.
and resources utilization. S12/12/12 site, only 1 to 2 battery cabinets First, the latest power amplifier chipset
are required, about 0.5m2 occupied, which and high efficiency scheduling algorithm
makes site acquisition more convenient can effectively reduce more than 60% of
Reducing sites and and flexible, saves CAPEX, and shortens the static power, substantially avoiding the
saving auxiliary cost the network planning and rollout period. unnecessary waste of energy.
Second, industry-wide power amplifier
As the cost of BTS often occupies only efficiency was less than 33% in 2006,
around 30% of one site CAPEX, while Power consumption cut but with the latest chipset and enhanced
in Europe and other developed countries, by 50% D P D & Do h e r t y t e c h n o l o g i e s , t h e
t h e p ro p o r t i o n i n C A PE X i s a b o u t amplifier efficiency is improved from
15%. Reducing the site related auxiliary Environmentally friendly products 33% to 45%. It is safe to forecast that
equipment will directly decrease CAPEX. generally feature lower power consumption, the power amplifier efficiency will be
Higher integration is thus demanded. less noise, less electromagnetic radiation, improved to 50% by the year 2008. As a
Suppose a GSM site with S12/12/12 and lower environmental impact. That consequence, power consumption will be
typical configuration in dense urban, the is precisely what the green BTS aims to further decreased, and fuel consumption
footprint of site with traditional BTS will achieve. and emission of carbon dioxide will be
be over 1.5m 2 . If the footprint can be For example, a typical GSM S4/4/4 site significantly reduced. By using high-
decreased to 0.5m2, acquisition of 10,000 with a traditional macro BTS consumed efficiency power amplifier technologies

23 FEB 2008 . ISSUE 38


Huawei Technologies

and the latest amplifier chipset, the internal heat the industry’s average. These enable the distributed
generated by the BTS components is greatly BTS to support up to 12 transceivers per sector. The
decreased. The traditional heat dissipation methods capacity bottleneck has been eventually broken.
such as air-conditioning and heat-exchange can The modular design is an innovative new type
be replaced by convection cooling or natural heat of BTS, which simplifies wiring between different
dissipation, eliminating noise and saving energy. modules and enables the BTS to be stacked or
Third, according to a number of industr y assembled in various ways like a building block. This
consulting firms, 750W power supply is a dividing makes site construction simpler, expansion smoother,
line between green energy and fuel engine. If a less- and civil works costs related to site lower. Operators
than 750W BTS uses green energy, investment will benefit from convenient installation and easier
balance can be reached within three years compared site acquisition, reducing the investment on site and
with that uses a fuel engine. For small BTSs or shortening network deployment time.
distributed BTSs in low traffic areas, such as the The green BTS is an effective means of ensuring
BTSs of one sector and less than 2 transceivers, profitability and assisting operators to rapidly lower
their power consumption is far less than 750W. TCO in an increasingly competitive environment.
Therefore, the green energy such as solar, and wind As a leading telecom equipment provider, Huawei
can be used to power the BTSs. This not only saves is making persistent efforts to innovate based on
the investment, but also takes full advantage of using customer demands. Its series of green BTSs will
natural energy to eliminate environmental pollution. bridge the standards gap to realize multi-system
integration, and help operators to lower TCO
through a green way.
Easier installation Editor: Chen Yuhong chyhong@huawei.com
It is well known that a traditional BTS is
composed of many modules including baseband, RF,
combiner, transmission, operation and management.
These cause very complicated wiring and rigid
installation mode, making site construction and
expansion difficult.
In 2005, distributed BTS with open common
port radio interface (CPRI) was developed as the first
modular BTS. As the distributed BTS is physically
divided into baseband module and RF module
interconnected through optical fiber, the flexibility of
site acquisition and installation is greatly enhanced.
With regard to the dimensions, a baseband module
that is 3U to 4U in height can enable the installation
on the existing equipment such as an automatic
power management (APM) cabinet, transmission
equipment cabinet or remote equipment room.
Thanks to its light weight, the RF module supports
various installation modes including installation
on tower, pole, or against wall. Because of its
small capacity (one or two carriers), a traditional
distributed BTS is only applicable to indoor coverage
or small capacity application scenarios.
In 2008, Huawei’s full range of the fourth
generation BTSs will be highly modularized. All
BTSs will be unified to baseband and RF modules.
Due to introduction of multi-carrier and broadband
radio technology, the capacity of baseband unit will
be improved by five times, and meanwhile the height
will be further reduced to 1U to 2U. In terms of RF
module, the dimensions remain unchanged but one
single module can support 4 to 6 carriers, accounting
for 2 to 3 times capacity increase compared with

FEB 2008 . ISSUE 38 24