You are on page 1of 4

Bill Of Quantity ( BoQ ) 27.95% 27,953,750.

00
Project Renovasi Rumah Usaha Salon SHAFIRA
BOBOT HARGA SAT HARGA TOTAL
NO JENIS PEKERJAAN SAT VOL
(%) ( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6) (7)

I Pek.PERSIAPAN 3.50% 3,500,000.00


Mob & deMob Tenaga & Peralatan Ls 1 0.025 2,500,000.00 2,500,000.00
Marking & Pengukuran Ls 1 0.010 1,000,000.00 1,000,000.00

II Pek. PONDASI 0.00% -


Galian Pondasi Menerus M 3
- 138,200.00 -
Pemadatan Tanah & urugan Pasir Bawah Pondasi M3 - 216,400.00 -
Lantai Kerja bawah Pondasi M3 - 606,600.00 -
Pas.Pondasi Batu Kali M3 - 571,680.00 -
Urugan Kembali M 3
- 18,700.00 -

III Pek. DINDING 0.00% -


Pas.Dinding 1/2 Bata M 2
- 83,260.00 -
Plester Dinding 1:2 M 2
- 30,600.00 -
Plester Dinding 1:5 M2 - 27,900.00 -
Acian Dinding M2 - 18,400.00 -
Pek.Tali Air Kusen pintu & Jendela M1 - 11,200.00 -
Pek.Tali Air Plint Lantai M 1
- 11,200.00 -
Pek.Dinding Relief M 2
- 114,700.00 -
Pas.Dinding Bt.Alam M 2
- 141,520.00 -
Pek.Skoneng Dinding M 1
- 19,800.00 -
,
IV Pek. BETON BERTULANG 0.00% -
Kolom 20x20 M 3
- 5,406,900.00 -
Kolom 10x15 M 3
- 5,194,400.00 -
Kolom Praktis 10x10 M 3
- 4,769,400.00 -
Sloop 15x20 M 3
- 3,502,700.00 -
Balok 15x20 M 3
- 5,831,900.00 -
Balok Lintle 10x15 M 3
- 3,326,600.00 -
Dak Talang Air 112x12cm M 3
- 4,521,800.00 -
Cantilever 10cm M 3
- 4,587,000.00 -
Top Gable / Canopy 10cm M 3
- 4,587,000.00 -
Acian Cantilever & Canopy M2 - 18,400.00 -
Acian Dak Talang M2 - 18,400.00 -

V Pek. KUDA2 RANGKA ATAP & PLAPON 4.50% 4,500,000.00


Pas.Rangka Atap Baja Ringan M 2
- 190,000.00 -
Pas.Alumunium Foil / Sisalation M 2
- 20,200.00 -
Pas.Penutup Atap M 2
- 108,940.00 -
Pas.Talang Jurai M 1
- 110,710.00 -
Pas.Nok Bubungan M1 - 124,420.00 -
Pas.Nok Jurai M1 - 124,420.00 -
Pas.Accessories Swastike Terakota Bh 9 0.045 500,000.00 4,500,000.00
Pas.Papan Listplank 3x20cm M1 - 67,600.00 -
Pas.Rangka & Plapon Datar M2 - 85,750.00 -
Pas.Rangka & Plapon Drop Akustik M2 - 241,400.00 -
Pas.List Plapon M 1
- 20,710.00 -
BOBOT HARGA SAT HARGA TOTAL
NO JENIS PEKERJAAN SAT VOL
(%) ( Rp ) ( Rp )
(1) (2) (3) (4) (5) (6) (7)

VI Pek. PINTU & JENDELA 1.88% 1,882,000.00


Pas.Kusen Pintu & Jendela M 3
- 7,515,000.00 -
Pas.Daun Pintu Kaca Utama M 2
- 432,200.00 -
Pas.Daun Pintu Kaca 1 M 2
- 432,200.00 -
Pas.Daun Jendela Kaca M 2
- 432,200.00 -
Pas.Engsel Pintu Bh 10 0.003 33,000.00 330,000.00
Pas.Kunci Pintu Set 2 0.005 252,000.00 504,000.00
Pas.Handle Pintu Bh 4 0.003 80,000.00 320,000.00
Pas.Engsel Jendela Bh 8 0.002 28,000.00 224,000.00
Pas.Sloot Jendela Bh 4 0.002 54,000.00 216,000.00
Pas.Handle Jendela Bh 4 0.002 50,600.00 202,400.00
Pas.Hook Angin Jendela Bh 4 0.001 21,400.00 85,600.00
Pas.Door Stoper Bh 4 0.004 90,000.00 360,000.00
-
VII Pek. LANTAI 0.00% -
Urugan Tanah Bawah Lantai M 3
- 150,600.00 -
Pemadatan Tanah & Urugan Pasir Bawah Lantai M 3
- 216,400.00 -
Pas.Keramik Lantai 40x40 M 2
- 237,570.00 -
Pas.Plint Keramik 10x40 M 1
- 29,630.00 -
Pas.Keramik Lantai Akustik Teras M 2
- 348,200.00 -

VIII Pek. CAT & Waterproofing 0.00% -


Pek.Cat Dinding Dalam M 2
- 44,460.00 -
Pek.Cat Dinding Luar M 2
- 63,160.00 -
Pek.Cat Kusen Pintu & Jendela M 2
- 52,500.00 -
Pek.Cat Daun Pintu & Jendela M 2
- 52,500.00 -
Pek.Cat Plapon M 2
- 29,210.00 -
Pek.Cat List Plapon M 1
- 13,500.00 -
Pek.Cat Batu Alam M 2
- 63,160.00 -
Pek.Waterproofing Dak Talang M 2
- 131,800.00 -
Pek.Waterproofing Dinding Luar M 2
- 97,480.00 -

IX Pek. MEKHANIKAL & ELEKTRIKAL 16.19% 16,191,750.00


Pas. & Instalasi Titik Lampu Ttk 28 0.049 174,000.00 4,872,000.00
Pas. & Instalasi Stop Kontak Ttk 15 0.028 189,000.00 2,835,000.00
Pas. & Instalasi Saklar Tunggal Ttk 15 0.028 189,000.00 2,835,000.00
Pas. & Instalasi Saklar Ganda Ttk 15 0.028 189,000.00 2,835,000.00
Pas. Lampu Down Light Bh 20 0.012 62,050.00 1,241,000.00
Pas. Lampu Hidden Lamp Bh 5 0.003 63,350.00 316,750.00
Pas. Lampu Baret Bh 3 0.003 95,600.00 286,800.00
Pas. Panel fuse Box Bh 1 0.003 340,000.00 340,000.00
Pas. & Instalasi air bekas Ttk 10 0.004 36,620.00 366,200.00
Pas. & Instalasi Roof Drain Ttk 4 0.003 66,000.00 264,000.00

X Pek. LAIN-LAIN 1.70% 1,700,000.00


Pek. Bobokan Beton & Dinding Existing M 2
- 54,320.00 -
Pek. Bongkar Lantai existing M 2
- 18,200.00 -
Pek. Bongkar Pintu & Jendela Existing Ls 1 0.010 1,000,000.00 1,000,000.00
Pek. Buang puing ex Bobokan Ls 1 0.002 200,000.00 200,000.00
Pek. Perapihan & Pembersihan Ls 1 0.005 500,000.00 500,000.00

JUMLAH TOTAL 27.95% 27,953,750.00


SPECIFIKASI MATERIAL

NO JENIS MATERIAL / BAHAN UKURAN SAT HARGA SATUAN NAMA PRODUKSI

1 Semen PC ( Abu-Abu ) 50 Kg Sak Tiga Roda


2 Semen Instan Kg MU
3 Semen Putih Kg
4 Pasir Pasang M3
5 Pasir Cor M3
6 Pasir Putih M3
7 Pasir Urug M3
8 Batu Split 1:2 M3
9 Batu Split 2:3 M3
10 Batu Kali M3
11 Batu Belah / Gunung M3
12 Bata Merah Bh
13 Bata Hebel Bh
14 Bataco Bh
15 Besi Polos D6 Btg
16 Besi Polos D8 Btg
17 Besi Polos D10 Btg
18 Besi Polos D12 Btg
19 Besi Ulir D10 Btg
20 Besi Ulir D12 Btg
21 Besi Ulir D13 Btg
22 Kayu Kaso 4x6 M3
23 Kayu Kaso 5x7 M3
24 Kayu Balok 6x8 M3
25 Kayu Balok 8x12 M3
26 Kayu Balok 10x12 M3
27 Kayu reng 3x4 M3
28 Kayu Papan Cor 2x20 M3
29 Kayu Papan ListPlank 3x20 M3
30 Triplek 4 mm Lbr
31 Teakwood Sungkai 4 mm Lbr
32 Teakwood Nyatoh 4 mm Lbr
33 Triplek Melamin Putih 4 mm Lbr
34 Megateak 4 mm Lbr
35 Multiplek 6 mm Lbr
36 Multiplek 9 mm Lbr
37 Multiplek 12 mm Lbr
38 Multiplek 15 mm Lbr
39 Multiplek 18 mm Lbr
40 Blockboard 18 mm Lbr
41 BlockTeak 18 mm Lbr
42 Partikelboard 4 mm Lbr
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69

You might also like