You are on page 1of 6
HastiEconomizer, Tea System for (Onions nom 5h Econo) ye, Hea Recovery Syslom Continuous Blowdown When « boils steaming, solid inthe water are left behind inthe boi, increasing concentation. The Penn Flash Economizer Boiler water treatment with phosphates or chelating Si You Money ‘agents des not reduce the amount of concentation but it chemical reacts with bole solids to reduce or eliminate scale forming materia, If he concentration of solids becomes too high, foaming and priming can ocr, and excessive sludge can restric circulation and heat transfer causing rupurng and blistering of boiler tubes or shell Since the concentration i greatest ot the point of highest steam release, the best location forthe continuous lowdown is just below the water vel in the bol, [A this point of highest concentration (about 4” to 6” below the water level), boiler water is continu- ally drained off to reduce the concentrated boiler water. Fresh make-up water with a much lesser concentration i, atthe same time token, into the boiler. While this is the best method of controlling Total Dissolved Solids (T.D.S.) in the boiler, valu- cable heat can be lost. Continuous blowdown of 1 gpm on a 150 psig boiler wastes169,000 BTUs/Hr. This blowdown ‘water, too hot to dump to streams or public sewage, must be cooled fo a least 140°F in most locates. Tempering this water with added cold water or just toking the water and dumping it fo a hot well or Blowdown tank becomes costly because you'e losing both flash steam and hot Woter which canbe recycled into the oiler. This Woter con be cooled by sending i through a Flash Economizer, which tokes the heat out of the confinuous blowdown and recycles it back into the makeup water. The drain temperature i reduced to 100-110°F. With Flash Economizer most ofthe heat is recycled back into the boiler. A Flash Econo- mizer saves more BTUs than a conventional heat exchanger. When a percentage ofthe continuous blowdown flashes into steam inthe upper portion ofthe Flash Economizes, you get 100% recovery ofthe BTUs in flash stream. Also, wit today’s cost of treating makeup water, you reclaim a percent cage ofthe blowdown water in flash sreom and put it back into your system. For more information ‘on these savings see Brochure F14.5. Steam Outlet ——» ‘dean ry steom 97% quality ‘to deaerator Tangential Inlet m imparts high velocity spinning action to liquid Low Pressure Vortex Aroq —»>- cxpedies instant flshing of all steam to out Stainless Steel Wear Plate 1 point of impingement provents exeson of separator wal High Velocity Centrifugal Action >| hives liquid and solids fo outside ~ | only clean dry seam releases into | central vortex area and up into Float Tre fai git for comnts dchage of cooled water to drain Spiral Coil Heat __ Sr signed fo provide maximum heat transfer Sludge Area. > 10 baie et ‘exchange oreo for to dopost and duo heat recovery efciency orto dog Cold Water boiler makeup entars sytem Cooled Blowdown to din (100-110°F) Boiler Make-up ‘exits heated by continuous blawdown at no extra cost Heat Recovery Process Continuous blowdown enters tangentially spinning around in the Flash Chamber. Flash steam is ro- leased in the canter area and recycled into the de- orator or feedwater heater. Every pound of flash steam returns 1156 BTUs into your system which, whon taken back to the deaerator or feedwater heater, is condensed. So you not only save BTUs but also make-up water. The remainder of the blowdown water flows directly down to the second area of recovery — the spiral coll heat exchanger. The hot water flows around the coils and heats the meke-up water which flows through the coils. The Penn Flash Economizer is designed for efficient trouble-tee operation. Note that the only area in which sludge can accumulate is below the heat transfer area, ‘and that there is no valve between the flash area and hat exchangor area to stick or clog. Maintenance is simple with the Flash Economizer. The unit is flanged to simply drop out the lower spiral col section, clean the copper or stainless coils, and place the unit back in operation without even having to shut the boiler down. This is recommended maintenance at least once «year. Single and Multiple Boilers Because the flash process is a natural process continu: cus blowdown from one boiler or multiple boilers, even operating at different pressures can be taken into ‘one Flash Economizer. They will each flash down to the pressure maintained in the deaerator set by the pressure reducing valve off of the main steam line. The pressure inside the economizer will be the same as in the deaerator or feedwater heater. —————— EE Design Features + Tangential inlet produces dean dry steam for the Decerator or Feedwoter Heater # 100% recovery of BTUs inthe Flesh Stage ‘© Redluces the amount of live stream needed for deaeration ‘© Stainless Steal Wear Plate in the Flash ‘rea to eliminate erosion ‘© Efficient Spiral Coil Heat Exchanger ‘© No intemal float valve to stick or clog + One unit can serve many boilers even if they are operating at different pressures + Maintenance is quick and easy Free Heat Recovery Survey Find out exactly how much you can save, by using the Pann Flash Economizer. We can save you important dollars, by recovering up to 90% ofthe heat normally ost with continuous Blowdown with the economizer. Thre is no obligation to you for geting the facts about Penn's Flash Economizer adapted to your boiler ‘operation. For a free copy of our Heat Rocovery Survey send us your name, title, ‘company ond address or telephone us ct BBBPENNSEP (736-6737) CO: emissions r by 833 tons/yr. O Reduction Equivalent to CO: processed by 333. (yr sod oh 0 Flash oa 7600 lb/hr Continous Blondown Sizing Chart Model Blowdown ‘Make-up. AAR 36m 96m wR 6 66M 16m R10 106M oem sR 20 206M 4m AAR 30 306M soon peng im aR 3.15 36m 156M Rs 630 66M so6en nwa 1050 106M soem AHR 20100 206M =——=—*1006™H ann 30150 306M «156M ion a coun | EE ssthoan giee ne Specification Print (cimensions ae in inches) ‘Model AB ¢ ob & F G6 4H An 3 % 44 2 Be 1 AHR 6 No 49) 50% Ye 8 MHRIO 935/45 Tek wiR20.==« 40s 6B (tk IA wR300°«172Ss7?s BAB BI wHRSIS = «97 EOWA’ AHRB63O 11158 Bd Ik BY AHRB 1050 106 «51 38k A AHRB 20-100 140 68 «= 60sdBCi‘i'? SD ARB 30-150 132'/2 67 ST'fe 2h fk 6B IAA Nozzle Schedule E. Continuous Blowdown Inlet. Condensate Drain F. Stam Vent H. Cold Water Inet and Outlet Penn Separator Corporation 0. Box 340. Boole, PA 15825 enn £14.849.7328 Fox 814.849.4510 Balen FE1008

You might also like