TASK

status_cod task_code task_name start_date end_date complete_pclndr_id wbs_id target_drt total_float est_wt
Activity St Activity I Activity N (*)Start (*)Finish (*)Activit Calendar WBS Original D (*)Total Fl (*)Est Wei
Completed A1000 Commencem 31/01/201 31/01/2011100 Standard 5 PROJECT:.1 0
Completed A1080 Excavation31/01/201 18/03/2011100 Standard 5 PROJECT:.70 56.4
Completed A1120 Backfillin 31/01/201 18/02/2011100 Standard 5 PROJECT:.15 25
Completed A1010 Submit & r01/02/201 28/02/2011100 Standard 5 PROJECT:.20 15.5
Completed A1090 Fixing wa 18/02/201 09/03/2011100 Standard 5 PROJECT:.21 10.6
Completed A1130 Preparing 21/02/201 01/04/2011100 Standard 5 PROJECT:.30 15
Completed A1020 Surveying 01/03/201 11/04/2011100 Standard 5 PROJECT:.30 50.5
Completed A1100 Hydrostatic21/03/201 22/04/2011100 Standard 5 PROJECT:.25 13
Completed A1140 Laying inte04/04/201 27/05/2011100 Standard 5 PROJECT:.40 60
Completed A1030 Trial trenc 12/04/201 16/05/2011100 Standard 5 PROJECT:.25 10
Completed A1110 Constructi 25/04/201 15/07/2011100 Standard 5 PROJECT:.60 10
Completed A1040 Prepare s 17/05/201 06/06/2011100 Standard 5 PROJECT:.15 10.6
Completed A1150 HandOver 30/05/201 30/05/201 100 Standard 5 PROJECT:.0 0
Completed A1050 Approval o07/06/201 08/07/2011100 Standard 5 PROJECT:.24 4
Completed A1060 Material su11/07/201 12/07/2011100 Standard 5 PROJECT:.2 12
Completed A1070 Approval o13/07/201 15/07/2011100 Standard 5 PROJECT:.3 7

Page 1
TASK

delete_record_flag
Delete This Row

Page 2
USERDATA

user_data
UserSettings Do Not Edit

Page 3