PART H — MISCELLANEOUS STRUCTURES
ITEM 609 - SPRIGGING
ITEM 609.1 DESCRIPTION
Planting of Sprigs in accordance with
this Specifications at locations shown on
the Plans or as required by the Engineer.
MATERIAL REQ'TS
609.21 SPRIGS
609.2.2 FERTILIZERS
603.2.3 GROUND LIMESTONE
Sore sa be
os
ay ag toms thatched
+ hansted without dh i —%
‘heloealty
60.2.4 TOPSOIL
‘The presence of wou rote
603.25 MULCH MATERIAL ‘iment a ef etn
~ FERTILIZERS 609.2.3 GROUND LIMESTONE
* Standard commence suid seston
+ Farha instandd conan wthname weet ond
Dry fre Roig teen water — fee spender
+ Grau or pale form lower aqusment
Ground limestone shall be:
+ Containing nt less than 85% calcium and
‘magnesium carbonates.
+ 100% passing theough a2.00mm seve
‘+ Notless than 35% pasing through 20.150 rm seve
Granulated slag may be substituted in eu of ground
limestone subject othe approval ofthe Engineer.3/1/2011
609.2.4~ TOPSOIL
‘Shall comply to ITEM 608, Topsoil
609.2.5 ~ MULCH MATERIAL
Mulch materials shall be hay, straw or other
non-toxic material
ITEM 609.3 ~ CONSTRUCTION REQ’TS
{609.3.1 HARVESTING SPRIGS
{609.3.2 ADVANCED PREPARATION AND CLEAN-UP
{609,3.3 TOPSOILING
{609.3.4 APPLYING FERTILIZER AND GROUND
UMESTONE
19.3.5 PLANTING SPRIGS
2.3.6 MULCHING AND COMPACTING
{602.3.7 MAITENANCE OF SPRIGGED AREAS
609.3.1 ~ HARVESTING SPRIGS
+ Enginer shat be noted last day before
harvesting
+ Grnesana woods shall be mowed
+ sprigs sallb gathered in winrows,wateredand kept
+ Sprig shallbe kept not ger than 24 hors
+ Damagedspis shal be deposed as cect,
609.3.2 ~ ADVANCE PREPARATION AND
CLEAN-UP,
‘Areas to be sprigged shall be raked or otherwise
cleared of stones larger than 50 mm in
diameter, sticks, stumps and other debris.
‘Any damage caused by grading shall be repaired
by the Contractor before the application of
fertilizer and ground limestone.
609.
—TOPSOILING
‘Shall eomply ITEM 608, Topsail
609.3.4 ~ APPLYING FERTILIZER and
GROUND LIMESTONE
‘Shall be unifermiy spread at rate shown on the PLAN
Shall be incorprated into tho solo depth of Som,
‘Onsteep slopes use power sprayer, blower equipment
‘rather approved method
609.3.5 — PLANTING SPRIGS
‘Shall not be done on a windy weather or when
‘round is untilable, excessively dry or wet
Methods:
Broadcast Sprigsing
Row Sprigging
Spot Spring609.3.6 ~ MULCHING AND COMPACTING
‘Shallbe done within 24s rom the time sprigsng is
completed.
609.3.7- MAINTENANCE OF SPRIGGED AREAS
Sprigged areas shall be protected with warning gas oF
arcade
Damaged areas shal be repaired.
Spriged areas shal ben satisfactory condition unt
final inspection and acceptance of work
609.4 ~ METHOD OF MEASUREMENT
‘Themumber of units of 100 square meters, measured
‘onthe ground surface, completed and acepted
609.5 — BASIS OF PAYMENT
Payment shall bein ful eommpensstion for mates
Tabor, equipment, tools and incidentals necesary to
complete the work excep topsciing
PART H ~ MISCELLANEOUS STRUCTURES
ITEM 610 - SODDING
610.1 - DESCRIPTION
Laying of Live Sod on designated locations,
‘onstruction of sod ditch checks, as shown on
the Plan or as ordered by the Engineer, alin
accordance with this Specifications.
610.2 — MATERIAL REQ”
+ wslengn otSont
+ fentjes tote applet
610.3 — COSTRUCTION REQ’TS
610.3.1 PREPARATION OF THE EARTH BED
610.3.2 PLACINGTHE SOD
610.33 STAKING THESOD
610.3.4 TOP DRESSING
610.3.5 WATERING60.3.1 ~ PREPARATION OF EARTH BED
‘Areasto be sodded shall:
* Conform to the required cross-section and
contour
+ Be free from stones, roots or undesirable
foreign materials
+ Be loosened toa depth of not less than 30,
610.3.2~ PLACING THE SOD
+ The earth bed shall be sufficiently moistened
tothe loosened depth.
+ The sod shall be placed within 24 hrs after it
has been cut
+ The sod on slopes shal be laid on horizontal
Strips beginning at he bottom working
upwards
+ Each sod strip shall be laid snugly against the
previous one.
610.3.3 - STAKING THE SOD
‘On slopes greater than 1 vertical to 4 horizontal,
sod shall be pegged with stakes 200-300 mm
in length,
‘Stakes shall be driven into the sod at right angles
tothe slope.
610.3.4—TOP DRESSING
‘The surface shall be cleared of unwanted
materials upon which a thin layer of topsoil
shall be scattered over the sod,
610.3.5 ~ WATERING
‘Sodded area shall be watered and maintained in
satisfactory concition for the duration of the
Contract until the final acceptance of the
work
610.4— METHOD OF MEASUREMENT
‘The quantity to be measured for payment shal
be the actual number of square meters of area,
‘on which sod has been placed,
610.5 — BASIS OF PAYMENT
Payment shall bein full compensation for
Preparing the earth bed, for furnishing,
placing taking, top dressing and watering the
Sod and for al labor, equipment, tools and
incidentals necessary to complete work