You are on page 1of 1
ELECTRICITY SERVICE COMMISSION U.P. Power Corporation Limited (An U.P. Govt. Undertaking) B-17, J-Road, Sector ‘C’ Mahanagar Extension., Lucknow cor -NDUM NO.2 TO ADVT, NO. 1-VSA/2011 FOR RECRUIT! ISTANT ENGINEER (TRAINEE) ‘Against the advertisement No, 1-VSA/2011 forthe recruitment of | Assi=A Engineer (Trainee) published in newspapers on 25.02.2011 and in Employment News of 26Feb.—O4March Poo raipsequent corrigendum published in News Papers, the following amendments ae incorporated. werne candidates appearing in final year examination in 2011 may also apply. However they have to submit a certificate from Head of the Institution regarding candidature of final year student with expected date of declaration of results along with ‘downloaded/manual etteation form. But atthe time of interview they have to submit copy of final yet ‘mark sheet aluagwith original Ifthe mark sheet is not submitted at the time of interview oF if the required saeragate marks of 60% by GeneralOBC and 55% marks by SCIST cateBor} are Ne secured Ta Mould not be allowed to appear in the interview. The online registration sie would remain doch upto 30.04.2011. The last date of receipt of application form by registered post shall be 07.05.2011. ‘Other Terms and conditions as advertised shall remain the same.” mM = “afta fee Ber are Note: do not print matter below the line. a ‘No.262 /ESC/I-VSA/201 /AE(T) dated 22-03-2011 fags tar anita gomegtemofire , HQT aa

You might also like