7.4
75
7.6
should have at least 10 years of experience and must be registered,
(vl) Environmentalist:
He/She must be 9 Registered with relevant Professional Board with
minimum a degree in Bsc./Environmental or an. equivolent
Qualification. He/She must have a minimum of ten (10). yeors
experience related to project of similar in nature and fluent in English
Language.
(vill Public Health Engineer (Water Supply, Sewerage
and Sewerage Management):
AA Public health Engineer should have at least a decree or equivalent
‘nm civil/public health or any relevant engineering discipline, with
Proven experience working in public health, water supply, waste
Water management and drainage.
(ull) Quantity Surveyor:
The Quantity Surveyor must be registered with @ professional boord
with @ minimum Bachelors degree in Quantity ‘Surveying or its
equivalent with at Teast 10 years experience including specific tn
working on master planning projects and must have a clear and
Concise communication skills in English, both orally and in writing.
DURATION OF ENGAGEMENT
‘The duration of the assignment is 4 months as stipulated in item ITC Clause
47.3 of the proposal data sheet (PDS) inclusive the mobilization of effective
date of the contract engagement and shall be deemed to have started on
execution of the Contract for consultency Services for detailed Review of the
Master Plan and shall terminate when the final report has been submitted
and accepted,
GENERAL OBLIGATIONS
‘The Consultant's remuneration shall be deemed to cover his ‘abilities, travel
Costs and support of his head office staff and all his obligations other then
additional services not covered by these terms of reference,
OBLIGATION OF THE CLIENT
MUHAS shall avail to the Consultant any available data and reports
Considered relevant for proper and timely execution of the project: However,
the consultant shall be fully responsible for the interpretation and use of the
‘materials in question,