SAUDI ELECTRICITY COMPANY ply gs Aga grad) As pil) G. Material test and test of the proposed underground power cables end-to-end 3.03 CIVIL WORK E, Lot: Grounding interconnections including supply of all_ grounding H. Testing and commissioning of proposed underground power cables end-to- 380/145kV BSP complete with Termination kits, XLPE to SF6 interfaces and all other accessories, Lot: Suitable Link Boxes in underground pits and Sheath Voltage limiters ratings as per Design calculations. The 380kV cables shall be cross bonded. The 380kV cables shall be checked for bonding configuration adequacy and sheath voltage limiter, which shall be provided. The CONTRACTOR shall furnish calculations for COMPANY review/approval. Link box arrangements shall be provided for 380kV system cables. CONTRACTOR shall furnish sheath isolation arrangement at one end of the sheath. materials and provide grounding as per TES-P-104.08 Rev.0 6 channel Distributed Temperature Sensor System complete with HMl based Control Panel, Sensors, 4 core Fiber optic cable per phase monitoring, Heat Tracing cables and all other accessories for a complete system. DTS shall have self checking facility for the system. Spare contacts shall be provided for LD ie. supplies system fiber failure, One printer shall be provided atona wip DTS system. The DTS system shall be integrated with SAS, and documentation of the results. end between New Al-Fardous 380/230/115kV BSP and the existing Al- Dhahlyah 380/115kV BSP and documentation of the results. All required WORK, materials, tools and accessories to perform this testing and commissioning shall be provided and performed by the CONTRACTOR Gassing & degassing of related GIS at New Al-Fardous 380/230/115kV BSP. and Al-Dhahiyah 380/115kV BSP for connecting and testing of cables and documentation for the above mentioned work. Gassing & degassing work including Electrical Tests is the CONTRACTOR'S responsibility but it should be carried out by the GIS manufacturer or as approved by SEC. For Civil and Structural work Refer Appendix-VIll 3.04 JECT DESIGN DOCUME! CULATIONS. RAWINGS, A, The CONTRACTOR shall submit all design documents, calculations, studies and drawings at various stages of the PROJECT as per Table 3.01, as a minimum. [PTS-10EC323, TMG/TPV 20-11-2010), faxtesaas "une cerned avo onTED FSO. ISCOPE OF WORK/TECHNICAL SPECIFICATIONS FOR JAL-DHAHIVAH. }S80kV UG CABLE WORK DAMMAM P TO NEW AL-FARDOUS BSP ‘SAUDI ARABIA

You might also like