G. Material test and test of the proposed underground power cables end-to-end
3.03 CIVIL WORK
E, Lot: Grounding interconnections including supply of all_ grounding
H. Testing and commissioning of proposed underground power cables end-to-
380/145kV BSP complete with Termination kits, XLPE to SF6 interfaces and
all other accessories,
Lot: Suitable Link Boxes in underground pits and Sheath Voltage limiters
ratings as per Design calculations.
The 380kV cables shall be cross bonded. The 380kV cables shall be
checked for bonding configuration adequacy and sheath voltage limiter,
which shall be provided. The CONTRACTOR shall furnish calculations for
COMPANY review/approval. Link box arrangements shall be provided for
380kV system cables. CONTRACTOR shall furnish sheath isolation
arrangement at one end of the sheath.
materials and provide grounding as per TES-P-104.08 Rev.0
6 channel Distributed Temperature Sensor System complete with HMl based
Control Panel, Sensors, 4 core Fiber optic cable per phase monitoring, Heat
Tracing cables and all other accessories for a complete system. DTS shall
have self checking facility for the system. Spare contacts shall be provided for
LD ie. supplies system fiber failure, One printer shall be provided atona wip
DTS system. The DTS system shall be integrated with SAS,
and documentation of the results.
end between New Al-Fardous 380/230/115kV BSP and the existing Al-
Dhahlyah 380/115kV BSP and documentation of the results. All required
WORK, materials, tools and accessories to perform this testing and
commissioning shall be provided and performed by the CONTRACTOR
Gassing & degassing of related GIS at New Al-Fardous 380/230/115kV BSP.
and Al-Dhahiyah 380/115kV BSP for connecting and testing of cables and
documentation for the above mentioned work. Gassing & degassing work
including Electrical Tests is the CONTRACTOR'S responsibility but it should
be carried out by the GIS manufacturer or as approved by SEC.
For Civil and Structural work Refer Appendix-VIll
3.04
JECT DESIGN DOCUME! CULATIONS. RAWINGS,
A, The CONTRACTOR shall submit all design documents, calculations, studies
and drawings at various stages of the PROJECT as per Table 3.01, as a
minimum.
[PTS-10EC323, TMG/TPV 20-11-2010),
faxtesaas "une
cerned avo onTED
FSO.
ISCOPE OF WORK/TECHNICAL SPECIFICATIONS FOR
JAL-DHAHIVAH.
}S80kV UG CABLE WORK
DAMMAM
P TO NEW AL-FARDOUS BSP