You are on page 1of 2

FOR CAINGIN, BOCAUE, BULACAN

NO. OF
STREET
POSTS
NEEDED

MAIN ROADS

ESTIMATED COST BASED


ON THE TOTAL NO. OF
STREET SIGNS NEEDED
Ph 9,446.28

ESTIMATED COST
BASED ON THE
TOTAL NO. OF
STREET SIGNS
NEEDED
Ph 12,223.51

(BY CONTRACT)

(BY ADMIN.)

ZONE
(SECTION)

9,446.28

12,223.51

9,446.28

12,223.51

18,892.56

24,447.02

18,892.56

24,447.02

18,892.56

24,447.02

18,892.56

24,447.02

TOTAL

10

TOTAL NO.
OF SIDESTREETS
(PRIVATE
ROADS)

ROAD
NO.

NO. OF
STREET
POSTS
NEEDED

Ph

94,462.80

ESTIMATED COST
BASED ON THE TOTAL
NO. OF STREET SIGNS
NEEDED
Ph9,446.28/ST.SIGN
(BY CONTRACT)

Ph 9,446.28

Ph 12,223.51/ST.SIGN
(BY ADMIN.)

12,223.51

9,446.28

9,446.28
18,892.56

24,447.02
12,223.51

9,446.28

9,446.28

ESTIMATED COST BASED


ON THE TOTAL NO. OF
STREET SIGNS NEEDED

18,892.56
9,446.28

Ph122,235.10

12,223.51

12,223.51

12,223.51
37,785.12

12,223.51
24,447.02

48,894.04

TOTAL

9,446.28

12,223.51

9,446.28

12,223.51

18,892.56

24,447.02

10

11

18,892.56

24,447.02

12

9,446.28

12,223.51

13

9,446.28

12,223.51

14

9,446.28

12,223.51

15

9,446.28

12,223.51

16

9,446.28

12,223.51

17

18

18,892.56

24,447.02

19

9,446.28

12,223.51

20

9,446.28

12,223.51

21

9,446.28

12,223.51

22

23

23

NO. OF POSTS NEEDED


FOR THE MAIN ROADS:
NO. OF POSTS NEEDED
FOR THE SIDE STREETS:
TOTAL NO.OF STREET
POSTS NEEDED:
TOTAL PROJECT
ESTIMATED COST:

9,446.28

9,446.28

9,446.28

85,016.52

75,570.24

28,338.84

9,446.28

110,011.59

12,223.51

12,223.51

36,670.53

Ph 330,034.77

10

Ph

94,462.80

Ph 122,235.10

27

Ph 255,049.56

Ph 330,034.77

37 UNITS
Ph 349,512.36

97,788.08

12,223.51

Ph 255,049.56

27

12,223.51

Ph 452,269.87

You might also like