Bottom up makes (or lag) is the amount. Of strokes it takes to move drill bit cuttings to the surface of the weU bore. Bottom up lag is calculated by multiplying the "hole capacity" for each section (different inside diameter) of riser, cased hole and open hole, and multiply that by.0009714263.