Aprendix
Aprendix
Date 06/07/09 07/07/09 08/07/09 Site Central jdeide Dora,twin tower Dora,twin tower Justice (adlieh) Marjaayoun Merwaniye Problem Power cabling Configuration SRA4 Configuration SRA4 Engineer Mohammad khodr Khalil antoun Khalil antoun
09/07/09 10/07/09
Adding a new link Adding a new route Add MSI. Add GPROC3 Installation IDU+ODU Bsc shutdown Acceptance Installing and configuring the eclipse IDU Assembling ODU Installing BSC & LX cabinet DRI code load failure.changing the DRI Configuring the IDU All antennas termination Installation of the ODU + cabling termination BSC interconnection by fiber optics power Cell implementation No access to the indoor unit of the harris from OMC Configuring the link facing zouk
17/07/09
Fatqa
Khalil Antoun
20/07/09
Aabra
Kamal
29/07/09
Fatqa
Khalil antoun