Site visits by chronological order

Date 06/07/09 07/07/09 08/07/09 Site Central jdeide Dora,twin tower Dora,twin tower Justice (adlieh) Marjaayoun Merwaniye Problem Power cabling Configuration SRA4 Configuration SRA4 Engineer Mohammad khodr Khalil antoun Khalil antoun

09/07/09 10/07/09

Adding a new link Adding a new route Add MSI. Add GPROC3 Installation IDU+ODU Bsc shutdown Acceptance Installing and configuring the eclipse IDU Assembling ODU Installing BSC & LX cabinet DRI code load failure.changing the DRI Configuring the IDU All antennas termination Installation of the ODU + cabling termination BSC interconnection by fiber optics power Cell implementation No access to the indoor unit of the harris from OMC Configuring the link facing zouk

Edward kafrouni Walid dahdouh

13/07/09 14/07/09 15/07/09 16/07/09

Bakhoun Zahle Bakhoun Casino liban

Khalil antoun Rabih rammal Elie lahoud Khalil Antoun

17/07/09

Fatqa

Khalil Antoun

20/07/09

Aabra

Kamal

21/07/09 22/07/09 23/07/09

Bkerki Fatqa Zouk MPT

Elie khoury Khalil Antoun Khalil Antoun

24/07/09 27/07/09 28/07/09

Fatqa Haykal hospital Trans orient bank

Edward kafrouni Dany seaman kamal

29/07/09

Fatqa

Khalil antoun

Site visits by chronological order


30/07/09 Hermel 31/07/09 03/08/09 04/08/09 Nahr el kaleb Al kaa Borj hammoud Installation and configuration of the eclipse modem Internal interference of the DRI Adjusting the GSM antennas direction Changing one of the three GR-40 in the rectifier Upgrading the configuration from 3,3,3 to 3,4,3 Configuration the link facing mansourieh Elie khoury kamal Edward kafrouni Kamal

05/08/09 06/08/09 07/08/09

Hazmieh Bir aabed

Dani seaman Elie lahoud