Suppose that we only have TOR (Term of reference) from user ` The project can be held by multi aspect,

such as : civil engineering, mechanical engineering, electrical engineering and so on.


`

Please explain the steps for starting the project and planning the project? ` How to create a work schedule, man power schedule? ` How about predecessor especially for electrical aspect? Please give advice to create work and manpower schedule that consist of multi aspect of working ` How can we assume the project cost, and how about the salary of each person? Can we use only standard salary from labor associates?
`

Please give advice for starting a new project. ` Is there any standard for project management?
`

What is the difference from FEED (Front End Engineering Design) and DED (Detailed Engineering Design) especially for electrical aspect. Is that any standard that explain the limitation of each phase of design?