LOAD GROWTH ASSESSMENT

GENERAL PLAN OF THE NETWORK

IS REINFORCEMENT REQUIRED?

NO

YES
IS A NEW SUBSTATION REQUIRED? CONSIDER OTHER MEANS OF REINFORCEMENT

NO

TECHNICAL, ENVIRONMENTAL AND COMMERCIAL POLICY

YES
PREPARE PRELIMINARY PLANS

GENERAL LOCATION, LINE DIRECTIONS, SOIL INVESTIGATIONS, TRANSPORT ROUTES END

GENERAL DESIGN

DETERMINE SITE LOCATION

DETERMINE SPECIFIC DESIGN EXACT SITE LOCATION AND ORIENTATION

PREPARE MAIN CONNECTIONS AND PROTECTION DIAGRAM

DETERMINE SUBSTATION LAYOUT

PREPARE CIRCUIT DIAGRAMS AND SOFTWARE

CARRY OUT CIVIL DESIGN WORK

PREPARE WIRING DIAGRAMS AND CABLE SCHEDULE

END CIVIL WORKS

INSTALL PLANT AND EQUIPMENT

TEST, COMMISSION, AND TAKEOVER