TIME SCHEDULE OF 10KV JUNCTION BOX RELOCATION FOR SHUNLO B PMS 2011 NO DESCRIPTION PARTICIPANT PT.

PLN UPJ BANGSRI PIC WORK DESCRIPTION DATE

COMPARE THAT ACTUAL CONDITION COMPLY TO 5 JULY 2011 REFFERENCE DRAWING PT. PLN PEMBANGKITAN TJB ABU MUSLIM WITNESSED EXPLAIN TO VENDOR RELATED PT. APOL DWI YULIANTO TO MODIFICATION WORKS APPLY PTW TO CCR FOR SAFETY 2 PTW APPLIED 27 JULY 2011 GUARANTEED 3 RELOCATION PROGRESS #ISOLATING ALL MAIN BREAKER FOR BOTH SHIPS UNLOADER SUPPLY AT JETTY ELECTRICAL HOUSE # Enclosures inspection for indoor or outdoor use offering a degree of protection to the interior equipment against solid foreign objects (falling dirt and -START 3 AUGUST 2011 windblown dust) and water ingress, and the enclosure will be undamaged by external . To be check or replaced the gasketed, electrical or junction boxes, termination cabinets. #RELOCATING JUNCTION BOX AS NEEDED -FINISH COMMISSIONING 4 AUGUST 2011 3 COMPLETION/ DELIVERY 1 SITE VISIT SURVEYS NOTE: - THAT SCHEDULE WILL BE IMPLEMENTED IN WINDOW TIME - ALL RELATED WORKS SCOOPE SHOULD BE COMPLY TO IEC STANDARD TANJUNG JATI B, 27 MAY 2011

PREPARED BY,

REVIEWED BY,

APPROVED BY

ACKNOWLEDGED BY,

DWI YULIANTO CHIEF ELECTRICIAN

M. RONDHI MAINTENANCE SUPERINTENDENT

BAGUS JAYA USAHA JETTY MANAGER

ABU MUSLIM

PLN (PERSERO) PEMBANGKITA

REMARKS

4 AUGUST 2011 8 AUGUST 2011

ACKNOWLEDGED BY,

ABU MUSLIM
PLN (PERSERO) PEMBANGKITAN TANJUNG JATI B