Duration(Beta Distribution) Activity optimistic most prob.

Pessimistic A 5 6 7 B 5 12 13 C 6 8 10 D 4 10 10 E 5 6 13 F 7 7 10 G 4 7 10

Avg Time 6 11 8 9 7 7.5 7

Predecessors

A A C B,D E,F

FROWARD PASS Earliest strt time (Est) 0 0 6 6 14 15 22.5

Activity optimistic A 5 B 5 C 6 D 4 E F G 5 7 4

most prob. 6 12 8 10 6 7 7

Pessimistic 7 13 10 10 13 10 10

Avg Time Variance Variance (critical Path) 2.361111111 6 0.111111111 11 1.777777778 8 0.444444444 9 1 7 7.5 7 1.777777778 0.25 1

ROWARD PASS Earliest finish time (Eft) 6 11 14 15 21 22.5 29.5 Successors C,D F E F G G

Backward Pass Latest finish time (lft) 6 15 15.5 15 22.5 22.5 29.5

Decision Latest start time (Lst) 0 4 7.5 6 15.5 15 22.5 Slack 0 4 1.5 0 1.5 0 0

Std deviation (critical path) 1.536590743

CRITICAL PATH
SLACK TIME OF C PROJECT COMPLETION TIME VARIANCE

A--D--F--G 1.5 DAYS 29.5 2.3611

Decision Critical Path Yes

Yes Yes Yes

ACTIVITY A B C D E F G H

DURATION 6 8 12 4 6 15 12 8

PREDECESSORS

A,B C C D,E E F,G

FORWARD PASS EARLIEST START TIME 0 0 8 20 20 26 26 41

CRITICAL PATH=B-C-E-F-H EXPECTED COMPLETION TIME=49 DAYS

WARD PASS

BACKWARD PASS DECISIONS EARLIEST FINISH TIME SUCCESSOR LATEST FINISH TIME LATEST START TIME SLACK CRITICAL PATH 6C 8 2 2 8C 8 0 0 YES 20 D,E 20 8 0 YES 24 F 26 22 2 26 F,G 26 20 0 YES 41 H 41 26 0 YES 38 H 41 29 3 49 49 41 0 YES