You are on page 1of 2

CONTENTS

PAGE NO. CANDIDATES DECLARTION ACKNOWLDGEMENT CERTIFICATE ABSTRACT LIST OF ACRONYMS

CHAPTER 1.1 Introduction about Company 2.1 Objective of the Project 2.2 Scope of the Project 2.3 SDLC Approach 3.1 Requirement Analysis 3.2 Software Requirements Specification 3.3 Functional Requirements of the Project 3.4 Technologies Required 4.1 Database Design 4.2 Database Fields Specification 5.1 Software Design 5.2 High Level/Detailed Design (HD/DD) 5.3 Design Components 6.1 Testing 6.2 Test-Plan (TP) 7.1 Snapshots

6 7 7 9 9 9 10 10 11 11 12 12 12 14 14 18

It have a facility of offline system. It doest not need internet because we just use one shared drive to all computer using Internet information system (IIS) even in windows 2000 or windows server. We can use it even to practice programming in web base application. Its code and project designation is divided into modules so we can use its modules in our various projects for reusability. But, do not confuse that we have implemented visual basic 6.0, here just we have achieve the module wise programming and central programming only.

You might also like