DESIGN OUTLINE
Smith Unit 1
East Kentucky Power Cooperative
Smith Station
Trapp, Kentucky
April 2007
Stanley Consultants ine.
AS Gp cong
inom Conran Ses WoreDesign Outline
Smith Unit 1
East Kentucky Power Cooperative
Winchester, Kentucky
April 2007
Stanley Consultants nc
mFTABLE OF CONTE)
1. INTRODUCTION.
IL GENERAL DESIGN FACTORS.
‘A. Location:
B. Plant Development:
C. Design Criteria:
D. Cycle Auxiliaries:
E, Kentucky River Data (Lock 10):
F.
G
H
"Plant Conditions:
. Permitting:
Codes Covering Work...
1. Testing: wn
I, MECHANICAL.
A. Steam Generating Unit (Supply and Install by Contract 201):
B. Turbine-Generator Unit (Supply and Install M5 Contract 1).
C. Start-up Bypass System:
D. Alloy Piping? nme
E. Boiler Feedwater Systems:.
F. Condensate System.
G. Circulating Water System:
H, Fuel System:.. :
1. Coal Handling (Contract 211):.
J. Limestone System:
K. Flue Gas System...
L
M.
N.
0.
P.
Q.
R
‘Combustion Air Syste
Ash System sn
Extractions Steam System (Supply and Install by Contract 281): : ee
Boiler Cycle Water Makeup and Overflow System (Supply and Install by Contract 281 0 26
Service Water System (Supply and Install by Contract 281):
Clarified Water System?......
Closed Cooling Water System (Supply and Install by Contract 281):
S. Fire Protection Water System:
T. Air System (Supply and Install by Contract 281):
U, Turbine Lubricating Oil System (Supply and Install by Contract 281):
V. Generator Hyerogen and Carbon Diosde Systems (Supply and Isl by Conrat 281)
W Potable Water System:
X. Plant Waste and Effluent System (Supply and Install by Contract 281):
Y.. Equipment Erection:
Z. Bridge Crane (Supply by Contract 82):
AA. Balance of Plant (Contract 281):
BB. System Cleaning:
IV, ELECTRICAL.
A. Plant Electrical System:
B. Plant Voltages:
C. Motors and Control:
D, Generator (Contract 1):..
E, Large Power Transformers (Contract 131A):
F. Medium Power Transformers (Contract 13 1B):
G. Distribution Transformers: (Contact 131C}
H. Grounding Resistors:. a
laxmesj18500-DesignOutine doe i Stanley Constante