Project Name

PREPOUR INSPECTION REPORT

Doe.Nq. : EXEf F f 86 Rev.No. : 00 DATE : 0{.08.2007

: Post tensioning of slab AT

Reference Drawing No. . Pour No. / Floor No. / Slab No.

'

Nlgo-, Putv9fqp''X1 il"U , 31^e4&i


lnn t -L LbP-li - l u;no . - r -t3, Dw'14. t{ zYn/ -o5f ot.

He.'*e>

' tf'

-_u3 Psur.e ,4-fel"-- o 4


SlNo. I

ACTIVITIES tsottom Shuttering Layrng & Leveling Profile marking Bottom Reinforcement Lyrng &'lling
Fixing of end anchorages Placing of sheathing Ducts Threading of strands

OBSERVATIONS
Yes / No Yes / No Yes / No Yes / No Yqs / No

REMARKS

\.r
^lu
Ve.l
\pA

2
3
4 5

Yea

5 ,7 8 I 10
11

Yes y' No
Yes / No Yes / No Yes / No

Yea

Placing of chairs for drrcts Fixing of dead end anchors Frofiling of Tendons
Taping of Sheathing ducts Placing of Grout vents

1u

1c.a
Ys>

Yes / No Yes / No Yes / No Yes / No

Yw
Yea
\eo
\eu

L2

Grip length checking Final Alignment of Tendons

13

Approved / Not approved for concreting

A*ro

Gnk A^.*
Consultant: Signature: Name:

If Not Approved (Reasons for not approving):

Client: Signature: Name: Designation:

': contractolbKC fJ?.

lffi"@
- ?"1.-lilf
NAME

Sub Contractor: Signature: " Name: Designation:

PREPARED BY

APPROVED BY

NAME

Page I of3