11C250-B21 - Inspection & Test Plan
11C250-B21 - Inspection & Test Plan
BARTEC Pte Ltd No. 63 Hillview Ave #07-20/21 Lam Soon Ind. Bldg. Singapore 669569 Tel: +65 6762 5030 Fax: +65 6762 5031 E-mail: info@bartecasia.com Webpage: www.bartecasia.com
Manufacturer : BARTEC Pte Ltd P.O. No.: PO#10973 MTT ITP No. : 11C250 - ITP
Verifying Doc. Inspection Requirements Manufacturer Client Owner R R
PTSC
Signature
HEATING CABLE 2.1 Heat Tracing Cable Factory Acceptance Test F BARTEC Germany Test Report R R
POWER DISTRIBUTION & CONTROL PANEL 3.1 Functional Test I BARTEC Singapore
C05 - FAT Procedure
VDRL & FINAL INSPECTION 4 Vendor Document Submission Final Inspection I Heat Tracing System VDRL R R R
and pre-shipment I
I
NIL
Release Note
Dispatch
NIL
7
** Legend :
Final document
I = IN-HOUSE R = REVIEW H = HOLD W = WITNESS F = FACTORY