Professional Documents
Culture Documents
8
7.32
7
6
5.41
5
3 TAKT 3.63
0
OBSERV. # 1 OBSERV. # 2
New / Revison ________ Page _______ of _______ Date _____________ Standard Work Combination Sheet
Organization Work Center Supervisor Operator Product Line Part Number Part Name
1 0 0
2 0 0.0
3 0 0.0
4 0 0.0
5 0 0.0
6 0 0.0
7 0 0.0
8 0 0.0
9 0 0.0
10 0 0.0
11 0 0.0
12 0 0.0
13 0 0.0
14 0 0.0
15 0 0.0
16 0 0.0
17 0 0.0
18 0 0.0
19 0 0.0
20 0 0.0
Notes:
Password: stdwork VA NVA % VA Secs. format shall be in "hh:mm:ss" + "a/p". i.e. 6:30:25 p
(1 sheet per person) TOTALS: 0 0 #DIV/0! Mins. & Hrs. format shall be in "hh:mm" + "a/p".
Days format shall be in base numerical format
Induct
Part STORAGE
GOOD
Evaluation CLEANING Component MACHINE METAL
SHOP Assembly BAD SHOP SPRAY
PLATING Component
NDT Shop CLEANING
SHOP Assembly
SHOP
Finished
Typical Part Flow Product
BEFORE RIE
Total Distance 2376 ft.
(0.45 miles)
AFTER RIE
14.00
11.43
12.00 10.87
10.05
10.00
7.20
Tim e (m in) 8.00
6.00
4.48 3.50
4.00
2.42
2.00
0.00
CV In Op Pa Pr Pr Tr Tr
A sp er pe ep ep an an
ec ati rw er er sp sp
tio on or at at or ta or
n k ion ion tat
(S t ion io
an n
d (S
Bl an
as d
tin Bl
g) as
tin
g)
Category
PTO Observation #1
64.28
70.0
60.0
50.0
35.02
40.0
16.03
20.0 13.23
24.94%
20.59%
10.0
0.0
NVA NVAN VA TOTAL TIME (MIN)
Type of Steps
Parts Pallet
6.4%
Work Station
39.6%
PSA Table
14.5%
Special Tools
6.1%
Aircraft
21.5%
PAPERWORK
SET UP 17.7% CLEAN 6.1%
5.5%
Aircraft 40.1%
Aircraft 77.1%
WASTE
Chemicals 2.5%
21.5% Aircraft
1.8% Searching
82.5% Confer & Assist
INSPECTION
OTHER 4.6 % TRAVEL 27.2%
22.5%
4.000
VA mapping Chart 3.63
3.500
3.000
2.500
1.500
1.000
0.83 0.75
0.500 0.33
0.25 0.25
0.12 0.080.050.17 0.12 0.05
0.17
0.03 0.08 0.07 0.08
0.07 0.020.020.02 0.020.020.05
0.000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Process Steps
• Delivery
• Located @ point-of-use (POU)
• Issued to mechanic
• Returned empty for refill
• Contents
• Everything required for Job
• In the quantities needed
• Presentation
• In the sequence used
• Cart, container, bins, etc.
• Kit design:
• Perform work right to left
• Visually signal job status
• Color code all labels
• Mistake proofing
Left:
Finished
Parts
Present-
ation
Assy Tools
E&E Tools