Lampiran Komissioning PLTM
Lampiran Komissioning PLTM
MEKANIKAL PEMBANGKIT TURBINE Runner Excentricity Runner clearence Cassing water Pas Shaft water pas Fly wheel excentricity GOVERNOOR Equipment sequence chek Pump motor operation chek Safety chek Relation between servomotor stroke and guide vane opening COOLING SISTIM SET Sequence Chek Leakage Chek Strainner operation Pressure setting
BUTTERFLY VALVE Sequence chek and Equipment Leakage chek Operation Chek Safety chek BRAKE SET Equipment sequence chek Operation Chek GENERATOR Measurement of winding resistence Measurement of insulation resistence of generator winding EXITING SYSTEM Operation chek of field Circuit Breaker Characteristic of AVR Operation chek of Protective Relay
TRANSFORMERS Measurement on All Tape Chek of polariyy and fhase relationship Measurement of winding resistanse Measurement df insulaton resistance Calibration of dial thermometers Operation chek of protective relay and switches CIRCUIT BREAKERS Closing and opening operation Test Trip free operation Test Manual operation Test Measurement of tnsulation resistanse Chek of minimumcoil operation voltage
CT & PT Measurement of insulation resistanse Polarity chek CONTROL & RELAY BOARD Squensial operation Test Operation chek and seting on protective relay Measurement of insulation resistanse STORAGE BATTERIES Measurement of voltage and temperature of all cell before and after initial Measurement of voltage and temperature of pilot cell during initial charge POWER CABLE Measurement of insulation resistanse Hipot DC 70kV EARTHING SYSTEM Measurement of earthing resistanse