MONTHLY RETURN OF STATUS OF 18 NOS LIFT AT HYDERABAD ESTATE NEPEAN SEA ROAD MUMBAI

MONTH-MAY-2005 DIVISION:MCED-I
Sl No Name of the building No of Make Lift ID Number Normal Duration Duration of Failure of Lift Duration Reason For Break Down
Floor of Operation For Which Service
Served Was
Unavailable
From To Date From To
1 HYD.ESTATE-A G+8 OTIS ED-I-HY-E-A-O-I 24 hrs NIL
2 HYD.ESTATE-A G+8 OTIS ED-I-HY-E-A-O-II 24 hrs NIL
3 HYD.ESTATE-B G+8 OTIS ED-I-HY-E-B-0-I 24 hrs NIL
4 HYD.ESTATE-B G+8 OTIS ED-I-HY-E-B-0-II 24 hrs NIL
5 HYD.ESTATE-C G+8 OTIS ED-I-HY-E-C-O-I 24 hrs 5-5-505 7.0P.M 9.0 P.M 2.0 hrs Door not opening at any floor.
6 HYD.ESTATE-C G+8 OTIS ED-I-HY-E-C-O-II 24 hrs NIL
7 HYD.ESTATE-D G+6 OTIS ED-I-HY-E-D-O-I 24 hrs NIL
8 HYD.ESTATE-D G+6 OTIS ED-I-HY-E-D-O-II 24 hrs NIL
9 HYD.ESTATE-E G+6 OTIS ED-I-HY-E-E-O-I 24 hrs NIL
10 HYD.ESTATE-E G+6 OTIS ED-I-HY-E-E-O-II 24 hrs NIL
11 HYD.ESTATE-F G+12 OTIS ED-I-HY-E-F-O-I 24 hrs NIL
12 HYD.ESTATE-F G+12 OTIS ED-I-HY-E-F-O-II 24 hrs NIL
13 HYD.ESTATE-G G+12 OTIS ED-I-HY-E-G-O-I 24 hrs NIL
14 HYD.ESTATE-G G+12 OTIS ED-I-HY-E-G-O-II 24 hrs NIL
15 HYD.ESTATE-H G+14 B.BJLEE ED-I-HY-E-H-B-I 24 hrs 23-5-05 12.0noon 3.0 P.M 3.0 hrs 9th floor landing door spring replaced.
28-5-05 10.0 A.M 1.30 P.M 3.5 HRS 12th floor door problem and adjusted.
16 HYD.ESTATE-H G+14 B.BJLEE ED-I-HY-E-H-B-II 24 hrs NIL
17 HYD.ESTATE-APT G+12 OTIS EDI-HY-E-APT-O-I 24 hrs NIL
18 HYD.ESTATE-APT G+12 OTIS EDI-HY-E-APT-OII 24 hrs NIL