Statement Showing Material For Various Items
Statement Showing Material For Various Items
CEMENT POINTING (100 SFT). RATIO 1:2 1:3 1:4 1:5 1:6 CEMENT 0.60 0.45 0.36 0.30 0.20 TILED ROOFING (100 SFT). CEMENT 1.3 SAND 8.0 LIME 0.4 TILES 200 SAND 1.50 1.70 1.80 1.95 2.10
PAINTING IRON WORK. Quantity in 1 CWT (Area Covered 2500 New Surface 2000 Old Surface). COALTAR MINERAL SLARED KEROSIN OIL FUEL WOOD PITCH LIME KHANKI MIXTURE 3/4CWT 10 L B S 9LBS 8LBS 1.5 M D S AT
BITUMASTIC SOLUTION (100 S F T). PARTICULARS 1 COAT BITUMASTIC SOLUTION 2ND Coat BITUMASTIC SOLUTION
ST
PAINT
4 LBS
PAINT
3 LBS 2 LBS 2 LBS