9/6/2011 Resource Person BRIAN O'SULLIVAN Servive Engineer, NOSA Power Switchgear briano@nojapower.com.au olegs@nojapower.com.au www.nojapower.com.

au

Offline setting Click transient setting Phase overcurrent Go for SST,OC1+, OC2+, OC3+ and tick for how many times the breaker should reclose SST+ click on 1 OC1+ RRL OC2+ OC3+ L means lock out 1+ Curve IECI 50 0.05 1.0 0.00 5.00 120 0.00 0.05 2+ Curve TD 300 0.5 5.0 1.00 0.00 1.00 120.00 0.00 1.00

3+ 1000 0.1 0.05 To compare two graph Go for settings on forward power and reverse power Both the graph comes on the screen

How to upload updates from USB Make a folder as RC10 and keep all the updates in that folder Put the usb in the control cubicle

Higher the altitude higher the BIL rating. External Load time- time given for the external load like modem to run after the ac power goes off, so that we can retain the charge of the battery. Baud rate for GSM mobile is 9600