You are on page 1of 245
INSTRUCTION HULL NOs at MANUAL ee mal a Maslsst=]0) aa Lal el ams 0 NE] )bo ia Ne) yf 7 = Tat} DESIGN CRITERIA GENERAL INFORMATION FAULT FINDING PROCEDURES MAINTENANCE PROCEDURES OPERATING INSTRUCTIONS TECHNICAL DESCRIPTION INSTALLATION AND. TEST PROCEDURES DRAWINGS AND DATA SHEETS CERTIFICATES AND INSPECTION CHARTS U Nn ITO R DESIGN CRITERIA 11265 50001 E ies [Dawarisae Re Wan ae oo Fae PBU —_|25.04.2001 |0 25.04.2001 |JKU Page 1 of 1 Seen a ae ra CO2 HP GDYNIA SHIPYARD HULL B-8228/1-7 _ |NEP.0286-0292 ‘The CO2 H.P. Fire Extinguishing System is calculated in accordance with the following requirements: ‘Quantity of CO2: = Quantity of free carbon dioxide (CO2) calculated at 0.56 M/Kg, - Mixing ratio of carbon dioxide (CO2) based on the volume protected space as follows: A) Gross volume of machinery space incl. casing = 35% B) Gross volume of machinery space excl. casing = 40% Select the largest figure from A) and B) ©) Gross volume of cargo spaces (largest only) = 30% D) Gross volume of cargo spaces containing motor vehicles with fuel in their tanks inel cargo spaces on ro/ro vessels = 45% Gross Volume x Mixing Ratio - ss = QTY OF CO; 100 x MYKG (0.56) Name of space Gross volume] Qty of CO: | Nos. of | Size of M Kg __| cylinders | cylinders Main System: Engine room (35%) 9615 6009 134 a5 Kg ‘Engine room (40%) 8814.5 6296 140, s5Kg [Hold no 1 (45%) 31317 25165 36 45 Kg |Hold no 2 (30%) 4604.7 2466.8 55 45 Kg Hold no 3 (30%) 5710.7 30593 68 a5 Kg [Hold no 4 (30%) 57107 30593 68 45 Kg Hold no 5 (30%) = 3710.7 3059.3 6 45 Kg Hold no 6 (30%) 37107 3059.3 68 45 Kg Hold no 7 (30%) 57107 3059.3 68 45 Kg Hold no 8 (30%) 37107 3059.3 68 45 Kg [Hold no 9 (30%) 5710.7 3059.3 68 45 Ke Hold no 10 (30%) F912 2243.3 30 a5 Ky Local Systems: Paint loc 6l 43.6 1 45 Ky Scavenge air space N/A. 39 I 45 Kg Galley exhaust duct 2s | 2.0 i 8.9 Ke i projeci\ QUOT FIRE, RESCUE & SAFETVS0_CoDPOLANDIGDYNIB_S228_1-T\Cale col €228_1-7

You might also like