Final Report For Generator Alignment Fixture (GSI-267 To 456)

You might also like

You are on page 1of 6
Dew FINAL DOCUMENTATION sé Date F1J8:2007-10-15 Description iii]: GENERATOR ALIGNMENT FIXTURE Production Sr. No 7123 : GSI-50002257-267 to 456 Drg No Fl 44'S :1250.09.01.07 Rev.01 Tech Spec I. 2is804 :$1250/021 Rev 00 QAP No HitR ICES S: $1250/021 Rev 00 P.O. : RMC/WTG/07-08/0212 ‘Supplier #ilfE) 3: GST Customer 2" : SUZLON ENERGY LTD. Inspection Agency #3¢"#4%% : SUZLON ENERGY LTD. INDEX JF Title of Report #24 Remark ### Material Test Certificate CIE 15- Impact Test Certificate pti aeiit- Raw Material UT Report BREED: Dimensional Inspection Repo Rotates oe - Painting Report i 1 1 1 1 1 Total 3£ 6 Supplier Name WHET SLE BE eat. J. Sei seed ‘ PR sysRuy AS aqeaynaacy Amend : 7 RHE ka ue Ww rnp Jo 28, tae poyunry Kaedwos [9015 7% Boal SUICUEN, ee QU ae BE POT RT Guangzhou Zongyishun Nodestruct BARRE ULTRASONIC TEST REPORT THA Suzlon-1.25Mw | TAR SS '$1250.09.01.07 | 48840 10#-UT-O1 ENGINEERING WORK NUMBER REPORT NO. TRE Generator | FET (45D WURERE [32mm WORK NAME | Alignment | MATERIAL SPECITHICK Fixture BRR / BAEK i eee Grinding WELD METHOD JOINT SURFACE Hee All piece | bxtERIREE ASTM A-578 | #58 FBR A TEST AREA STA.PRO TEST GRADE wohl Paste aMe / SERIES | PXUP2I1 COUPLANT COMPENSATION, INSTRU.SER | ZYS-O1 PARES 2.5P20D_ K fi / RR ‘Work piece PROBE SET K VALUE BLOCK RTE S0%B-144B | FHT t SENSITIVITY SCAN_ ADJ 455. CRA BRE as) TEST RESULT (NOTES OR SKETCH) RIE ASTM A-578. brit, S27" IN AT RSIR OYA FR ZS A] BE, REHL4E (S1250.09.01.07) TEETER, ARIAS SB: According to the standard about ASTM A-578, the UT has been carried out to inspect to the meterial for the ($1250.09.01.07) Suzlon-1.25Mw. There are not defect single to be found out which should be recorded. Heat No.: 5201893020201 32mm state WHE Mei we nen TA Seven BAP Nerecron AM aM AM paTe_2ee 7, of dapATE___2007-8-20 _ DATE,

You might also like