LOCK OUT PROCEDURE - ELECTRICAL WORK 1) TAKE LOCK OUT LOCKS FROM LOCK OUT RAIL IN ELECTRICAL OFFICE

( RED ) 2) LOCK OUT LIVE D/B WERE WORK WILL COMENCE 3) BRING BACK LOCKOUT KEY (RED) PUT ON KEY SAFE (BLACK) IN ELECTRICAL OFFICE 4) KEY SAFE (BLACK) WILL BE LOCKED WITH SAFETY LOCK (WHITE) AND OPERATING LOCK ( ORANGE ) 3) SAFETY LOCK KEY (WHITE) WILL BE ISSUED TO PERSON WHO LOCKED OUT; THIS WILL BE SERVE AS PROOF THE SYSTEM BEING WORKED ON IS LOCKED OUT 4) THE OPERATING LOCK WILL BE SERVE AS PROOF THAT THE LOCK OUT KEYS IS SECURE ON KEY SAVE , AND THE KEY ( ORANGE ) WILL BE KEPt BY KOBUS OR CORNEL. 5) IF WORK IS COMPLETED KOBUS OR CORNEL MUST REMOVE OPERATING LOCK (ORANGE) WORK MAN MUST REMOVE SAFETY LOCK (WHITE ) LOCK-OUT KEYS MUST BE REMOVED BY WORKMAN (R ED) CORNEL MUST INSPECT THE WORK AREA WITH THE WORKMEN TO DECLARE THE AREA SAFE TO REMOVE THE LOCK-OUT LOCKS AND SWITCH ON THE POWER 6) RETURN LOCK OUT KEYS AND LOCKS TO LOCK OUT RAIL ( RED ) IN ELECTRICAL OFFICE THIS PROCEDURE IS OF HIGH IMPORTANCE AND WILL REGARDED AS SAFETY RISK IF NOT AD HERE TO . BY ORDER KOBUS DREYER - GMR 2.1 Signature:

You might also like