Professional Documents
Culture Documents
Lean Manufacturing - Strasser Wooden Works Autosaved
Lean Manufacturing - Strasser Wooden Works Autosaved
Unless you move your production to China, youre not going to compete, so buy from us!
Chinese
The Goals:
1. 2. 3.
1. 2. 3. 4. 5.
Over-production Defects
1
7 2
Inventory
Overprocessing
6
Waiting
3
5 4
Motion
Transportation
Pull = Make To Oder Push = Make To Stock Production based on actual demand forecast demand
Recycling:
wood = 440 trees per year paper, bottles, cans and
Three weeks after completing the Lean Manufacturing program, we were able to see concrete results that definitely exceeded our expectations
Productivity
was improved by 70% Inventory was reduced by 80% Total plan throughput was increased by 72% Lead-time was reduced by 66% Labor cost was reduced by 31% Floor space was reduced by 45%