HAI LECK ENGINEERING PTE LTD

Project Name : JUPC ETHYLENE PLANT Location : AL-JUBAIL SAUDI ARABIA AREA LINE NO

FIT-UP INSPECTION REPORT


Contract No. : 06700310 SHT NO. REV NO. SPOOL NO. Job No. : A008

Report No. : ARJU-FRPages : of Date Fit-Up : ITP NO A008-ITP-P001 ITP STEP NO. 4.0 & 5.0 Allignment Remarks

LINE CLASS

Weld No.

Joint Material 1 Size1 Sch1 Type Material 2 Size2 Sch2

Item Code ( Mat'l 1 ) Item Code ( Mat'l 2 )

Heat No. ( Mat'l. 1 ) Heat No. ( Mat'l. 2 )

Pipe Stamp

Welder ID

WPS No.

Tools/ End Internal Rod Prep Clean

GAP

Min Max Min Max

INSPECTED BY : SIGNATURE NAME DATE

ARCC-FOG

ARCC-QC

CPL

UNITED

REMARKS :

QCF-184 Rev .3