You are on page 1of 3

CONTENTS

I. II. ABSTRACT LIST OF FIGURES

TITLE
1. INTRODUCTION 1.1 Introduction to project 2. SYSTEM ANALYSIS 2.1 Existing System 2.2 Proposed System 3. SYSTEM STUDY 3.1 Feasibility Study 4. SYSTEM REQUIREMENTS 4.1 Hardware Requirements 4.2 Software Requirements 5. SYSTEM DESIGN 5.1 Input design 5.2 Output design 5.3 UML design 6. IMPLIMENTATION 6.1 Route Discovery 6.2. Route Maintenance 6.3. Data Transmission 6.4. Minimum-energy multicast tree Module 7. SYSTEM TESTING 7.1 Unit testing 7.2 Integration testing 7.3 Acceptance testing

PAGENO
1 1 3 3 4 5 6 7 7 7 8 8 9 10 13 13 14 16 16 17 19 20 20

8. CONCLUSION & FUTURE ENHANCEMENT APPENDIX A SCREEN SHOTS APPENDIX B SOURCE CODE BIBILOGRAPHY

21 23 40 49

II LIST OF FIGURES

TITLE 5.1 Data flow Diagram 5.2 Activity Diagram 5.3 Sequence Diagram 6.1 Route discovery 6.2 Discovering the shortest path

PAGENO 10 11 12 14 15

You might also like