TIEU CHUAN KY THUAT
SPECIFICATION
Section'02-Underground works,
DA NHAN/RECEIVED
RU DAWG,
CONG TY CO PHAN DAUTUM
KEANGNAM ENTERPRISES LTD.
T BEN Helece Complex Project
1 No
* 23 PEC 2011 -
RECEIVED
THIET KE KEN TRUC THIET KE KET CAU& CO BIEN
ARCHITECTURAL DESIGN STRUCTURE , M&E DESIGN
CONG TY CO PHAN
KIEN TRUC KITAKAProject: GOLDEN PALACE,
‘ TCVN 3106-1993 Heavy conerete mixture ~ Slump testing method.
% TCVN 3105-1993 Heavy concrete mixture ~ Sampling, manufacturing and sample
maintanance,
TCVN 3116-1993 “Heavy conerete ~ Water tightness determining method.
TCVN 4447-1995 “Earthwork - Construction and Acceptance regulations”
TCXDVN 374-2006 “Ready mixed concrete — Basie requirements for quality
checking and acceptance,
oe
* TCVN 5308-91 “Technical regulations on safety construction”
. TCXDVN 170-1989. “Steel structure — Erection and Acceptance.
& TCVN 1651-2008 “Concrete reinforcement part 1, 2, 3”
‘> Other reference standards.
2.13 Shop-drawings
The contractor shall conform the requirement of the technical standards and the
Specification to make shop drawings of all the works that will be executed for this project.
Included in these shop-dravings shall be:
Pattems in which the claddings will be executed. The Contractor, when making these
dravrings, shall follow the principles shown on the Contract-drawings but he may, in
concert with the Investor's representative, change-patten-plans if ‘such changes
appear to be an improvement of the original designs.
- Details of connections, jointing, fixing devices and/or any other details considered
necessary by the Architect, Such details shall be drawn at full scale.
- The drawings shall be dimensioned in the metric system (metres and millimetres).
- All shop-drawings shall be checked and approved by the Investor's representative
before they can be used for preparation, but the responsibility for correct
dimensioning and content will remain with the Contractor,
2L4 Construction method
The Contractor must compose the under ground construction method in which the
construction sequence, stipport measures in excavation process, material transportation,
enviromental protection, occupational safety, etc. are mentioned.
The construction drawing and description must be composed by the Contractor,
investigated by Indipendence Consultant and Certificated by the Authorities,
215 Monitoring of settlenents and groundwater
‘The slump observational system for ground and building must be set by Contractor's
expense before starting the construction process, to monitor the deformation and
replacement of the ground. There are at least 10 observational points inside the site and
other 10 points outside the hoarding. The observation must be taken weekly during the
basement construction, even daily if in needed. After finishing the basement construction,
it shall be taken once a month,
‘The underground water level observational system must be set on the site by Contractor’s
expense. The observation must be taken weekly during the time of basement construction
CCU 201 = Spee. - Section 02 - 2/15Project: GOLDEN PALACE.
SECTION 02:
FOUNDATION AND UNDERGROUND WORKS
2A
GENERAL TECHNICAL CONDITIONS
21.1 Works included in Lump Sum
- All the structural underground works, including general or complementary bored
piles, excavations, foundations, grillages, underground floors and miscellaneous
works according to the Specification and structural drawings.
= Checking of level lines.
- Measurement of dimensions on site.
= _ Reservations and joins needed for the other trades.
- The provision needed to prevent disorders due to the effects of dilatation and
shrinkage.
~ Testing material following current standards and requirements of Quality Controller.
~ Performance of execution method.
- Measures for stabilisation of adjacent structures surrounding the excavation area, if
needed.
~ Repair the works damaged by the Contractor, if any.
= Cleaning and removal of waste material.
21.2 Standards
‘Standards mentioned or referred to in the drawings and this Specification shall be the most
up to date versions of the Vietnamese Standards. Unless there are specific regulations in
Design drawing, The standards shall be applied in accordance with Vietnamese Standards,
and mentioned in this specification as below:
“ TCVN 2737-95 — Loading - Design standards
TCXDVN 356- 2005 Reinforcement concrete structure- Design standards
TCXDVN 338- 2005 Steel structure- Design standards
+ TCXDYN 323- 2004 High building- Design standards
“ TCXDVN 326- 2004 Bored pile - Construction and Acceptance standards
TCXDVN 358-2005 Bored pile — Ultrasonic method is used to determine the
identity of concrete
% TCXDVN 239-2006 heavy concrete - The guidance to estimate concrete strength in
building structure.
* TCVN 4506- 1987 Water for cement and grout ~ Technical requirements.
TCVN 1770-1986 Sand- Technical requirements
“ TCVN 6260-1997 Portland cement mixture - Technical requirements
* TCVN 4453-1995 Concrete structure, integral reinforcement concrete —
Construction and Accepiance regulations.
CewIT- 2011 ~ Spec. - Section 02-1715