SUNWAY CONSTRUCTION SDN BHD

Proposed Engineering, Procurements, Construction And Commissioning Works For a Central Utilities Facility (CUF) at The Bio-XCell Biotechnological Park in Nusajaya, Johor Darul Takzim. PROJECT : BIO TECHNOLOGICAL PARK CLIENT : BIO-XCELL/FOSTER WHEELER CONTRACTOR NO : PUMPMAX ENGINEERING SDN BHD NO 1 2 3 4 5 6 7 8 9 DRAWING NO SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 SWC/CUF/WWTP/DIG/013 REV NO 0 0 0 0 0 0 0 0 0 SHELL COURSE 1 1 1 1 1 1 1 1 1 JOINT NO THK (mm) SC1-LS1 SC1-LS2 SC1-LS3 SC1-LS4 SC1-LS5 SC1-LS6 SC1-LS7 SC1-LS8 SC1-LS9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 9 TO 9 HEAT NO 21118810 21118810 21118810 21118810 21118810 21118810 21118810 21118810 21118810 TANK NO
REPORT NO

FIT-UP INSPECTION REPORT

PAGE DATE 28/12/12 28/12/12 29/12/12 29/12/12 28/12/12 28/12/12 29/12/12 29/12/12 29/12/12

: DIGESTER TANK 4 : DT4-F/U-IR-LS-01 : 1 Of 1 FIT-UP REJ ACC ACC ACC ACC ACC ACC ACC ACC ACC ACC REMARKS

PREPARED / INSPECTED BY: SIGNATURE NAME DATE

WITNESSED / INSPECTED BY : SIGNATURE NAME DATE

REVIEWED BY: SIGNATURE NAME DATE

You might also like