Professional Documents
Culture Documents
4.34 Power Plant Heat and Mass Balances at Various Ccs Conditions
4.34 Power Plant Heat and Mass Balances at Various Ccs Conditions
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or completeness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, e mployees, advisers or DECC shall have any liability whatsoever for any direct or i ndirect loss howsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 02 Project Title: Document Title: Kingsnorth Carbon Capture & Storage Project Page 2 of 7
1. Introduction
This design report gives a brief overview over the mass and heat balances of boiler and flue gas cleaning including carbon capture plant following the flue gas system. Basis for all balances calculated is Kleinkopje coal, the design coal for Kingsnorth 5&6.
(9)
ESP
Flue Gas (7) Coal (2) Combustion Air (1)
IDFan
GGH
(10)
FGD
(11)
PCC plant
CO2
Gypsum
Waste Water
(12)
Steam Generator
Feedwater (3)
Figure 1: Block flow diagram of the flue gas path Explanation of the abbreviations in the above block flow diagram: ESP: Electrostatic Precipitator GGH: Gas Gas Heater FGD: Flue Gas Desulphurisation PCC-plant: Post-combustion Carbon Capture plant
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or completeness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, e mployees, advisers or DECC shall have any liability whatsoever for any direct or i ndirect loss howsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 02 Project Title: Document Title: Kingsnorth Carbon Capture & Storage Project Page 3 of 7
The process data have been calculated according to the heat balance diagrams for the following load cases: Case 1: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 6600 t/d (100.0 %) Heat Integration: No Note: Design Case Case 2: Fuel heat input: 1461 MW (80.0 %) Captured CO2: 6600 t/d (100.0 %) Heat Integration: No Case 3: Fuel heat input: 1096 MW (60.0 %) Captured CO2: 6600 t/d (100.0 %) Heat Integration: No Case 4: Fuel heat input: 880 MW (48.2 %) Captured CO2: 6600 t/d (100.0 %) Heat Integration: No Note: Case of minimum load of power plant at which full load of capture plant is still possible Case 5: Fuel heat input: 456 MW (25.0 %) Captured CO2: 3432 t/d (52.0 %) Heat Integration: No Note: case of minimum load of power plant with highest capture plant load possible at this condition Case 6: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 13714 t/d (207.8 %) Heat Integration: No Note: Full CCS Case 7: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 0 t/d (0.0 %) Heat Integration: No Case 8: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 5280 t/d (80.0 %)
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or completeness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, e mployees, advisers or DECC shall have any liability whatsoever for any direct or i ndirect loss howsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 02 Project Title: Document Title: Kingsnorth Carbon Capture & Storage Project Page 4 of 7
Heat Integration: No Case 9: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 3960 t/d (60.0 %) Heat Integration: No Case 10: Fuel heat input: 1826 MW (100.0 %) Captured CO2: 2640 t/d (40.0 %) Heat Integration: No Case 11: Fuel heat input: 1,826 MW (100.0 %) Captured CO2: 1,650 t/d (25.0 %) Heat Integration: No Case 12: Fuel heat input: 1,461 MW (80.0 %) Captured CO2: 5,280 t/d (80.0 %) Heat Integration: No Case 13: Fuel heat input: 1,096 MW (60.0 %) Captured CO2: 3,960 t/d (60.0 %) Heat Integration: No Case 14: Fuel heat input: 730 MW (40.0 %) Captured CO2: 2,640 t/d (40.0 %) Heat Integration: No Case 15: Fuel heat input: 456 MW (25.0 %) Captured CO2: 1,650 t/d (25.0 %) Heat Integration: No
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or completeness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, e mployees, advisers or DECC shall have any liability whatsoever for any direct or i ndirect loss howsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 01 Project Title: Document Title: Stream No. Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Kingsnorth Carbon Capture & Storage Project Power Plant Heat & Mass Balances at Various CCS Conditions Page 5 of 7
10
11
12
13
799.0 26.0 655.4 26.0 540.4 26.0 454.0 26.0 290.3 26.0
73.3 48.0 58.6 48.0 44.0 48.0 35.3 48.0 18.3 48.0
652.9 305.2 503.6 291.3 363.1 273.1 286.4 259.4 147.9 230.3
537.7 355.6 422.4 359.0 310.8 363.8 248.3 366.6 130.0 391.7
537.7 620.0 422.4 619.9 310.8 614.2 248.3 598.9 130.0 561.8
652.9 600.0 503.6 598.8 363.1 597.8 286.4 597.3 147.9 583.8
871.0 120.0 713.0 120.0 583.6 118.9 488.7 116.0 308.2 115.0
9.8 120.0 7.5 120.0 5.4 118.9 4.2 116.0 1.8 115.0
861.2 129.8 705.5 128.1 578.2 125.9 484.5 122.3 306.4 120.2
861.2 85.6 705.5 81.0 578.2 76.8 484.5 73.8 306.4 72.4
874.3 47.4 715.1 46.7 585.4 45.5 490.1 44.8 310.0 43.0
326.9 32.0 337.0 32.0 376.7 32.0 396.8 32.0 262.0 32.0
780.4 89.9 621.9 92.4 492.7 93.0 397.9 91.3 262.0 88.2
Case 1
Case 2
Case 3
Case 4
Case 5
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or co mpleteness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DE CC shall have any liability whatsoever for any direct or indirect loss h owsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 01 Project Title: Document Title: Stream No. Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Kingsnorth Carbon Capture & Storage Project Power Plant Heat & Mass Balances at Various CCS Conditions Page 6 of 7
10
11
12
13
799.0 26.0 798.8 26.0 799.0 26.0 799.0 26.0 799.0 26.0
73.3 48.0 73.3 48.0 73.3 48.0 73.3 48.0 73.3 48.0
652.9 305.2 652.8 305.3 652.9 305.3 652.9 305.3 652.9 305.3
537.1 355.5 538.8 356.1 537.9 355.7 538.2 355.8 538.4 356.0
537.1 620.1 538.8 620.1 537.9 620.1 538.2 620.1 538.4 620.1
652.9 600.0 652.8 600.0 652.9 600.0 652.9 600.0 652.9 600.0
871.0 120.0 870.8 120.0 871.0 120.0 871.0 120.0 871.0 120.0
9.8 120.0 9.8 120.0 9.8 120.0 9.8 120.0 9.8 120.0
861.2 129.8 961.0 129.8 861.2 129.8 861.2 129.8 861.2 129.8
861.2 83.5 861.0 87.1 861.2 85.9 861.2 86.2 861.2 86.5
873.7 47.2 874.7 47.6 874.4 47.4 874.5 47.5 874.6 47.5
679.3 90.9 874.7 89.6 799.3 89.8 818.1 89.7 837.0 89.6
Case 6
Case 7
Case 8
Case 9
Case 10
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or co mpleteness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DE CC shall have any liability whatsoever for any direct or indirect loss h owsoe ver arising from the use of the Infor mation by any party.
KCP-ENT-BLR-DRP-0001 Revision: 01 Project Title: Document Title: Stream No. Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Mass Flow kg/s Temp C Kingsnorth Carbon Capture & Storage Project Power Plant Heat & Mass Balances at Various CCS Conditions Page 7 of 7
10
11
12
13
Case 11
799.0 26.0 655.4 26.0 540.4 26.0 388.7 26.0 290.5 26.0
73.3 48.0 58.6 48.0 44.0 48.0 29.3 48.0 18.3 48.0
652.9 305.3 503.6 291.3 363.1 273.2 235.1 248.0 147.9 230.8
538.6 356.0 422.5 359.0 310.9 363.8 206.0 366.5 130.1 391.7
538.6 620.1 422.5 619.9 310.9 614.1 206.0 580.0 130.1 561.8
652.9 600.0 503.6 598.8 363.1 597.8 235.1 597.0 147.9 583.8
871.0 120.0 713.0 120.0 583.6 118.9 417.5 115.0 308.5 115.0
9.8 120.0 7.5 120.0 5.4 118.9 3.2 115.0 1.8 115.0
861.2 129.8 705.5 128.1 578.2 125.9 414.3 120.9 306.7 120.2
861.2 86.7 705.5 81.4 578.2 77.6 414.3 73.9 306.7 73.3
874.7 47.5 715.2 46.8 585.6 45.6 419.1 44.5 310.4 43.1
81.7 32.0 269.6 32.0 226.0 32.0 164.7 32.0 126.1 32.0
851.2 89.6 640.6 92.1 529.9 92.6 382.2 90.3 287.3 88.5
Case 12
Case 13
Case 14
Case 15
Kingsnorth CCS De monstration P ro ject The information contained in this document (the Infor ma tion) is provided in good faith. E.ON UK plc, its subcontractors, subsidiaries, affiliates, e mployees, advisers, and the Depart ment of Energy and Climate Chan ge (DECC) make no representation o r warranty as to the accuracy, reliability or co mpleteness of the Infor mation and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees, advisers or DE CC shall have any liability whatsoever for any direct or indirect loss h owsoe ver arising from the use of the Infor mation by any party.