You are on page 1of 1

Customers Copy

Comparative Statement of thickness of Various Layers by i-Tec -India Method

Enter length of the road in Metres Enter width of the road in Metres

1000 6 Consider length and width as unity i-Tec- India Method

srno

Description

Thickness IRC mm CBR Value % Rate per M3 Amount per sqm

Description I-tec Method mm 7500 6000 1750 min 30 6to 8 1600 500 150 450 437.5 368 250 Open Graded Premix Carpet Bituminous Macadam Zym-tec-1 Layer Subgrade 20 75 200 780 7500 6000 2100 500 150 450 420 390 60% 6to8 Rate per M3 Amount per sqm CBR VALUE % percent variation %

1 2 3 4 5

Open Graded Premix Carpet Bituminous Macadam Water Bound Macadam Granular Sub Base Subgrade

20 75 250 230 500

Total Total Cost per KM

1075

17350

1655.5 9933000

1075

16100

1410 8460000

14.83

Note-1 The offer is prepared without exact information and requirement . It is subjected to change as per market rates and proper traffic details and measurements. Note2:- The rates can vary as per prevailing market rates

20MM OGPC 75MM BM 250MM WMM 230MM GSB

20MM OGPC 75MM BM 200MM ZYMTEC-1 LAYER 780 MM SUBGRADE LAYER

500 MM SUBGRADE LAYER

i-Tec-India METHOD