Enter length of the road in Metres Enter width of the road in Metres
srno
Description
Description I-tec Method mm 7500 6000 1750 min 30 6to 8 1600 500 150 450 437.5 368 250 Open Graded Premix Carpet Bituminous Macadam Zym-tec-1 Layer Subgrade 20 75 200 780 7500 6000 2100 500 150 450 420 390 60% 6to8 Rate per M3 Amount per sqm CBR VALUE % percent variation %
1 2 3 4 5
Open Graded Premix Carpet Bituminous Macadam Water Bound Macadam Granular Sub Base Subgrade
1075
17350
1655.5 9933000
1075
16100
1410 8460000
14.83
Note-1 The offer is prepared without exact information and requirement . It is subjected to change as per market rates and proper traffic details and measurements. Note2:- The rates can vary as per prevailing market rates
i-Tec-India METHOD