1) When light is on for the lift and no request has been made to go from TF to PF, button light should

Off. 2) When passanger made request for PF, button light should ON. 3) When button light is ON and if lift is available at TF, the door should open. 4) When button light is ON and if lift is not available at TF, the indicator light should indicate the movement of lift from PF to TF. 5) When door opens, it should made a sound. 6) When passanger is in the lift, if passanger press the hold button lift door should not close. 7) If pasanger press the lift close button, it should close immediately otherwise should close automatically after fixed time. 8) If lift fan is ON, and passanger press FAN button it should get OFF or vice versa. 9) Try to call using CALL button to help persons using lift. 10) Now test for overload, if lift is for 10 persons or 100KG weight, try for 11 or 12 persons to use the lift at one time. 11) Lift door should not open when lift is moving, even after pressing lift opening button. 12) Try to use Pass button of the lift to overcome an request. 13) Let lift is at PF, it should not move to TF if no request made at TF and vice versa. 14) Let passanger get in lift from TF anf starts moving to PF, then if other request made to PF, then lift should complete first request first and come back to TF after PF. 15) If electricity get gone, Lift should not make a major jerks and starts working on emergency backup.

1. open the lift door 2. stand inside the lift 3. close the liftdoor properly 4. press the number "5" so that i can reach my destination 5. lift reaches the destination i mean fifth floor 6. Wait for the signal so that u can open the lift door 7. open the lift door 8. come outside 9. close the lift door properly 10.The lifts waits in the fifth floor unless and until it requires further signal

You might also like